Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,540 members, 7,999,361 topics. Date: Monday, 11 November 2024 at 05:56 AM |
Nairaland Forum / Nairaland / General / Properties / Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice (51408 Views)
My Room Transformation Progress With Cost Breakdown(Photos) / 4 Bedroom, 4.5 Baths Construction With Cost Breakdown / For Sale: Newly Built 20 Rooms Self-contain Hostel, With Borehole For N25M (2) (3) (4)
(1) (2) (3) ... (7) (8) (9) (10) (Reply) (Go Down)
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by AyeMaDaFunMi: 11:52am On Sep 26, 2019 |
saydfact: Thank you for your reply! |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 11:54am On Sep 26, 2019 |
AyeMaDaFunMi: uwc sir |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by AyeMaDaFunMi: 5:10pm On Sep 26, 2019 |
is it less expensive to go with a tiled roof or use concrete slab? I like the look of flat roofs, but I think it’s less expensive to use a tiled roof. Is it possible to use a tiled roof on a slighted sloped void? I think this will give the look of a flat roof but will use tiled. Easier to maintain and longer lasting. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 8:57am On Sep 27, 2019 |
AyeMaDaFunMi: Concrete roofs are more expensive and have a higher maintenance need/cost... if the slope isn't high enough, tiled roof isnt advisable - stick with long span. thanks |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Muyi002(m): 3:34pm On Nov 24, 2019 |
I greet you guys. Please some one should assist with the [b]names [/b]and [b]sizes [/b]of wood in the attached
|
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 3:34pm On Nov 25, 2019 |
Muyi002: A. Tie beam 75mm x 100mm (3by4) B. Kingpost 50mm x 150mm (2by6) C. Strut 50mm x 100mm (2by4) D. Queen post or struct 50mm x 100mm (2by4) E. Ridge 50mm by 150mm (2by6) F. Rafter 50mm by 100mm (2by4) G. Purlin 50mm x 75mm (2by3) H. Wall plate 75mm by 100mm (3by4) Then there is Ceiling Hangers - 50mm by 50mm (2by2) Not shown in the pics |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by ebpius1(m): 9:01am On Dec 18, 2019 |
@saydfact please can i have your phone number i need to ask you somethings. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 9:26am On Dec 18, 2019 |
ebpius1: Use link in my signature to WhatsApp. If you don't have WhatsApp what's ur email add |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 6:22pm On Jan 01, 2020 |
HAPPY NEW YEAR 2020 TO EVERYONE HERE. THIS YEAR WOULD BE GREATER THAN THE PREVIOUS. AMEN...... #GRATEFUL |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Lefty500: 3:33pm On Apr 16, 2020 |
saydfact: I want to say a very big thank you to you. I went through the whole thread and it's educative. My question is about the precast lintel. 1. What's the details of the reinforcements in it? 2. I read where you replied someone that the thickness of the lintel is 100mm, but the wall it'd bridge is 225mm, is it the plastering that will make up for the rest the lintel thickness? Thanks. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 6:53am On Apr 17, 2020 |
Lefty500: Morning and thanks for following my threads. No1. Thickness of Reinforcement is 12mm or 16mm (if you have offcuts on site) No2. Thickness is 100mm but width is 150mm or 225mm depending on the width of the block used. You're mistaken width for thickness... Regards |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Lefty500: 10:08am On Apr 17, 2020 |
saydfact: Okay I get your point now, your thickness means height, so may I ask why you used height of 100mm, because if you do insitu lintel, you give it the height of the of the hollow block that will chain with it? |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 4:05pm On Apr 18, 2020 |
Lefty500: Thanks.. That's an intelligent question. The resin why 100mm is used is because if 225 is used, it becomes to heavy to lift up and could be risky to workers who try to. In the case of insitu 225mm is used to prevent breaking blocks to meet up like we do in Precast. It means 100mm is sufficient even in insitu but easier to do 225mm and avoid breaking blocks to meet up. Thanks sir 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Lefty500: 8:33pm On Apr 18, 2020 |
saydfact: Thank you sir. I understand 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by AyeMaDaFunMi: 6:13pm On May 16, 2020 |
saydfact: I stumbled upon this YouTube video while looking for something else. Their use of lintels is consistent with your application. Also, the blocks in the corners perfectly describe what I asked in a previous question. No column post, but blocks interlocking at the corners. youtu.be/GPkqId3D8pU
|
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 6:48pm On May 16, 2020 |
AyeMaDaFunMi: Thanks Sir, it still amazes me when some Engr. advice client to TIE A LINTEL all round the structure..... its a waste of fund... Appreciate your review.. 1 Like 1 Share |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by mp3freaks(m): 10:30pm On Jan 28, 2021 |
@saydfact please how many blocks and cement did used for the 6 self contains |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 8:10am On Jan 29, 2021 |
mp3freaks: Hi, I didnt take records of the cement and blocks - sorry |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by dapotemi: 6:45pm On Mar 05, 2021 |
Following |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by dapotemi: 7:03pm On Mar 05, 2021 |
following 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 2:27pm On May 17, 2021 |
saydfact: Hi oduncojamaica I saw your question about lintels, try this method and safe cost, you can read more of my thread for such advice. Goodluck |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by oduncojamaica(m): 8:30pm On May 17, 2021 |
saydfact:Yes Oga mi, I always run to this topic whenever I have issue, Thanks for your teaching. I am also building the same hostel in Ijebu, when I contacted you and you referred me to this topic which has been an eye opener for me. Thanks for your help 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 7:10am On May 18, 2021 |
oduncojamaica: Great to know - Thanks for the kind words... Don't reduce cost by using lesser materials eg 10mm instead of 12mm, 4 bags of cement instead of 6 bags ETC ETC. Rather, find acceptable ways to cut down on labour cost. GOODLUCK |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Hushee(m): 2:25pm On Jun 15, 2021 |
oduncojamaica: Hi, is there a way I can reach you? I have some questions to ask you concerning this... planning on something similar in Ijebu. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by oduncojamaica(m): 10:43pm On Jun 15, 2021 |
[quote author=Hushee post=102751284] Hi, is there a way I can reach you? I have some questions to ask you concerning this... planning on something similar in Ijebu. oduncojamaica@yahoo.com |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by oduncojamaica(m): 4:47am On Jun 16, 2021 |
Hushee: oduncojamaica@yahoo.com |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Hushee(m): 7:52pm On Jul 01, 2021 |
oduncojamaica:Thanks bro, I'll get in touch soon. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by oduncojamaica(m): 9:51pm On Jan 07, 2022 |
saydfact:Sir do you still remember the total square meters (m²) of this roofing and the length of the Kingspost. Thanks in anticipation. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 9:33am On Jan 08, 2022 |
oduncojamaica: I'll check my backup and revert... I'm not 100% sure but I'll check. Regards |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by okeyfermod(m): 9:47am On Apr 14, 2022 |
Hi @saydfact what is the dimension of this septic tank/soak away? author=saydfact post=61687302]Isn't this a beauty? There's nothing better than doing your German floor - now, we're out of the ground and ready to build.. we left the bore-hole pipe still long, to be cut down later.... [/quote] |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 8:43pm On Apr 30, 2022 |
okeyfermod: Hi.. Sorry, I'm a bit late. Hope you've sorted it out.. If not, sizes of septic tank depends on the space left on your land and the projected usage. Thanks |
(1) (2) (3) ... (7) (8) (9) (10) (Reply)
Sandra Duru's Landlord Throws Out Her Properties From Lagos Home (Photos) / Edo Landlord Burns Down His House Over Tenants’ Refusal To Pay Rent (Video) / The Port Harcourt Luxury Flats
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 48 |