Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,205,830 members, 7,993,880 topics. Date: Monday, 04 November 2024 at 08:49 PM |
Nairaland Forum / Nairaland / General / Education / OAU Will Exit National Grid By December 31 — VC (32541 Views)
Delta Poly Students Celebrate Exit Of Rector By Sweeping Main Gate (Pictures) / WAEC: Secondary Schools To Reopen On August 4, 2020 For Exit Classes Only / Federal University Ebonyi Generates Own Power, Independent Of National Grid (2) (3) (4)
(1) (2) (3) (4) (Reply) (Go Down)
Re: OAU Will Exit National Grid By December 31 — VC by ewosk: 10:08pm On Dec 08, 2019 |
Nice one more institutions should do this in no time power generation and supply will leave the exclusive list and power failure will become a thing of the past 3 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by adelaja70(m): 10:08pm On Dec 08, 2019 |
there is only one GREATEST IFE!... 1 Like |
Re: OAU Will Exit National Grid By December 31 — VC by alsudaes1(m): 10:09pm On Dec 08, 2019 |
emeijeh: |
Re: OAU Will Exit National Grid By December 31 — VC by KushLyon(m): 10:15pm On Dec 08, 2019 |
Uniben come and see your mate na to dey owe millions every year for electricity bill dem sabi 3 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by Nobody: 10:18pm On Dec 08, 2019 |
deepwater: |
Re: OAU Will Exit National Grid By December 31 — VC by frowland(m): 10:19pm On Dec 08, 2019 |
[s] deepwater:[/s] 1 Like |
Re: OAU Will Exit National Grid By December 31 — VC by chloride6: 10:19pm On Dec 08, 2019 |
Simplyleo: Infact it is hydro |
Re: OAU Will Exit National Grid By December 31 — VC by Nobody: 10:21pm On Dec 08, 2019 |
eduman365:they are stagnating it because they want to keep on importing generators from china into naija.generator importation business is very lucrative business in naija and most of the power brokers in naija are involved in the business. 3 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by obiekunie2: 10:26pm On Dec 08, 2019 |
deepwater: see your prove sir. divine obuduru - aka "I never expered it" see him in naija looking like dry fish - and the other pix is him in USA looking like a palm tree planted by the river side. 3 Likes
|
Re: OAU Will Exit National Grid By December 31 — VC by carnal: 10:27pm On Dec 08, 2019 |
Simplyleo:its hydro. A friend who is an engineer is part of the project 1 Like |
Re: OAU Will Exit National Grid By December 31 — VC by Simplyleo: 10:28pm On Dec 08, 2019 |
chloride6:Please where is the hydro plant located, cos I can't find any dam on the campus. |
Re: OAU Will Exit National Grid By December 31 — VC by Rolex66: 10:31pm On Dec 08, 2019 |
From inception, Covenant University, in fact CanaanLand, Otta, has been running off-national power grid. So ,nothing new |
Re: OAU Will Exit National Grid By December 31 — VC by MetaPhysical: 10:36pm On Dec 08, 2019 |
I hope they will work on exiting the Federation curriculum as well and go back to being an independent university. |
Re: OAU Will Exit National Grid By December 31 — VC by FemiMaduka(m): 10:40pm On Dec 08, 2019 |
Very commendable. Every serious university with a functional faculty of engineering should create its own power, especially in countries where the power supply from the public mains is epileptic. 3 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by Nobody: 10:45pm On Dec 08, 2019 |
lefulefu: That generator conspiracy theory is trash bro. We just aren't generating enough energy to power a 200million populace... 3 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by Godhatesodomy: 10:45pm On Dec 08, 2019 |
Wow |
Re: OAU Will Exit National Grid By December 31 — VC by Simplyleo: 10:49pm On Dec 08, 2019 |
FemiMaduka:It doesn't work that way. Having functional engineering faculty is one thing and handling projects is another. That a school has a functional engineering faculty doesn't translate into being able to carry out projects. Projects like this are contracted to firms with dedicated facilities for handling them. The facilities in institutions of learning are for demonstration purposes, besides, the lecturers and students without field experience can't handle those projects. That is the practice all over the world. 4 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by Nobody: 10:51pm On Dec 08, 2019 |
eduman365:Nigeria is among the highest importer of generators worldwide.Most of the big men and men in political office in nigeria are involved in the importation of generators. the govt can power 200 million populace but they dont want to do it because if they do it who will then be buying the generators they are importing.ppl say why we dont have stable electricity is because of our population but then why is it that countries that have twice our population have stable power supply.they in power know what they are doing.the less stable eletricity that nigeria has the more underdeveloped it becomes. |
Re: OAU Will Exit National Grid By December 31 — VC by lollybizzu(m): 10:51pm On Dec 08, 2019 |
Jeezuzpick: Obviously, you don't know great Ife! When aluta happens in GREAT IFE, even the smallest flower you don't dare cut talk less of breaking or destroying something. For learning and culture. 2 Likes 2 Shares |
Re: OAU Will Exit National Grid By December 31 — VC by BravoDe: 10:56pm On Dec 08, 2019 |
Simplyleo:Lol, Oau even has dam as bus stop Just enter a shuttle going to campus and tell the driver u wanna drop at dam, it's a bus stop that leads to the dam 3 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by deji68: 11:37pm On Dec 08, 2019 |
If my memory is correct , there is a dam near the VCs residence.... Simplyleo: 1 Like |
Re: OAU Will Exit National Grid By December 31 — VC by nauto: 11:49pm On Dec 08, 2019 |
Obafemi Awolowo University Project still available |
Re: OAU Will Exit National Grid By December 31 — VC by edoairways: 11:51pm On Dec 08, 2019 |
deepwater: |
Re: OAU Will Exit National Grid By December 31 — VC by johnjay4u2u(m): 12:04am On Dec 09, 2019 |
dont8: National grid phrase is the problem. only learning institutions have authority to generate and keep power without remitting to national grid. Universities can even supply surrounding neighborhood and get paid. 1 Like |
Re: OAU Will Exit National Grid By December 31 — VC by ofwest47(m): 12:04am On Dec 09, 2019 |
A well focused V C 1 Like |
Re: OAU Will Exit National Grid By December 31 — VC by baby124: 12:14am On Dec 09, 2019 |
At least this shows the lecturers and students in the engineering department did not buy or sleep with lecturer for their degrees. Those kinds of universities and departments only breed mediocres. Unilag has been exposed to be highly mediocre judging by the gang of lecturers and students in the cold room. 2 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by RexTramadol1: 12:15am On Dec 09, 2019 |
Simplyleo: Lol, OAU as a campus is served water through the campus dam If you're conversant with threads on NL years back There was a thread on indigenes of ife poisoning the dam 2 Likes |
Re: OAU Will Exit National Grid By December 31 — VC by Commentor: 12:31am On Dec 09, 2019 |
deepwater: Oh hush. 1 Like |
Monifa Phillip, Black Woman Graduate From University Of Glasgow, PhD In Physics / Government Day Secondary School Kaya, Zamfara In Pictures / What Is The Difference Between School, Faculty And College?
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 47 |