Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,207,537 members, 7,999,360 topics. Date: Monday, 11 November 2024 at 05:41 AM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1260) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4817280 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (1257) (1258) (1259) (1260) (1261) (1262) (1263) ... (3776) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 7:51am On Nov 18, 2019
Dennis3D:
Hello House

I need response to this...

*Material is how much per square meter*?

*Labour is how much per square meter for POP work only. Average Design.*
Around 2000 naira each
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 8:03am On Nov 18, 2019
Rubbiish:

Around 2000 naira each
for labour only? Or with materials?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 8:07am On Nov 18, 2019
twinskenny:
for labour only? Or with materials?
Around 2k for labour & another 2k for materials

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 8:21am On Nov 18, 2019
Rubbiish:

Around 2k for labour & another 2k for materials
oh ok
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by donokoh(m): 9:59am On Nov 18, 2019
Good morning every one. pls were can get vibrated blocks around Ago place okota Lagos and at what rate.
I also what to find out the difference in terms of qty btw hand moduled blocks and vibrated blocks cause my engineer Insists on vibrated blocks .
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 10:22am On Nov 18, 2019
yinkaoke:
Good day all great people.
Please house help me verify this quotes from my carpenter for roof work seems high in my view:
2x4 wood 150 pieces @N500each 75000
2x3 140 pieces @ N400each 56000
2x2 logging below 240pieces N300 72000
White slate solo 210pieces @1450each 304500
Rigid scalp thick one 6poeces 2500 each 15000
Nails 4n3 inches 1bag each 16000
Facing board 18pieces @2200 39600
Pan nail slate nail 4packets @1500 6600
Binding belt 4800



Please professionals,professional carpenter's building engineers, suppliers n experience person please help me review this if it fine.
I am building a small 4bedrooms on a half plot.
Thanks as l appreciate ur kind assistance in this regard.


THE PRICES ARE NOT HIGH - you can also walk into a sawmill to confirm yourself.
ON THE QUANTITY? No1 can tell you if its high or low; unless the Architectural drawings is made available...

CC: Takoro13

Goodluck
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Conceptman: 11:08am On Nov 18, 2019
Call us for your aluminium windows and doors, we offer quality and affordable service @ concept Aluminium services, talk to us on 09034377258whatsapp
Email: conceptaluminiumservice@yahoo.com
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 1:18pm On Nov 18, 2019
saydfact:


THE PRICES ARE NOT HIGH - you can also walk into a sawmill to confirm yourself.
ON THE QUANTITY? No1 can tell you if its high or low; unless the Architectural drawings is made available...

CC: Takoro13

Goodluck

Thanks for your response, however, I am using slate and not aluminium or any fancy roofing sheets, so I expect it to be of a lower price in total but was surprised
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nozzle(m): 1:30pm On Nov 18, 2019
Good morning
Engineers in the house

I am doing a slab to cover my soakway....12ft by 10ft. Please can i get a quote of how many16mm rod i would require so as to be able to carry the weight of a car.

Please help guys.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 2:21pm On Nov 18, 2019
yinkaoke:


Thanks for your response, however, I am using slate and not aluminium or any fancy roofing sheets, so I expect it to be of a lower price in total but was surprised

'SLATE' and ALUMINIUM LONG SPAN requires about same wood..... its only special roofs that require more wood...

the only thing people can check for you (without seeing the plan) is the cost of each wood - You dont need people for that, just walk into any sawmill and find out OR check prices of wood in Nigeria on google..

Goodluck
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nozzle(m): 6:00pm On Nov 18, 2019
Nozzle:
Good day my ppl
Engineers in the house

I am doing a slab to cover my soakway....12ft by 10ft. Please can i get a quote of how many16mm rod i would require so as to be able to carry the weight of a car.

Please help guys.

Where are our builders and structural engineers....i need your help
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by futurism: 7:38pm On Nov 18, 2019
Nozzle:


Where are our builders and structural engineers....i need your help


It seems people ignore and select the questions they answer here these days. Unlike before. I hope they help you out sha
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 7:48pm On Nov 18, 2019
Rubbiish:

Around 2k for labour & another 2k for materials



Labour is 1k

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 7:52pm On Nov 18, 2019
segzy14:



Labour is 1k
The least i have spent on labour is 1.5k
None have accepted less than that
It is usually 1.5k to 2k recently
Maybe because u give them job frequently & ur location though
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 7:52pm On Nov 18, 2019
donokoh:
Good morning every one. pls were can get vibrated blocks around Ago place okota Lagos and at what rate.
I also what to find out the difference in terms of qty btw hand moduled blocks and vibrated blocks cause my engineer Insists on vibrated blocks .



The compressive strength of the vibrated block is more than the hand mould.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gbadexy(m): 8:37pm On Nov 18, 2019
futurism:


It seems people ignore and select the questions they answer here these days. Unlike before. I hope they help you out sha
It's best specific engineers' monikers are mentioned so that they can respond.
They may not be chanced to follow the thread regularly but once mentioned, they would see it anytime they are online.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 8:39pm On Nov 18, 2019
segzy14:



The compressive strength of the vibrated block is more than the hand mould.
bros, i must say to the world that the hand moulding blocks are far strong to so call vibrated block at considerate number.
what constitute a good and strong blocks are: soil type, handler/moulder, water ratio and season, quantity per bag, cement status and so on. the first set was not good as the subsequence set set till end.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 9:08pm On Nov 18, 2019
Takoro13:

bros, i must say to the world that the hand moulding blocks are far strong to so call vibrated block at considerate number.
what constitute a good and strong blocks are: soil type, handler/moulder, water ratio and season, quantity per bag, cement status and so on. the first set was not good as the subsequence set set till end.


All things being equal, they can never have the same strength. Take them to the laboratory and see for yourself.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 9:09pm On Nov 18, 2019
Nozzle:
Good morning
Engineers in the house

I am doing a slab to cover my soakway....12ft by 10ft. Please can i get a quote of how many16mm rod i would require so as to be able to carry the weight of a car.

Please help guys.
Some experts here stated 12mm can safely carry the weight of a car for soak away, so u may not be needing 16mm.
Cc bixton
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by futurism: 10:52pm On Nov 18, 2019
gbadexy:

It's best specific engineers' monikers are mentioned so that they can respond.
They may not be chanced to follow the thread regularly but once mentioned, they would see it anytime they are online.
okay.

I have question which I will like to ask.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by donokoh(m): 12:14am On Nov 19, 2019
segzy14:



The compressive strength of the vibrated block is more than the hand mould.
ok. thanks.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Cypost: 12:56am On Nov 19, 2019
Hi my people
do one need pressure pipes to run waste through the chambers to the soakaway. I just got i quote for 20 pieces of 6' pressure pipe at 5.5k each and sundry sizes of pressure pipes for this external plumbing work. It sounds odd to me.

what size/type does one need to run waste chambers and soakaway things.
the insight will be appreciated.


B/w
anyone can suggest good service in mainland for laying interlocking stones
Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 5:13am On Nov 19, 2019
Rubbiish:

Some experts here stated 12mm can safely carry the weight of a car for soak away, so u may not be needing 16mm.
Cc bixton

Sure.
Since its just the slab you can run your beams on the block wall/matting with 12mm and place on a good concrete mix over it.

Cc..Nozzle
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Sweetchilli(f): 5:53am On Nov 19, 2019
Hello all. I'll be needing an urgent reply please. Is it possible for 35m to build a block of 4 flats (2 ensuite bedrooms ). This would include Aluminum roofing, POP, wall screening, painting, all toilet finishings including walk in shower cubicle, gate house and gate, generator house, all plumbing, electrical and mechanical works, interlocking, windows and doors,(Turkish doors) full tiling (Nigeria tiles) etc.
Can 35m build it from start to finish?
I got this quote from a builder. Is it feasible?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 6:05am On Nov 19, 2019
Sweetchilli:
Hello all. I'll be needing an urgent reply please. Is it possible for 35m to build a block of 4 flats (2 ensuite bedrooms ). This would include Aluminum roofing, POP, wall screening, painting, all toilet finishings including walk in shower cubicle, gate house and gate, generator house, all plumbing, electrical and mechanical works, interlocking, windows and doors,(Turkish doors) full tiling (Nigeria tiles) etc.
Can 35m build it from start to finish?
I got this quote from a builder. Is it feasible?

How many rooms per flat? You mean two bedroom each ensuite?

Pending your reply, my advice is this:

1.Get quotations from different contractors


2. Get a quotation, estimate or bill of quantities to assess quotations from contractors

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 6:07am On Nov 19, 2019
Johnadelaide00:
Please house, what is the cost of suspended ceiling per SQM

I use 2,500
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 6:08am On Nov 19, 2019
Dennis3D:
Hello House

I need response to this...

*Material is how much per square meter*?

*Labour is how much per square meter for POP work only. Average Design.*


The minimum for labour is 1k and the max is 2k

Material is usually minimum of 2k and maximum of 3k. Depending on the design sha
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 6:10am On Nov 19, 2019
donokoh:
Good morning every one. pls were can get vibrated blocks around Ago place okota Lagos and at what rate.
I also what to find out the difference in terms of qty btw hand moduled blocks and vibrated blocks cause my engineer Insists on vibrated blocks .

Vibrated blocks are far better. You can read online about this.

People here may give divergent views
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 6:15am On Nov 19, 2019
Nozzle:
Good morning
Engineers in the house

I am doing a slab to cover my soakway....12ft by 10ft. Please can i get a quote of how many16mm rod i would require so as to be able to carry the weight of a car.

Please help guys.

If cars will be on your soakaway, ensure the structural components of your soakway can withstand this. Will the slab sit on blocks or on beams and /or columns? I prefer the the latter anyways.


You will need between 7/8 lengths depending on the spacing
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 6:21am On Nov 19, 2019
megacontrol:
Thanks for the detailed response.

Yes I am still keen on molding the blocks on site, below are some of the extra info you requested;
- We will use both sand and stone dust mixture
- We are looking to hire the molding machine and labor required
- I don't know the different type of machine, i just know of vibrated block making machine

Leads me to next set of questions...
What are the rates to hire molding machine and what is rate for labor per block?
What is the desirable sharp sand & stone dust mix ratio?
I understand the 30-40 blocks per bag of cement part, but how many cement needed for 1 trip of sand (just as example)?


If i have these info, then i can do the numbers and work out my material list and cost to achieve the total quantity i need.

Thanks



I am so sorry, I should have replied.

I will reply shortly by modifying this post.

Thanks


Depending on the some factors, labour per block moulding is NGN30-50

If you want to have 35block per bag of cement you will use 1:19.

5 ton tipper of sand or dust will produce atleast 300blocks.

I don't know the cost of hiring for block moulding machine

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dominionng(m): 7:18am On Nov 19, 2019
Rubbiish:

The least i have spent on labour is 1.5k
None have accepted less than that
It is usually 1.5k to 2k recently
Maybe because u give them job frequently & ur location though

Labour: N1,000 - N2,500 depending on how complex the design is.

Materials: N2,000 will NEVER be enough for materials alone even if you want a flat ceiling.
Range is N3,000 - 4,500 depending on the design

Materials and Labour: N4,000 - N6,000 depending on designs.
There is also this discount on volume.

Attached are 3 different designs, definitely rates can't be same

2 Likes 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dominionng(m): 7:34am On Nov 19, 2019
^^^^ A guide...
Dominionng:


It is charged per sqm. Volume, location and most importantly type of design are major factors in deciding rates per sqm. Don't let anyone deceive you that there is a fixed rate per sqm for POP ceiling.
There is what I call
Budget designs(image 1),
Average design(image 2) and
Luxury design(image 3)
In budget designs, one is expected to use a bag of POP cement for 2.8 - 3sqm, 2 - 2.5sqm for average designs and 1 - 1.5sqm for luxury designs. So, since materials involve and time to achieve these designs ain't same, it is expected for rates to vary. Talk of quality ceiling or POP Precast vs Plasterboard is a discussion for another day.
At the moment based on the present hike in POP materials, you can get a good ceiling from 4,000/sqm. Maybe a little lesser if your project is in the eastern part of the country(POP materials is cheaper in the east at the moment).

(1) (2) (3) ... (1257) (1258) (1259) (1260) (1261) (1262) (1263) ... (3776) (Reply)

Viewing this topic: joetoocute

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)