Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,206,865 members, 7,997,069 topics. Date: Thursday, 07 November 2024 at 09:33 PM |
Nairaland Forum / Nairaland / General / Travel / FG announces Two-Day Total Shutdown Of Third Mainland Bridge (20625 Views)
Airline Operators Suspend Shutdown Of Operations, Resume Flights / FG Moves To Avert Looming Shutdown Of Airline Operations / FG Announces Five Airports To Be Reopened By June 21 (2) (3) (4)
FG announces Two-Day Total Shutdown Of Third Mainland Bridge by adenigga(m): 7:45am On Oct 08, 2020 |
PUBLIC NOTICE: The first total closure of the section of the bridge between Adekunle and Adeniji Adele will be from midnight of Friday, 9th October, 2020 to midnight of Sunday, 11th October 2020 for the first stage of casting works. No movement or vibrations on the bridge are allowed at this stage hence the closure.https://twitter.com/efiwecreations/status/1314164635071897601?s=21 The Federal Government has announced its plan to completely close a section of the Third Mainland Bridge for repairs within two days. https://t.guardian.ng/news/fg-announces-two-day-total-shutdown-of-third-mainland-bridge/ 1 Like 1 Share
|
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by akinmusi(m): 7:55am On Oct 08, 2020 |
There is an expression that Nigeria is a timed bomb waiting to explode. I don't pray so. Meanwhile, I will design, print and brand for you with 3D logo graphics and hyper realistic concepts. Kindly check my signature below with the link and my work archives. friday2011: ILoveDemMANNA: Ask the op. That was not what he posted. It was about the new inland port in South East. Why y'all coming at me. Op changed the topic. Kindly verify. 5 Likes |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by ignis: 12:28pm On Oct 08, 2020 |
Just 2 days? Why not upto a week? |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by hakeem4(m): 12:29pm On Oct 08, 2020 |
akinmusi:How is the maintenance of a bridge an indication that nigeria is a bad country? 49 Likes |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by tobtap: 12:29pm On Oct 08, 2020 |
make dem fix am well oo.. it is well |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by RenaissanceGuy: 12:30pm On Oct 08, 2020 |
Hh |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by TechyMm0: 12:30pm On Oct 08, 2020 |
Good |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Nobody: 12:30pm On Oct 08, 2020 |
Baba is working 247.. Nigeria will get there... God bless us all.. 1 Like 1 Share |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by RenaissanceGuy: 12:30pm On Oct 08, 2020 |
This is why our federalism is total balderdash. FG has no power to do that. This should be coming from the state govt, even if it is the FG that's paying for the repairs. 1 Like 1 Share |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Checked86: 12:30pm On Oct 08, 2020 |
akinmusi: |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Queenlovely(f): 12:31pm On Oct 08, 2020 |
federal government is working abi fashola wants to prolong his legacy. how many times have they repaired onitsha bridge. but the Yoruba should keep smiling to the bank. Lagos must be depopulated, a deep sea port in igbo land will make Lagos a ghetto. igbo land will be the new Mecca, with hausa struggling to learn igbo by force. #i have a dream 9 Likes 1 Share |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by noble71(m): 12:31pm On Oct 08, 2020 |
The traffic will be hell! |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Jirehz(m): 12:31pm On Oct 08, 2020 |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Oluwauchebest(m): 12:31pm On Oct 08, 2020 |
I no even know where this bridge dey self I go try reach Lagos next month 7 Likes 1 Share
|
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by centilad(m): 12:31pm On Oct 08, 2020 |
And the over 3hr traffic every 12 - 9pm gets directed to which locations? 1 Like 1 Share |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Nobody: 12:32pm On Oct 08, 2020 |
U |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by beautyhd: 12:32pm On Oct 08, 2020 |
Ok Living on the mainland and working on the island this period that work is ongoing on thirdmainland bridge is enough suffering. 5 Likes |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Nobody: 12:32pm On Oct 08, 2020 |
Help yourself out Sha fix am well |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Sleekfingers: 12:32pm On Oct 08, 2020 |
Good. But make dem do fast o....the traffic is getting too much oooooo......i have stopped driving to work o....just wasting fuel money...... 2 Likes |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Sabadon(m): 12:33pm On Oct 08, 2020 |
bomboclat |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by ILoveDemMANNA: 12:33pm On Oct 08, 2020 |
It's all good. No pain, No gain. Pot wey wan cook better soup, him yansh go out. I commend the FG for this. 1 Like |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Raskasal(m): 12:33pm On Oct 08, 2020 |
hakeem4: He probably wanted some likes. And I wonder those who'd like such delusional comment. 7 Likes 1 Share |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by ILoveDemMANNA: 12:34pm On Oct 08, 2020 |
akinmusi:All because they are repairing the bridge for the betterment of Nigerians? But why is it that it is only negative, bad, sad news that makes you happy in this life? Is this the way you live your life offline also? Kontinue o, don't stop pls. 4 Likes |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by 0taPiaPia(m): 12:35pm On Oct 08, 2020 |
A good time not to be in Lagos My only problem with this project is that the bridge at contain should have been opened up/ the bridge that connects Alaka to eko bridge should have been opened too before touching the 3mb. This is like closing all your doors and using your windows for exit. It’s mad out there. |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Nobody: 12:37pm On Oct 08, 2020 |
Omo igbos won't see where to hawk gala and coke 1 Like |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Opeyemi95(m): 12:37pm On Oct 08, 2020 |
. Its okay as long as it will help strengthen the structure. I just hope it won't last longer than 3 days I design a website for 9,000 only. Call 0802,860,9484 |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by jericco1(m): 12:39pm On Oct 08, 2020 |
The reparations are becoming funny. They should better be done ASAP before I get back |
Re: FG announces Two-Day Total Shutdown Of Third Mainland Bridge by Lanre4uonly(m): 12:40pm On Oct 08, 2020 |
Ok. It is noted. |
9 Things People Living In Lagos Can Relate To. / Another Airasia Plane Carrying 153 People Overshoots Runway In The Philippines / Nigerians In SOUTH KOREA- What Is The Condition And Hustle Over There.
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 40 |