Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,207,587 members, 7,999,548 topics. Date: Monday, 11 November 2024 at 09:35 AM

4 Bedroom Bungalow Enquiries on Design, Construction and Cost - Properties (3) - Nairaland

Nairaland Forum / Nairaland / General / Properties / 4 Bedroom Bungalow Enquiries on Design, Construction and Cost (43513 Views)

Design + Construction Of 7 Bedroom Family House, Enugu / Two Bedroom Bungalow Design, Construction Pictures And Cost / One Bedroom Bungalow Enquries On Design, Construction And Cost (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply) (Go Down)

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:30am On Mar 26, 2019
Evaowokotomo:
This is a demonstration sir to enlighten us, the floor plan is on page 1. He is just doing this to let us know the details and how much to build this type of house not that he is engaging on the project


Good student

2 Likes

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by dearie(m): 10:38am On Mar 26, 2019
segzy14:


Good student

Great idea...some of us are following every details with keen interest.

Kindly continue the good job.

3 Likes

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:24am On Mar 26, 2019
dearie:


Great idea...some of us are following every details with keen interest.

Kindly continue the good job.


Thank you.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:57pm On Mar 26, 2019
13. Roofing sheet

280square metres of 0.55mm
Aluminium sheet @ 1880/sqm = 526,400
Installation. = 36,400
Excludes transport,ridge,accessories
Total =N562,800

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 10:12pm On Mar 26, 2019
segzy14:
13. Roofing sheet

280square metres of 0.55mm
Aluminium sheet @ 1880/sqm = 526,400
Installation. = 36,400
Excludes transport,ridge,accessories
Total =N562,800

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:52am On Mar 27, 2019
14. Plastering
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by jiday4(m): 2:00pm On Mar 27, 2019
segzy14:
9.Blockwork After Foundation

The blockwork is 11courses(coaches)high

68bags of cement @2500. = 170,000
Sharp Sand-1tipper. @38,000. = 38,000
3,400 nos of blocks@200naira. =680,000
Labour. 3500blocks x50naira. = 175,000

Total cost of blockwork. = N1,063,000

Good day sir and great work your doing, already learning alot and I say may God bless you with more knowledge and more money in your pocket.
Pls sir help me clarify this :How many blocks of 6" can a bag of cement set. Some said 100 while another said 65.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:54pm On Mar 27, 2019
jiday4:


Good day sir and great work your doing, already learning alot and I say may God bless you with more knowledge and more money in your pocket.
Pls sir help me clarify this :How many blocks of 6" can a bag of cement set. Some said 100 while another said 65.


It varies between 65-73

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:13pm On Mar 27, 2019
More questions are welcome.

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by GoodFaith: 9:14pm On Mar 27, 2019
segzy14:
More questions are welcome.

did you fix the door from kitchen to dinner room?
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:18pm On Mar 27, 2019
GoodFaith:


did you fix the door from kitchen to dinner room?


Not yet
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 10:36pm On Mar 27, 2019
segzy14:


Not yet
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 2:32pm On Mar 28, 2019
It’s time for questions
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:14pm On Mar 28, 2019
segzy14:
It’s time for questions
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by GoodFaith: 8:19pm On Mar 28, 2019
[quote author=segzy14 post=77071586][/quote]

The living room should be open to dinner without the door
the dinner should be open to the hallway
Open consent design
Present design is compartment
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 6:18pm On Mar 29, 2019
GoodFaith:


The living room should be open to dinner without the door
the dinner should be open to the hallway
Open consent design
Present design is compartment


All right.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by completey(f): 6:41pm On Mar 29, 2019
[quote author=segzy14 post=77071586][/quote]

That opening at the visitor's toilet what is it for? And how will the occupant of the guest room enter the toilet without stepping out of the room.

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:36pm On Mar 29, 2019
completey:


That opening at the visitor's toilet what is it for? And how will the occupant of the guest room enter the toilet without stepping out of the room.

The space is for the wardrobe. The occupants of the guest room don’t need to move out of the room when they want to use the toilet. Check very well.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 10:12pm On Mar 31, 2019
Been busy, classes resume tomorrow.

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:47am On Apr 01, 2019
segzy14:
Been busy, classes resume tomorrow.

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 10:07am On Apr 01, 2019
14. Plastering
150 bags of cement @2500 = 375,000
9.8 tipper load@22,000 = 198,000
Labour. = 176,625
Total. =N 749,625

1 Like 1 Share

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:15pm On Apr 01, 2019
15. POP or PVC
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by aizakun(m): 9:38pm On Apr 01, 2019
POP
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by GoodFaith: 9:43pm On Apr 01, 2019
what is the cost for POP per sq
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:50pm On Apr 01, 2019
GoodFaith:
what is the cost for POP per sq


4,000naira for Labour and materials.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by GoodFaith: 10:03pm On Apr 01, 2019
segzy14:


4,000naira for Labour and materials.
Thanks
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Wealthycharles(m): 10:36pm On Apr 01, 2019
segzy14:
14. Plastering
150 bags of cement @2500 = 375,000
9.8 tipper load@22,000 = 198,000
Labour. = 176,625
Total. =N 749,625

This is the exact stage I'm in now, awaiting quote from my contractor, he is to give me quotes for the piping works, metal protectors for windows and lobby, and cost for plastering... This project have chopped all my money, over almost 4million gone, house never still finish.

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by timesup234: 12:25am On Apr 02, 2019
segzy14:
14. Plastering
150 bags of cement @2500 = 375,000
9.8 tipper load@22,000 = 198,000
Labour. = 176,625
Total. =N 749,625
sand and cement way too much

2 Likes

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Babs612000(m): 12:36am On Apr 02, 2019
timesup234:
sand and cement way too much
Labour very cheap.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 12:55am On Apr 02, 2019
timesup234:
sand and cement way too much


Now tell me, what is supposed to be the quantity of the sand and the cement?
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 12:57am On Apr 02, 2019
Babs612000:
Labour very cheap.


Cost of Labour can vary ,depending on factor like location

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Babs612000(m): 1:43am On Apr 02, 2019
[quote author=segzy14 post=77016717][/quote] with the length you quoted the square metre should be more than this.

1 Like

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply)

Strangest Buildings In The World (photos) / Buying A House Or Building From Scratch: Which Is Cheaper? / New 10 Flats Of 2 Bedrooms Construction In Onitsha City

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 23
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.