Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 5:56pm On Nov 11, 2020 |
kopell: This first decking is about 268 sqm. About temporary stairs, its usually done in a site we have difficulty climbing through the main stairs. If we have too many concrete casters and time is of the essence, we use temporary stairs. The cost is not very substantial, the average cost is about N40,000. We save money by making use of the main staircase, but we choose the option that best works for the project. As for chaining the lintels, its actually a requirement in the structural drawing of most storey buildings, the structural drawings usually specify the use of the lintel before the decking. It's better to do the decking once if you can afford to, but the nature of work in our country makes this very difficult. 3 Likes |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 1:06pm On Nov 12, 2020 |
Putting finish touches to the house before the concrete cast of the first parapet and the penthouse decking...... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 1:11pm On Nov 12, 2020 |
More 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 1:14pm On Nov 12, 2020 |
Completing the staircase to the penthouse....... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 1:54pm On Nov 12, 2020 |
At the top......... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 3:43pm On Nov 12, 2020 |
Working on the decking frames....... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 6:40pm On Nov 12, 2020 |
More pictures of the work today........ 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 7:05pm On Nov 12, 2020 |
The mat..... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 2:03pm On Nov 13, 2020 |
More from this site......... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by omanzo02: 4:38pm On Nov 15, 2020 |
spyder880: Spyder, Is it safe to keep or stock the blocks on the deck for about 4 weeks or more before setting without any load imbalance effect on the structure? |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 6:25pm On Nov 15, 2020 |
omanzo02: As long as your bamboo supports are still under the slab, there is little risk. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by omanzo02: 6:51pm On Nov 15, 2020 |
spyder880:What are the likely risk on the structure if the bamboo are already removed and the slab have long cured? |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 7:31pm On Nov 15, 2020 |
omanzo02: None, if the slab is cured and the supports removed, it should bear the weight of blocks. 3 Likes |
Re: The Making Of The "White Penthouse" In Anambra by bixton(m): 2:12pm On Nov 16, 2020 |
omanzo02: Avoid stacking all the blocks on only a section. 3 Likes |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 10:48pm On Nov 16, 2020 |
bixton: Very correct. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by omanzo02: 11:04pm On Nov 16, 2020 |
bixton:Definitely, the loads must be evenly distributed over the areas of the slabs to avoid overloading a section. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 11:07pm On Nov 16, 2020 |
Meanwhile, work is still going on here today and tomorrow. We are doing the electrical and plumbing piping for this penthouse deck. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by UwaMmebii(m): 3:14am On Dec 13, 2020 |
Please I would like to know the total cost to build this house from start to finish level. |
Re: The Making Of The "White Penthouse" In Anambra by UwaMmebii(m): 4:13am On Dec 13, 2020 |
spyder880: Oga Spider I'm waiting to hear from you about the total estimate to build this house thanks. |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 5:29am On Dec 13, 2020 |
UwaMmebii: If this house is being built at today's building materials costs, about N28m will complete the carcass of this building, while about N25m might complete the finish of the building. Thanks. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 5:30am On Dec 13, 2020 |
We plan to restart work here in this site by early next week. More pictures when we start.. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by UwaMmebii(m): 5:36am On Dec 13, 2020 |
spyder880: Ok Thanks bro. |
Re: The Making Of The "White Penthouse" In Anambra by alexsandro(m): 6:05pm On Dec 13, 2020 |
What kind of staircase are better to choose? |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 7:25pm On Dec 13, 2020 |
alexsandro: Any type you like. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by alexsandro(m): 11:11pm On Dec 13, 2020 |
spyder880:I am thinking about marble anyway. It seems to be the best option Marble stairs are amazing additional to marble wall at the second floor. I will share some photos after we finish |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 6:35am On Dec 14, 2020 |
alexsandro: Yes some people use tiles, others use marble finish, it will depend on what the client chooses after seeing the options and considering the cost. 2 Likes |
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 6:57pm On Dec 15, 2020 |
We are back in this site, to complete the decking cast after the cement increase........ 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 7:03pm On Dec 15, 2020 |
More pictures 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 5:38am On Dec 18, 2020 |
Concrete cast still in progress.......... 1 Like
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 5:56am On Dec 18, 2020 |
Staircase area....... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 6:08am On Dec 18, 2020 |
Some of the completed parapet works....... 2 Likes
|
Re: The Making Of The "White Penthouse" In Anambra by spyder880(m): 12:18pm On Dec 18, 2020 |
More 2 Likes
|
(1) (2) (3) ... (8) (9) (10) (11) (12) (13) (14) ... (16) (Reply)
Enugu Residents Kick As Church Built On Waterway Threatens Their Property / From Paper To Brick: A Journal Of Construction Activities / Collapsed Building In Lagos: List Of Survivors
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36 |