Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,198,927 members, 7,969,840 topics. Date: Tuesday, 08 October 2024 at 03:04 PM |
Nairaland Forum / Nairaland / General / Properties / 4 Bedroom Bungalow Enquiries on Design, Construction and Cost (43075 Views)
Design + Construction Of 7 Bedroom Family House, Enugu / Two Bedroom Bungalow Design, Construction Pictures And Cost / One Bedroom Bungalow Enquries On Design, Construction And Cost (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply) (Go Down)
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:14pm On Aug 11, 2019 |
rusep: You are welcome. This thread will be resurrected soon. 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Harpesin(m): 5:46am On Aug 12, 2019 |
Good job. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by RSAV: 6:52am On Aug 12, 2019 |
This tread is very educating. The poster also appears quite experienced and professional. In all, how much is estimated to complete this 4 bedroom bungalow? |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:30am On Aug 12, 2019 |
Harpesin: Thank you. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Muyi002(m): 6:32am On Aug 14, 2019 |
Hi Segzy, See below of what I have spent so far up to completion of foundation. I hope expenses is in order. Actual Expenses Incurred per Stage Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 72,000 Laterite = 298,000 Total = 370000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire = 2400 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 10000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 1 Share
|
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:10am On Aug 14, 2019 |
@muyi002 1. What is the thickness of your blinding? 2. Were all the materials purchased for blinding used or there were leftovers? 3. What is the size of your soakaway? 4. How many trips of laterite did you buy and what is the size of the tipper? 5. I suspect a foul play in the cement usage. (88bags to this level?) 6. Labour is cheaper in your location, why did you spend more on this? 7. I cannot see the wire mesh and the Labour for the blinding |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:10pm On Aug 14, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:12pm On Aug 14, 2019 |
Quote for POP and PVC is next which will be followed by doors and windows, sorry that I have jumped the process. 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Muyi002(m): 8:22pm On Aug 14, 2019 |
segzy14: Many thanks Segzy, See below answers 1. What is the thickness of your blinding? This varies due land topography. The thickness of the blinding is between 6 to 12 inches 2. Were all the materials purchased for blinding used or there were leftovers? As at now I have leftovers of granite, close to 6 tonnes and sharp sand of about 4 tonnes 3. What is the size of your soakaway? Size is 12ft by 8ft by 8ft deep - see pic attached 4. How many trips of laterite did you buy and what is the size of the tipper? 10 Mack's of 25 tonnes of laterite @ 28k each plus additional 15 tonnes 5. I suspect a foul play in the cement usage. (88bags to this level?) I monitored the use of 30 bags for blinding and no Stealing, I partially monitors cement use at setting blocks for foundation but lost count of 6 bags at a point cement for half DPC was also monitored with no stealing. 6. Labour is cheaper in your location, why did you spend more on this? I don't understand how mean by spending more. Where was money more spent, kindly explain 7. I cannot see the wire mesh and the Labour for the blinding. The wire mesh was used for the half DPC and it's embedded. The total labour cost agreed was 180k and this covered digging, blinding and block setting to lintel level and for this purpose 80k has been paid 1 Like
|
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by ZACHIE: 8:32am On Aug 15, 2019 |
segzy14:Waiting patiently for the reviews of quotes |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:30am On Aug 16, 2019 |
@muyi002, I was banned yesterday . |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 10:30am On Aug 16, 2019 |
@muyi002, 150mm to 1foot is too much for blinding that was why it consumed too much cement. Labour for laterite filling is much,4K per trip is fine.4k x11=44k not 70k By the way, did you engage an engineer or it was DIY? 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by jabolo(m): 10:51am On Aug 16, 2019 |
Good morning segzy and thanks for this thread. One quick observation, no rod reinforcements was required until the lintel? Is that correct? You had no pillars? |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:11am On Aug 16, 2019 |
jabolo: Yes, there are no pillars and that was why we used headcourse but if are doing a parapet, you must use pillars. 1 Like 1 Share |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Muyi002(m): 1:55pm On Aug 16, 2019 |
segzy14: Dear Segzy, I honestly like you for what you are doing on this forum and topic. I had engaged an engineer who advised at least 6 inches high is good for the blinding for a trench depth of 2feet (600mm). As per the laterite, in terms of trip for you how many tonnes will be a trip as mine is 5 tonnes per trip and what i used was a big truck (Mack) which took 25 tonnes at a go. However, does this have any adverse effect on building (i mean the blinding at that height)? |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 4:11pm On Aug 16, 2019 |
Muyi002: No adverse effect on the building but adverse effect on the cement and sand. Lol. 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:48pm On Aug 19, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 10:00am On Aug 23, 2019 |
Thread reviving |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:47pm On Aug 23, 2019 |
The total area is 190sqm. The cost of POP is 3000/sqm x 190sqm= N570,000 While For the PVC it depends on the type but I will make use of the China, which is 0.2mx 4m=0.8sqm x10numbers in a pack= 8sqm 190sqm/8sqm= 24pack@4900 per pack= N117,600 The small clip is N300/one. 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 4:55pm On Aug 24, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:53am On Aug 26, 2019 |
Coming up. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:19pm On Aug 27, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 4:26pm On Aug 30, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:34am On Sep 01, 2019 |
Doors and windows are next. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:59pm On Sep 02, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:26pm On Sep 03, 2019 |
Sorry for the delay |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:13am On Sep 05, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:17pm On Sep 05, 2019 |
Time is the issue in this case. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Muyi002(m): 6:59am On Sep 06, 2019 |
Dr. Segzy, Please how many parapet planks can be found in 1 by 12 plank |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:44am On Sep 06, 2019 |
Muyi002: What type of parapet do you want to do? Step, curve type? |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply)
Nigeria Should Ban Interment Of The Dead In Their Compound. / Samsung AC Price In 2015 Vs 2024 / Man Builds A House For A Poor Widow In Imo (Photos)
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 34 |