Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,281 members, 7,998,443 topics. Date: Saturday, 09 November 2024 at 03:39 PM |
Nairaland Forum / Nairaland / General / Properties / Can I Build This Type Of House In Three Months? (107957 Views)
How Much Will It Cost To Build This Structure.... / How Do I Deal With This Type Of Neighbor / What Kind Of House Can I Build With 3m (2) (3) (4)
(1) (2) (3) ... (9) (10) (11) (12) (13) (14) (Reply) (Go Down)
Re: Can I Build This Type Of House In Three Months? by olukaygold(m): 1:46am On Jan 21, 2021 |
Jfkitchen123:Depends on your location sir...you can call or chat me up for further details |
Re: Can I Build This Type Of House In Three Months? by adonnii(f): 2:01am On Jan 21, 2021 |
. |
Re: Can I Build This Type Of House In Three Months? by adonnii(f): 2:03am On Jan 21, 2021 |
f you really have money you could deliver the build in less than a month. There's an equipment i red that dries concrete work as soon as they're set. |
Re: Can I Build This Type Of House In Three Months? by Everest9(m): 2:05am On Jan 21, 2021 |
Bro if the money is not a problem, the house can even be finished in 2 months. I have built a 5 rooms duplex in less than 4 months for someone and if you don't mind I can help you get it done without wasting your money unnecessarily for a token. LoyalHustler1: |
Re: Can I Build This Type Of House In Three Months? by Holluwatarhyor(m): 3:24am On Jan 21, 2021 |
Hello everyone,I'm a civil engineer with years of experience in building construction, I'm available if you are in need of an assistance in your site. 08062150515 |
Re: Can I Build This Type Of House In Three Months? by weyreypey: 3:31am On Jan 21, 2021 |
freshvine: Hmmmm |
Re: Can I Build This Type Of House In Three Months? by weyreypey: 3:34am On Jan 21, 2021 |
raymondFirstborn:You're a dangerous person. |
Re: Can I Build This Type Of House In Three Months? by Jennifer89(f): 3:43am On Jan 21, 2021 |
LoyalHustler1: omo onile is everywhere in Warri you must pay deve to the community before you build if not you no go build community bioz no go let you lift shovel 1 Like |
Re: Can I Build This Type Of House In Three Months? by Hangulsaram: 4:17am On Jan 21, 2021 |
Jessepaid:Nigerian poor masses are the problem of themselves, yet we blame government. The little job that should be reserved for our people is what you are advising him to give to Togolese and Cameroonians when we have our own brothers and Sisters that can do it. I hope ur own job is transferred to the same people too. @ LoyalHustler1 I am sure you have some people you knew or relative that can do the Job,all you need is to negotiate with them and tell them what you want. Before you say that our people charge too much, consider the cost of living here in Nigeria and in those countries. 1 Like |
Re: Can I Build This Type Of House In Three Months? by Sirbifest(m): 4:33am On Jan 21, 2021 |
Ugandatales: |
Re: Can I Build This Type Of House In Three Months? by fykes(m): 5:10am On Jan 21, 2021 |
peeps4u:Here.
|
Re: Can I Build This Type Of House In Three Months? by Yinkagbo(m): 5:21am On Jan 21, 2021 |
olukaygold: Pls can I have your contact, |
Re: Can I Build This Type Of House In Three Months? by drkay(m): 5:39am On Jan 21, 2021 |
Hangulsaram:God bless you and your hustle. You’re patriotic. That project will keep more than 10 Nigerian artisans busy during its construction and thereby put food on their table. 2 Likes |
Re: Can I Build This Type Of House In Three Months? by Sunnycliff(m): 6:01am On Jan 21, 2021 |
okalo: Is a lie... It will go beyond roofing |
Re: Can I Build This Type Of House In Three Months? by Jessepaid(m): 6:23am On Jan 21, 2021 |
Hangulsaram:... Have you ever seen a major road construction contract given directly to a Nigerian before? It's always these Arab contractors, CCECC, or Cranesburg contractors... And they are arabs or Chinese anyways... Alot of Nigerians are accustomed to bureaucracy.. This makes things slow and threatens to close the window of opportunity that these politicians use to steal money... But with the arabs and chinese, things are blunt and straight forward... The governor secures 80billon for a contract he takes 30billion and tells the white contractors to make do with the remaining 50billion.. The government also refuses to use Nigerian contractors and their logistics... To avoids leaks about how much was really used for the project.. You get the point now? 2 Likes |
Re: Can I Build This Type Of House In Three Months? by STINOS(m): 6:37am On Jan 21, 2021 |
Harbeeorlar:I am not a novice in the building industry. For concrete to attain it's full strength it must be properly cured. Failure to do so is a disaster waiting to happen. Continuing block work on a deck when the concrete is not properly cured is very wrong. |
Re: Can I Build This Type Of House In Three Months? by TANID(m): 7:09am On Jan 21, 2021 |
LoyalHustler1:it's Very Very Possible sir As Long As Money Is On grand To Do It but But You Need very Good Supervisor just Like How My Sister Does To build Her Twins flat In 6weeks. Anyways Sir I'm Here For Your Interior and Exterior |
Re: Can I Build This Type Of House In Three Months? by observer2020(m): 7:21am On Jan 21, 2021 |
Oga, two months is enough for the building.... See analysis.... Clearing of the bushes = 2 days Marking of the foundation = 1 day Digging of the foundation with enough manpower = 1 day Blinding of the foundation and setting of blocks = 2 days.. Laying of blocks to lintel level = 2 days... When all this are going on, the iron man for lintel is on work already and people digging as soak away are always on duty... Boarding of the lintel = 3 days Casting of the lintel with enough manpower = 1 day Raising the blocks to roof level = 2 days. Roofing = 7 days Plumbing (if surface) = 3 days Plastering of the house = 5 days Installation of pop already molded for windows = 3 days. Tiling with enough experience workers = 6 days Installation of windows and doors and the dressing of them = 3 days Painting = 4 days... Concrete floor for the compound = 3 days Jessepaid: 1 Like |
Re: Can I Build This Type Of House In Three Months? by Technology14: 7:22am On Jan 21, 2021 |
Call/whatsapp : 09097430451. Incase you need affordable solar lights to lighting your construction site at night for the safety of your workers. |
Re: Can I Build This Type Of House In Three Months? by observer2020(m): 7:24am On Jan 21, 2021 |
Please tell ur Engineer to make the building 10 blocks from DPC(foundation) and four blocks from the lintel.... My brother, you will like the looks of ur building more than this original one, and your building will still be in fashion 30 years to come. For more information 07037211667 Jessepaid: |
Re: Can I Build This Type Of House In Three Months? by Jessepaid(m): 7:29am On Jan 21, 2021 |
observer2020:all true....but you still need to motivate the workers to work happily for you... I know someone who when he was building his house came regularly and bought food and beer for everyone working at the site that day... He did it at least 3 rimes a week.. Productivity levels went through the roof.. The labourers were never late... And they built the house with their hearts... Oh and yes there was always a fucking frenzy they all went crazy each time he bought them food and beer.. Followed by shouts of "twale" baba ooo! 1 Like |
Re: Can I Build This Type Of House In Three Months? by topsy23: 7:48am On Jan 21, 2021 |
LoyalHustler1: 100% possible if the money is available You can contact us for your ELECTRICAL MECHANICAL AND PLUMBING design and installation |
Re: Can I Build This Type Of House In Three Months? by Architectsly: 7:48am On Jan 21, 2021 |
LoyalHustler1: Its very much possible bro, Meanwhile your building can look more classy and even save cost on roofing if u choose to do flat roofing contemporary designs... You can also decide to change your concept after viewing my various bungalow aesthetically appealing designs. For more; Zero 81 three 67 four 123 eight
|
Re: Can I Build This Type Of House In Three Months? by JIREN01: 7:51am On Jan 21, 2021 |
Sunnycliff:Really? 7M is enough to build that, including the finishing? |
Re: Can I Build This Type Of House In Three Months? by Sunnycliff(m): 8:00am On Jan 21, 2021 |
JIREN01: As long as you don't use metro tiles |
Re: Can I Build This Type Of House In Three Months? by JIREN01: 8:09am On Jan 21, 2021 |
princejones:Please, how much has been spent on this so far? |
Re: Can I Build This Type Of House In Three Months? by Vikalinda(m): 8:27am On Jan 21, 2021 |
LoyalHustler1: Which part of South South, hope not Port Harcourt because Obio Akpor boys sturbon pass them oo |
Re: Can I Build This Type Of House In Three Months? by alasane: 9:30am On Jan 21, 2021 |
ArticleBeast: your are a joker then |
Re: Can I Build This Type Of House In Three Months? by nams77: 9:34am On Jan 21, 2021 |
saintruky:Abeg give me the control if you get am |
Re: Can I Build This Type Of House In Three Months? by ArticleBeast: 9:34am On Jan 21, 2021 |
alasane:K |
(1) (2) (3) ... (9) (10) (11) (12) (13) (14) (Reply)
Professional Screeding /pop And Painting Designs Works(pictures) / Your Building Is Incomplete If It Lacks These ... / Latest Promo Price For Stone Coated Roof Sheets
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 51 |