Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 3:11am On Nov 26, 2019 |
That's what we do
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KolaShangOne(m): 7:25am On Nov 26, 2019 |
twinskenny: I even thought those prices of cables were too cheap. 16mm for 700 naira per yard. I think Coleman sells 1.5mm for about 10k or so. Purechem 8k.. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KolaShangOne(m): 7:36am On Nov 26, 2019 |
Hamthablow: Cost of your aluminium covering depends on your woodwork. Although I can't see the drawing clearly, its estimated to cost between 700-800k. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KolaShangOne(m): 7:39am On Nov 26, 2019 |
Udometuk5103: You would be using angle irons for rafters and Z-purlins as purlins. A quote would require more details. 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KolaShangOne(m): 7:41am On Nov 26, 2019 |
Timmie101: Can you travel to work in Port Harcourt |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 8:31am On Nov 26, 2019 |
KolaShangOne:no sir price is low now.. 1.5mm is 5k 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by emman44(m): 12:12pm On Nov 26, 2019 |
kopell:Reply: The system does a fast separation of solid and liquid... The Digester is two layers 1. The upper layer where the all degradable material are been digested 2. Lower layer where the water is been filter and go out to the pit created for dry land and drainage or canal for high water level.... The upper layers consist of fibre which create micro-organism in thousands that feed on the waste while the lower layer consist of filters that make the water going out odourless and environmental friendly.... Note: sewage Diegester does not produce gas Call Engr. Taiwo 07066474055 M&E consultant |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by emman44(m): 12:28pm On Nov 26, 2019 |
PrinceLat: Reply: Advantage of sewage Diegester 1. No odour 2. No evacuation, 3. Little space required 4. Cheaper than the spetic tank Disadvantage The use of condoms and sanitary pads.. But if it is for hotel we have another design for that.. Note : 25years is just the warranty we are giving, the Digester can be effective more than 50year.. If we are to do any maintenace from the little little particles create over the years we just have to remove the slab and change the fibre..... Thanks Engr: Taiwo M&E consultant 07066474055 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ak22(m): 7:28pm On Nov 26, 2019 |
Good evening every engineer in the house Can someone explain this to me please
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by abdulwastecx(m): 7:53pm On Nov 26, 2019 |
diordaves: 1. You will need to have a detailed soil test with at least one borehole test of not less than 30m, soil samples taking from this borehole test is then taken to the lab to estimate the cohesion and angle of friction for each soil strata (layers). Together with the structural design, the settlement can then be easily estimated. diordaves:It can be avoided if the appropriate design considerations are assumed and adequately check against during the foundation design stage. All building settled but there is a limit to which such settlement impaired on plumbing, electrical, or other functionality( serviceability problem) or totally unfit to use ( Ultimate limit state). I always check against settlement for all the isolated pad footing of a foundation over expansive clay to know the differential settlement of the pad ( uniform settlement is more desirable than a differential settlement for pad footing). For a raft footing, it is compulsory to check settlement for the foundation. 1. You will need to have a detailed soil test with at least one borehole test of not less than 30m, soil samples taking from this borehole test is then taken to the lab to estimate the cohesion and angle of friction for each soil strata (layers). Together with your structural design you can then es 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Kenjoseph12: 10:32pm On Nov 26, 2019 |
HOW TO MAKE 500K MONTHLY IN REAL ESTATE WITH ZERO CAPITAL . GUARANTEED The Number 1 Biggest Secret Anyone Can Use To Build A Thriving Real Estate Business That Pulls In A Minimum of N500,000 Per Month Starting With Zero Naira Guaranteed!" DISCOVER HOW TO EARN MILLIONS FROM LEKKI REAL ESTATE MONEY MAKING OPPORTUNITIES . Welcome to the Real Estate Money Making Opportunity that has made many Real Estate consultants Millionaires . Am about to introduce to you Real estate companies that will earn you Millions of Naira in few weeks from now. They own over 52 affordable penny estates here in Lekki Lagos Nigeria. HOW TO BECOME A CONSULTANT AND MAKE MONEY. The company uses Network Marketing System to sell their estates, so you earn commission on your direct and Indirect sales. You get paid 15% commission on direct sales and 5%, 3%, and 2% commission on indirect sales from people you refer to them and great Incentives such as All expenses Paid trip to USA, UK, Dubai, South Africa, and Brand new Car award to the highest sellers.. The secret to success in this business is Recruit as many marketers as possible, never underestimate anyone because you don't know who has the contact to generate sales that will earn you commission.. HOW TO BEGIN YOUR REGISTRATION* If you are convinced you can market real estate, then send a WhatsApp message and you will be forwarded with links to register. Once you complete your registration, you will be added to our whatsapp group where you will see all the properties we market plus how we market them. To get started, you will have to register with all our partner companies for free . after which You will be given your links to recruit serious marketers into the business. This business has changed many lives and will change yours too…. NOTE: You can participate in this business opportunity from any part of the world and its100% FREE to become a Consultant. CONTACT ME TO FORWARD YOU THE LINKS TO REGISTER AND FURTHER GUIDE YOU THROUGH. ELVIS , For Trustenable Ltd WHATSAPP: 08118050111 ..... |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Olazzeedris(m): 11:00pm On Nov 26, 2019 |
ak22: what you have is called bill of quantity Colomn A is for cutting of land area cover 849 m3 colomn B is for Filling of the land area covers 206 m3 ditto to others Then you multiply by the unit rate provided for eash items. 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Zino89: 11:22pm On Nov 26, 2019 |
Please is this quotation OK for a four bedroom flat foundation? 1ton of 16mm #205,000, 1ton of 12mm #205,000. 50 lengths of 10 mm @1,500= #55,000. 30 ton of Granite #150,000. 2 bundle of Binding wire #18,000. 2bags of nail #16,000. 130psc of 2*3 @ 250= #35,500. 200psc of 1 *12 planks @1,150 =#230,000. 3 sharp sand @ 37,000 = #111,000 . 100 peg @150 = #15,000 Total for materials #1,040,000 Cement not included Workmanship, pilling, pegin, carpenter, iron bender and casting #400, 000 |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by timesup234: 1:55am On Nov 27, 2019 |
Zino89:are you building a duplex or bungalow? 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 6:49am On Nov 27, 2019 |
Gud morning here, my boss in the house, it has been very long Time here, I wan na say , wonderful morning here , |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 7:57am On Nov 27, 2019 |
ak22: Well. That's an unpriced bill. You're expected to quote for it using the detailed explanation of works (on the left) and the quantities (right). Add your fees, contingencies and arrive at a total sum. Eg. Item E. 600mm thick paving stone laid on......... Etc 308m² The question is how much would you do 1m² of paving block.? Let's assume it's 550 naira per paving block. Draw 2 lines in front of the table, label the first *RATE (N)* and the second *TOTAL (N)* under rage write 550, under total write 169,400 (ie 550 x 308). Do that for all items. Add your supervision fees, VAT, contingencies etc *Final Note* Your rate should include materials and labour cost For Item F. 1. How much would you charge to produce 1m of Kerbs (you'll be given the design or propose one) 2. The Kerbs must pass a concrete test (cube test) after 28 days to the required strength stated in the bill.. Ie 21Nsqm 3. How much would you charge to install the kerb per meter. 4. Add profit and attendance 5. What's the total cost of production and installation?? Multiply your total cost to produce 1m of Kerbs by 17m (total length needed) Goodluck 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:01am On Nov 27, 2019 |
Zino89: Where is your land located... Obviously from the quote it shd be Ajah, Lekki or any other waterlogged area. Can you share the plan Note.. Doesn't look excessive for a waterlogged land. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ak22(m): 9:08am On Nov 27, 2019 |
saydfact: You are the best thanks and thank all. 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Zino89: 10:01am On Nov 27, 2019 |
timesup234:its a bungalow |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Zino89: 10:05am On Nov 27, 2019 |
saydfact:it is located at iyana isashi ..... The land is a bit swampy
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 10:30am On Nov 27, 2019 |
Zino89: From quick approximate calculations. 16mm of 1 tonne is OK. 10mm of 50 length is short, I got about 105 lengths using 1200mm raft height and 250c/c (ask him for the raft height and spacing he plan to use - anything less is not ideal) 12mm - what does he need it for? If it's for German floor matt, he shd use 10mm at 175mm spacing and buy 1 tonne. 1by12 by calculation I got about 140 pcs without waste, so buy 160pcs instead of 200pcs. I'm OK with others... Note... The workman's quote is sincere. I'll advice you give him the job. Goodluck 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 4:03pm On Nov 27, 2019 |
saydfact:U should rather be asking what he needs 16mm for in a bungalow? 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 4:05pm On Nov 27, 2019 |
Zino89:If u are building a bungalow, why am i seeing 16mm when u can use 12mm? |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by tevanso(m): 4:20pm On Nov 27, 2019 |
Rubbiish:y not ask him to do a structural drawing |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 4:23pm On Nov 27, 2019 |
tevanso:Is structural drawings for bungalows necessary? Structural drawings for bungalow is not required for building approval |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 4:33pm On Nov 27, 2019 |
Rubbiish: I think he included pilling in his post. The question to ask is what is the nature/type of the land.. Cc..Zino89 |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by tevanso(m): 4:35pm On Nov 27, 2019 |
Rubbiish:not for approval, but to avoid guess work and accuracy |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 4:38pm On Nov 27, 2019 |
bixton:Just saw it now Pile foundation for a bungalow, is the land that bad? cc Zino89 |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Zino89: 5:15pm On Nov 27, 2019 |
bixton:yes he included pilling .the land is mini swamp |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Zino89: 5:34pm On Nov 27, 2019 |
Rubbiish:its not that bad |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Zino89: 5:35pm On Nov 27, 2019 |
Rubbiish:i wonder oooo |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 5:58pm On Nov 27, 2019 |
Rubbiish: LOL..... Well... He needs it sir. Regards |
(1) (2) (3) ... (1263) (1264) (1265) (1266) (1267) (1268) (1269) ... (3762) (Reply)
Viewing this topic: Beframia
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 66 |