Nairaland Forum / Nairaland / General / Properties / Construction Of A Low-cost Four Flat (5702 Views)
For Sale: Block Of Four Flat Location: Sawmill Gbagada Price: N65M Documents: R / Four Flat Forsale Located Beside Rose Wale Filling Station, Iwo-road, Ibadan / How Much Will It Cost To Plaster A Four Flat Building (2) (3) (4)
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:10pm On Feb 06, 2020 |
Demolition of the old structure...
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 4:14pm On Feb 09, 2020 |
More pics
|
Re: Construction Of A Low-cost Four Flat by val15: 4:49pm On Feb 09, 2020 |
Following |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:39pm On Feb 13, 2020 |
val15: Welcome |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 10:03pm On Feb 13, 2020 |
The workers that is demolishing the house has turned the debris disposal into a serious business, if you give them some tip they will use the debris to fill your gate area no matter where your house is located in the street I tire o and is seriously affecting our speed. However, the slab of the old house is down, OSC is the only challenge... Please Note: The demolition time is not included in the construction execution duration. 1 Like
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:24pm On Feb 17, 2020 |
It really took time to get this structure down...
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 3:22am On Feb 26, 2020 |
The old building has been completely demolished and the debris moved outside. It actually took 20days to completely demolish and dispose the debris. We must continue...
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 3:30am On Feb 26, 2020 |
Done with the excavation and columns
|
Re: Construction Of A Low-cost Four Flat by stnkembu(m): 5:35am On Feb 26, 2020 |
Keep moving.... I'm following! |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 10:36am On Mar 07, 2020 |
More pics on the last foundation of the house
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:04pm On Mar 07, 2020 |
Formations gone far already Joining the apartments
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:12pm On Mar 07, 2020 |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 6:24am On Mar 11, 2020 |
Moving up to the suspended slab We have: 22new 1*12*12 planks 25new 2*2*12 purline 12 new 1*6*12 planks ½ bag of 3" nail and 2" respectively With some old wood and bamboos in the site
|
Re: Construction Of A Low-cost Four Flat by erico2k2(m): 9:37am On Mar 11, 2020 |
Dubemcapital1:Following still! |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:42am On Mar 11, 2020 |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:42am On Mar 11, 2020 |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 4:13pm On Mar 17, 2020 |
Slab and step done with and having joined the apartments we shall proceed to the roof beam.
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 4:34pm On Mar 17, 2020 |
Casting
|
Re: Construction Of A Low-cost Four Flat by ricki: 4:36pm On Mar 22, 2020 |
if by any chance you could make sure the iron end up in the center of the concrete will be great cause of strength. 1 Like |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 6:13pm On Mar 23, 2020 |
ricki: That's right, thanks for that observation. It was lifted during electrical piping. |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 7:48pm On Mar 23, 2020 |
Rounding off the block work, lintel and more
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 7:57pm On Mar 23, 2020 |
More on same
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:20pm On Mar 27, 2020 |
Roof beam...
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 10:32pm On Apr 06, 2020 |
This c-19 general break is not helping matters at all Done with parapet. Really curious about lockdown
|
Re: Construction Of A Low-cost Four Flat by UncleRovas(m): 9:03am On Jun 14, 2020 |
Very interesting process. Any update on this project? |
Re: Construction Of A Low-cost Four Flat by topsy23: 11:01am On Jun 14, 2020 |
For Your Electrical, Mechanical and HVAC design and installations, You can visit our thread: https://www.nairaland.com/1804476/complete-package-design-drawing-electrical https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/9 For original Cables https://www.nairaland.com/2326721/nigerchin-kabelmetal-coleman-cables/14 Phone number 08033643191, 08051750560 whatsapp number : 08033643191 E-mail: atope23@live.co.uk, topselg.engineering@gmail.com |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 12:59am On Jun 20, 2020 |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 1:15am On Jun 20, 2020 |
Electrical pipping..
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:06pm On Jul 08, 2020 |
Roofing concluded
|
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 9:17pm On Jul 08, 2020 |
Roof completion
|
Re: Construction Of A Low-cost Four Flat by ricki: 3:07pm On Jul 12, 2020 |
i like this roof can you take better picture? ?? ?? |
Re: Construction Of A Low-cost Four Flat by Dubemcapital1(m): 5:12pm On Jul 12, 2020 |
ricki: let me visit the site and source make more pics |
Cost Of Sliding Windows, Plastering, German Floor Etc / Why Isheri North Is On A High Demand! / Ibeju Lekki Is Getting More Interesting.
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 23 |