Construction Of A Low-cost Four Flat by Dubemcapital1(m): 8:42pm On Jan 05, 2020
Construction of a low-cost four flats of One and Two bedroom apartment


Condition of the work: The owner specifically stressed on achieving this with a rigid budget, we believe to achieve this with few adjustments but there is an existing old structure which cannot be part of the new structure because of the assessment carry out on the old building.

However, the management of the estate could not have us demolish it before raising the the new one, we intend demolishing the old structure as we erect the new one strategically.



Size of plot ---- 80 by 40
Type of house ---- Block of flat
Location --- Enugu State
Schedule ---- Carcass construction
Completion time ---- 7 weeks


Join us again ...


A Preview of our previous work
@ dubemcapital


https://www.nairaland.com/3243543/making-2storey-building-12-flats

https://www.nairaland.com/4025643/building-existing-structure-storey-one

https://www.nairaland.com/3104124/building-6-bedroom-executive-duplex

https://www.nairaland.com/2635697/building-6bedroom-duplex-half-plotI

https://www.nairaland.com/3758639/lets-build-unique-3-bedroom

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 8:43pm On Jan 06, 2020
Clearing, Excavation and demolition


We intend to demolish some part of the old structure for more space.

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 10:07pm On Jan 06, 2020
...more pictures

Re: Construction Of A Low-cost Four Flat by sgtponzihater1(m): 1:16am On Jan 07, 2020
What's the proposed budget?
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 4:08am On Jan 07, 2020
sgtponzihater1:
What's the proposed budget?


All is about #6.8m (with some adjustment)
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 4:33am On Jan 07, 2020
More work

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 7:37pm On Jan 07, 2020
It was meant to be a remodeling but on a second thought and with the owners consent we are building a new structure entirely..

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 8:11pm On Jan 07, 2020
The nature of the soil here (very stony) means there will be no need for DPM though due to the cost adjustments it wasn't in the schedule.

However, casting all the way...

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:55pm On Jan 07, 2020
Rounded off part of the foundation:

Used materials:

6" hole block. -515 blocks
Cement. ------ 54 bags
Sand. ------ 2trips
Local gravel. - 2trips
Local stone. -- 1trip of ½"stone
Water. -------- 2570 liters
Rod. ------ 32 lgt of 12mm, 14 lgt 6mm
Wood. ---------- 20 PCs of plank
Line. ------ 5 pcs
Peg. ------- 2bundles
Nail. ------ 2" and 3 " 5 p/w each
Purlins. ------ 30pcs

Labour
Prof. Fees

1 Like

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 10:34am On Jan 08, 2020
Block work, first stage..

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:27pm On Jan 08, 2020
Block Work escalating

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 11:11am On Jan 09, 2020
Rounding off block work on the sectioned structure.

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:04pm On Jan 10, 2020
Lintels and more

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:18pm On Jan 10, 2020
3bar fitting: cost control measures.

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 7:47pm On Jan 13, 2020
Block level

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 11:13am On Jan 14, 2020
Suspended slab... But will list materials used before further details

Re: Construction Of A Low-cost Four Flat by jman77(m): 8:09pm On Jan 21, 2020
How's the the work talking shape?
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 8:39am On Jan 22, 2020
Dubemcapital1:
Suspended slab... But will list materials used before further details


Cement: 22bags
Rod : 14 pcs of 10mm
Rod: 30 pcs of 12mm
Local aggregate: 1trip
Sharp Sand: 1trip
Blocks: 1,212
Planks: 80planks
½plank: 30 pcs
Purline: 15 pcs
Nail : about 20p/w 3"
Water 1000 litters

Man power:
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 8:40am On Jan 22, 2020
jman77:
How's the the work talking shape?


Going good.


Will update details soon
Re: Construction Of A Low-cost Four Flat by EDWNigLtd: 9:01am On Jan 22, 2020
It would've been a huge stress working in a tight space with the old structure still standing there.

Would the old Structure be completely removed or incorporated into the new building?

I like your pace and precisely neat work, weldone

We're learning.

1 Like

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:23pm On Jan 22, 2020
EDWNigLtd:
It would've been a huge stress working in a tight space with the old structure still standing there.

Would the old Structure be completely removed or incorporated into the new building?

I like your pace and precisely neat work, weldone

We're learning.


Thank you.

The housing cooperation in charge of the estate refused our intended plans of total demolition insisting on renovation not building a fresh house with a different house pattern in the estate so we decided to tread with caution.

We plan to build to roofing stage then we demolish the old structure that is already in the centre as advised by one of the housing officials.

So we won't incorporate it.

Thanks

1 Like

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:49pm On Jan 22, 2020
As a low cost project we used the economy specification:

1. Rod:

12mm ( for column and base)
10mm ( for lintels ) 3bars
6mm ( for column and lintel ring)

2. Coarse aggregate:

½ inch local stone
Gravel

3. Fine aggregate:

Sharp water sand

4. Binder :

supaset cement


5. Wood:

Irregular plank and Purline.
12ft bamboo.

6. Cast Mixture ratio:

A concrete mix ratio of 1 : 5 : 6 which falls below concrete grade C-10



Thanks
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 2:14pm On Jan 22, 2020
So we progress to suspended slab preparation

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 5:17am On Jan 23, 2020
Casting the beams first...

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:54am On Jan 25, 2020
Slab concrete cast completed

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:43am On Jan 29, 2020
Block Formation 2

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 2:15pm On Jan 30, 2020
Moving on with block work

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 2:22pm On Jan 30, 2020
Lintels

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 8:53pm On Feb 06, 2020
Moving on to the roof beam

Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 8:57pm On Feb 06, 2020
Time to remove the old structure...

(1) (2) (3) (Reply)

Why Isheri North Is On A High Demand! / Ibeju Lekki Is Getting More Interesting. / Barb Wire Fence

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 24
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.