Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,515 members, 7,999,303 topics. Date: Monday, 11 November 2024 at 12:15 AM |
Nairaland Forum / Nairaland / General / Properties / Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch (33573 Views)
Construction Of 3bdrs Cottage structure By Rotecch. / HOUSE! 4nos Of 3bedroom Flat With 2mini Flat@ Gbagada Ifako, 70m,CofO , / 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE (2) (3) (4)
(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (20) (Reply) (Go Down)
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by mufutau55(m): 3:32pm On Apr 27, 2020 |
rotecch77: Not bad for that price. Fund well managed. Hajji M. |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 7:43pm On Apr 27, 2020 |
mufutau55: Yes it’s o BABS Hajji |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 12:37pm On Apr 28, 2020 |
08066619493 call and whatzap |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 11:44am On Apr 29, 2020 |
Day 4 after casting of the slab ... still counting. Curing of the slab is also place too. |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 5:10pm On Apr 30, 2020 |
Still counting...about 60-65pec curing stage in . day5 |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 6:51am On May 03, 2020 |
Day 8, still counting ...... about 65-70 pec strength
|
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 6:36pm On May 05, 2020 |
Watch out |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 10:00am On May 06, 2020 |
Still counting |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 3:05pm On May 07, 2020 |
More coming |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by keemzy1(m): 6:14pm On May 07, 2020 |
We wait patiently... Welldone bro |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by keemzy1(m): 6:15pm On May 07, 2020 |
Awaiting rotecch77: |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 2:02pm On May 08, 2020 |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 10:04am On May 10, 2020 |
We don’t just build, we build to stand the test of time. Day 14..... still counting, no load on the slab yet till 28days (we are not In hurry) Happy wkd to you all |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by keemzy1(m): 12:06pm On May 10, 2020 |
Great!!! rotecch77: |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by keemzy1(m): 12:15pm On May 10, 2020 |
@Rotech, please what is the dimensions of this slab? rotecch77: |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by omanzo02: 12:42pm On May 10, 2020 |
rotecch77:For the decking slab alone you meant or from foundation to this stage? |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 1:01pm On May 10, 2020 |
keemzy1: The size is 15*14.5m Thanks for your time here. |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 1:04pm On May 10, 2020 |
omanzo02: From foundation ? “for where” This is just for the slab only. We build to standard, we don’t compromised 2 Likes |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by omanzo02: 3:01pm On May 11, 2020 |
rotecch77: I get u now! How much per bundle for the electrical conduit pipe you used? Is it Niger pipe or other brand? |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 6:51pm On May 11, 2020 |
omanzo02: The electrical pipe we used is called “dignity” (Original one) a bundle cost 7k The regular type is 2500( we don’t use this type for our slab work.
|
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by omanzo02: 7:04pm On May 11, 2020 |
rotecch77: Really? ₦7000 seem ideal than ₦16000 I got for Niger pipe of 45 pieces per bundle, and I am still wondering what category the Niger pipe belongs to and what does one has to consider when deciding pipes for slab? |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 10:45am On May 13, 2020 |
More coming |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 5:48pm On May 19, 2020 |
Update coming soon |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 7:57am On May 21, 2020 |
Now 32 days after the casting of the slab ( decking) Next will be upper floor block settings
|
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 1:39pm On May 22, 2020 |
Watch out for more update |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 9:21am On May 23, 2020 |
08066619493 |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 7:22am On May 24, 2020 |
Happy eid l fitr to all our esteemed Muslim and the founder of Nairaland ( Mr Seun osewa) Moderators Clients Readers Followers
|
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 8:54pm On May 25, 2020 |
Thank you all for your time here. Our charges and quality of our work speaks for us. |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 9:30am On May 31, 2020 |
Happy wkd to you all
|
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by anininwaobodo: 2:38pm On Jul 27, 2020 |
rotecch77: sir I have seen the solid and waste water piping before casting of the deck, but what about the water supply line...are they done after casting.... sir, explaining with pictures attachment will be of great help... thanks for the knowledge shared so far. |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(m): 9:43pm On Jul 27, 2020 |
anininwaobodo: Supply pipe are usually laid inside block that is why you can’t find it inside the decking. 1 Like |
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by anininwaobodo: 11:28am On Jul 28, 2020 |
rotecch77: OK sir, but while connecting the water supply line from the ground floor to the first floor or vice versa, won't there be cracking of the first floor deck in order to achieve conceal conduit piping? OR will the pipe surfaced at the deck....? thanks for the previous reply sir |
(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (20) (Reply)
Metro View Hotel Collapses In Ebonyi, 60 People Escape Death / How Much Will It Cost Me To Build 3 Bedroom Flat At Ifo In Ogun State. / Different Ways You Could Be Ripped Off In Building
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25 |