Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,591 members, 7,999,552 topics. Date: Monday, 11 November 2024 at 09:47 AM |
Nairaland Forum / Nairaland / General / Properties / The Finishing Of Osun State Edifice By Rotech77 (22350 Views)
Casa Ava: The Finishing / Handlings Of Anambra Edifice By Rotech77 / Construction Of Mini Bakery/ Office Space By Rotech77 (2) (3) (4)
(1) (2) (3) ... (6) (7) (8) (9) (10) (11) (12) (Reply) (Go Down)
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 7:53am On Dec 28, 2019 |
Stamped shining concrete flooring for the remaining part of the external floor in progress (Sample pics) with landscaping.
|
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 9:11am On Dec 30, 2019 |
Stamped floor work in progress. Kitchen and outside lobby “drop light”pics.
|
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 5:26pm On Dec 30, 2019 |
Work in progress
|
Re: The Finishing Of Osun State Edifice By Rotech77 by sako28: 9:01pm On Dec 30, 2019 |
[quote author=rotecch77 post=85353116]Work in progress [/quote Very nice work. Sir, the concrete stamp how much is the square meter going for. |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 11:10am On Dec 31, 2019 |
[quote author=sako28 post=85359191][/quote] Thanks, the floor cost btw 5500-6500 (based on location)per meter square with materials I.e sand, granite, cement, polish and many more. |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 3:23pm On Dec 31, 2019 |
More coming |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 10:54am On Jan 01, 2020 |
Happy new year to all our clients and viewers. May Good things locate each and everyone of us in this year 2020. Amen 2 Likes |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:40am On Jan 02, 2020 |
Welcome to year 2020 and watch out for more fabulous design/construction from ”Rotech building concept” |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 10:30am On Jan 07, 2020 |
Final laps on this project on the way |
Re: The Finishing Of Osun State Edifice By Rotech77 by Yababoy(m): 6:14pm On Jan 07, 2020 |
Hello, I love your piece and I'm also about to start a project in Osun State where i'm from. Can we talk on whatsapp please 08098602104. rotecch77: |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:43pm On Jan 07, 2020 |
Yababoy: Thanks for your time here bro Yes we can talk, I will reach out to you soon |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:13pm On Jan 08, 2020 |
Our charges are moderate |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:24am On Jan 11, 2020 |
Watch out for more |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 6:25pm On Jan 15, 2020 |
American polished floor done.
|
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:05am On Jan 16, 2020 |
08066619493. |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:23am On Jan 26, 2020 |
Our charges are moderate couple with superb finishings |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 3:39pm On Jan 29, 2020 |
More pics
|
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:02pm On Jan 30, 2020 |
More
|
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 11:33pm On Jan 30, 2020 |
More pics
|
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 11:50am On Jan 31, 2020 |
08066619493 |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 9:42pm On Feb 06, 2020 |
You don’t needs to break bank,before we can get you something as this or more than this |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 1:39pm On Feb 12, 2020 |
We are here for you People |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 7:48am On Feb 13, 2020 |
More coming soon |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 11:58am On Feb 21, 2020 |
Happy wkd to you all |
Re: The Finishing Of Osun State Edifice By Rotech77 by obynocute(m): 2:30pm On Feb 21, 2020 |
Nice work boss, please chief I saw one of the doors the frame didn't reach the lintel, how did you cover it up. |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 2:56pm On Feb 21, 2020 |
obynocute: Thanks sir, the space doesn’t designed to have door at initial stage, it was later the client demands for door there, so we now design door with FAN LIGHT for the space
|
Re: The Finishing Of Osun State Edifice By Rotech77 by obynocute(m): 6:31am On Feb 22, 2020 |
rotecch77:Alright, thank you sir. |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 7:45pm On Feb 22, 2020 |
Make your enquires today and see the diff. |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 10:30am On Mar 05, 2020 |
We are here to deliver excellent job for you at friendly cost. |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 8:03am On Mar 07, 2020 |
Happy wkd to you all |
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 9:46pm On Mar 10, 2020 |
The Current state of the-flower planted few weeks ago
|
Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(m): 9:14am On Mar 13, 2020 |
Thanks you all for your time here
|
(1) (2) (3) ... (6) (7) (8) (9) (10) (11) (12) (Reply)
How To Build A House In Nigeria / "As A Guy You Should Already Own A House At 21" - Slay Queen / 2 Children Die In House Fire In Akwa-Ibom (Graphic Pix)
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 14 |