Nairaland Forum / Nairaland / General / Politics / Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project (21806 Views)
40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After / The 40MW Dadin Kowa Hydropower Project In Gombe (Photos) / See 40MW Kashimbila Hydro Power Dam In Taraba Delivered As Promised By Buhari (2) (3) (4)
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by itsene: 3:07pm On Dec 05, 2019 |
SODbaba2:Big river, big dams, big megawatts! Feasibility studies must have shown that only about 40MW could be supported. Dry season might affect capacity also. 2 Likes |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by SUFFERInSMILIIN(m): 3:07pm On Dec 05, 2019 |
SODbaba2: At least you are a bit educated. 500 megawatts is too small if you were going to build 500 megawatts you need at least 40 of them to make Nigeria self-sufficient in electricity |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by barryj1: 3:18pm On Dec 05, 2019 |
My ogun state Governor where art thou? |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Conceptman: 3:20pm On Dec 05, 2019 |
SUFFERInSMILIIN:this is so funny but the bitter truth, if in this century we are still here then it's a pity |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by SUFFERInSMILIIN(m): 3:21pm On Dec 05, 2019 |
itsene: Nigeria has huge river why are they building dams in the North which are dry when do hall of Southwest and south-south have a lot of water. The German company Siemens did a visibility study and found out Nigeria can build a 5000 megawatt Dam on the River Niger in south south. This study was done in 1995 and nothing is done up to today we are building dams in the north of Nigeria which is desert 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by shiwex: 3:22pm On Dec 05, 2019 |
Can someone please tell me roughly how many homes can 40MW power. I dont know so just asking. want to have a rough idea where we are and where we are going. 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Nobody: 3:26pm On Dec 05, 2019 |
christejames: every dam is by definition a source of power, because you are holding back the flow of water which is all you need to power a turbine. People who live in remote areas in some countries even dam streams near their homes with micro hydro power turbines https://www.youtube.com/watch?v=LWqFEF2Ov4c 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by shiwex: 3:29pm On Dec 05, 2019 |
SUFFERInSMILIIN: The issue with dams is that you dont control the water supply . What if one of the source countries decides to build a major dam....then water that you need for your dam is affected. currently Egypt and other countries are having issues with ethiopia building a dam. 2 Likes |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Hardeybohwarley(m): 3:29pm On Dec 05, 2019 |
christejames:Kariya, aina a Gombe. Ina Ashaka and Huta ba stable ba ne. |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by FriendNG: 3:34pm On Dec 05, 2019 |
olaboy33: is this a state government project? |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by 27Pushing30: 3:42pm On Dec 05, 2019 |
olaboy33:Azzin I just dey laugh ... The man is ambitious sha , he’s really keen on contesting presidential in ‘23 |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by E2000: 3:44pm On Dec 05, 2019 |
GidifeedNews:What is it with Nigeria always looking majorly with generating power from water? What about other viable means? |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by MrBONE2(m): 3:56pm On Dec 05, 2019 |
SUFFERInSMILIIN:
|
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by jahsharon: 4:00pm On Dec 05, 2019 |
darfay: One president from South-South Nigeria used several millions of naira with fun fare and Aso-Ebi to commission the map of the 2nd Niger Bridge on drawing board. What do you say about that? Buhari is currently building the physical bridge. So, keep shut before Thunder stikes you. 2 Likes 1 Share |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by adecz: 4:14pm On Dec 05, 2019 |
Another PDP project commissioned!!! We never knew it was possible for another party to come & perform so woefully that a discredited party like PDP will start looking like saints. A few days back, Bubu went to Kaduna to commission an ultramodern 44 Army Hospital built by PDP. We are awaiting for the current govt to commission even one single project they started or initiated. The current govt is like an impotent man going about accepting children from concubines & acting as father in all naming ceremonies!!
|
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by slimthugchimee2(m): 4:21pm On Dec 05, 2019 |
samuelshosanya: Lol mosque using 18000mw, which Kind lie be this abeg? 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Mrsserene: 4:29pm On Dec 05, 2019 |
What is drawing some people back is that they never see good in anything. The only thing they are good at is insulting Buhari and wishing Nigeria bad. Back to sender abeg. |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by webngnews: 4:30pm On Dec 05, 2019 |
Oh |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by matrixme(m): 4:36pm On Dec 05, 2019 |
shiwex:Oga Einstein, River Niger at Onitsha is flowing to the Niger Delta, and simultaneously into sea. No other countries will be affected if an actual dam is built. It's just plain willpower. Like the stupid idea of piping oil up north to site a refinery. |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by AyeMoJuba: 4:40pm On Dec 05, 2019 |
NaijaCelebrity: ...and this @ the bold....is supposed to be which Language? |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Nobody: 4:44pm On Dec 05, 2019 |
SODbaba2: You are ignorant, don't you know power generation is highly capital intensive? How much is Nigeria budget? Harvard University budget is higher than Nigeria's |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by AmazingELixir: 4:46pm On Dec 05, 2019 |
Dangote Style....Chinese construction indian project management |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Iziquiel(m): 4:56pm On Dec 05, 2019 |
samuelshosanya:This is impossible. Jeddah has a population of around 4.8m people. The whole residents and industries in Jeddah can't consume 18,680MW of electricity let alone a Mosque. 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by kamat01: 5:09pm On Dec 05, 2019 |
It was the former governor project quote author=olaboy33 post=84650449]This governor is silently performing but all we hear is Seyi Makinde after budgeting a good chunk for PR[/quote] 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by christejames(m): 5:34pm On Dec 05, 2019 |
Hardeybohwarley: inajin Hausa kada kadan... Yes, light should be stable around Ashaka Cement, I think they also generate electricity there. I stayed in Gombe town around Tunfre, I left there last year. Still miss that amazing city. 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Dollyak(f): 5:34pm On Dec 05, 2019 |
shiwex:Using an Admd of 2kw per house, It should be able to supply c20-30k houses. |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by christejames(m): 5:38pm On Dec 05, 2019 |
isthatso: Thanks for this knowledge Bro |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by christejames(m): 5:39pm On Dec 05, 2019 |
NaijaCelebrity: I lived in Labour Quarters Tumfre, but I left Gombe last year. 1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by christejames(m): 5:40pm On Dec 05, 2019 |
1 Like |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by christejames(m): 5:40pm On Dec 05, 2019 |
Re: Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project by Hardeybohwarley(m): 5:45pm On Dec 05, 2019 |
christejames: Toh. Yayi kyau. Light is stable for those under Ashaka Cement supply coverage but the rest of the community are not enjoying stable light. And on a scale of 1-10 I won't rate Gombe light more than 5. 1 Like |
Electoral Act: Ortom Commends President Buhari, Says Decision Best For Country / Akeredolu Distributes 18 Pick Up Vehicles To LGA Chairmen, 3 To Amotekun (pics) / Jonathan And John Mahama At Achebe's Burial (Pictures)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 45 |