Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Hamthablow(m): 6:52pm On Nov 04, 2019 |
Good evening brother, please how much is Metcoppo Aluminium 0.55mm as at today. |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 11:48am On Nov 05, 2019 |
Hamthablow: Good evening brother, please how much is Metcoppo Aluminium 0.55mm as at today. N1,700 per square meter |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 12:39pm On Nov 06, 2019 |
Still available for sale |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 6:23pm On Nov 10, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 10:11am On Nov 16, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 10:30am On Nov 17, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 11:25am On Nov 20, 2019 |
[quote author=HsLBroker post=84104906][/quote] |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 5:58am On Nov 24, 2019 |
[quote author=HsLBroker post=84199744][/quote] |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 6:52am On Nov 25, 2019 |
[quote author=HsLBroker post=84199744][/quote].... |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 9:30pm On Nov 25, 2019 |
HsLBroker: This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles is more than long-span and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is if you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 4:50pm On Nov 27, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 8:44am On Nov 29, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 5:56am On Nov 30, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 9:43am On Dec 01, 2019 |
[quote author=HsLBroker post=84311756][/quote] |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 10:50am On Dec 03, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Bankyshinani(m): 5:33pm On Dec 03, 2019 |
what is the current price list of aluminium roofing sheet and asbestos? |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 2:25pm On Dec 08, 2019 |
Bankyshinani: what is the current price list of aluminium roofing sheet and asbestos? long span, stepped tiles or metcopo, 0.45mm or 0.55mm |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Bankyshinani(m): 12:15pm On Dec 10, 2019 |
HsLBroker: long span, stepped tiles or metcopo, 0.45mm or 0.55mm I want to know the prices of all so dat I can select among them? |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 2:12pm On Dec 12, 2019 |
Bankyshinani:
I want to know the prices of all so dat I can select among them? Good day sir. Here is our prices: Long span , 0.45mm N1, 150, 0.55mm N1, 550 Steptiles 0.45mm N1, 250 , 0.55mm N1, 650. Metcopo 0.45mm N1, 350 0.55mm N1, 700 Thanks |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 7:31am On Dec 14, 2019 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 5:04am On Dec 15, 2019 |
HsLBroker: This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles is more than long-span and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is if you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Rico96(m): 9:00am On Jan 04, 2020 |
HsLBroker:
Good day sir. Here is our prices:
Long span , 0.45mm N1, 150, 0.55mm N1, 550
Steptiles 0.45mm N1, 250 , 0.55mm N1, 650.
Metcopo 0.45mm N1, 350 0.55mm N1, 700
Thanks where can I locate you? |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 11:44pm On Jan 04, 2020 |
Rico96: where can I locate you? mulelro |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 4:55pm On Jan 15, 2020 |
|
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 11:23am On Jan 16, 2020 |
Hamthablow: Good evening brother, please how much is Metcoppo Aluminium 0.55mm as at today. |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 12:39pm On Jan 17, 2020 |
email: lifelightproperties@gmail.com |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by buddie(m): 11:36am On Jan 18, 2020 |
@HsLBroker Happy new year to you. Can you proffer answers to these questions please?
what brand of Aluminium sheets are used to produce your roofing sheets? How many years of guarantee do you provide for your roofing sheet? Is it the popular Bozak brand of sheets or something else? Are the thickness of what is quoted and sold actually guaranteed to be correct? What is your current prices for 0.45 and 0.55 steptiles sheet? If 0.45m sheet is used for the roofing, is there a law that states that 0.55m alone can be used for the Flat sheets and cladding? Typically takes your team how long to cover a 4 bedroom bungalow with woodwork completed? Which customers can provide good referrals for your jobs previously done here on nairaland please? 1 Like |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 6:27pm On Jan 19, 2020 |
buddie: @HsLBroker Happy new year to you. Can you proffer answers to these questions please?
what brand of Aluminium sheets are used to produce your roofing sheets? bozak How many years of guarantee do you provide for your roofing sheet? 50 years Is it the popular Bozak brand of sheets or something else? Yes Are the thickness of what is quoted and sold actually guaranteed to be correct? Yes, come to site with your caliper to test What is your current prices for 0.45 and 0.55 steptiles sheet? 1, 300 N1, 650 If 0.45m sheet is used for the roofing, is there a law that states that 0.55m alone can be used for the Flat sheets and cladding? there is no law to that presently in Nigeria. Typically takes your team how long to cover a 4 bedroom bungalow with woodwork completed? 2 Days Which customers can provide good referrals for your jobs previously done here on nairaland please? they are many, majority are anonymous, guest on nairaland i mean, and those that even register may not show up because they know their family and friends are here, and they may not want to expose their personally properties for the reasons best know to them, and they are hiding their identities, so-therefore, this is a forum and many people are hiding from each others for reasons best know to them. I believe you understand what i mean, thanks 1 Like |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by buddie(m): 5:35am On Jan 24, 2020 |
HsLBroker: Thanks for the response..Would get back to you shortly |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 4:26am On Jan 25, 2020 |
buddie:
Thanks for the response..Would get back to you shortly ok sir, you are welcome sir, waiting your respond sir |
Re: 0.45mm Gauge Aluminum Longspan Now Selling @ N1, 070 And 0. 55mm N1, 450 by Nobody: 1:16pm On Jan 31, 2020 |
email: lifelightproperties@gmail.com or call 08182481552 |