Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,207,659 members, 7,999,881 topics. Date: Monday, 11 November 2024 at 03:33 PM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1965) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4818681 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (1962) (1963) (1964) (1965) (1966) (1967) (1968) ... (3776) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 1:02pm On Jan 31, 2021
mank1234:


Your work is always neat.

He’s not an electrician but an electrical engineer.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KelvinCoaster(m): 1:15pm On Jan 31, 2021
Joybalaba:
More of our conversations
I suggest you consult a lawyer! That's the best option for now.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Joybalaba: 1:27pm On Jan 31, 2021
kopell:
There is no need to flood the entire page with your personal conversation with her. Call your bank, file a dispute on the transaction. Your bank will deal with her, with BVN and NIN those days are gone when people play this attitude of blocking number after collecting money.
am not in Nigeria & I don't use Nigeria bank thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by kingzsoul: 1:35pm On Jan 31, 2021
neduboo:


Check ur email. I'm replied u

I've replied u too. Please check your mail sir
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by kopell: 1:50pm On Jan 31, 2021
Joybalaba:
am not in Nigeria & I don't use Nigeria bank thanks
Madam you don't have to be in Nigeria to file a transition dispute, if you're in the west that even give you better opportunity to get your money back, as far it is not cash transaction. If she received the money through bank you have a case, you can call the receiving bank once you have the individual information. I hope the lady is reading this as well, if she dose not came out to tell her own part of the story; taking this action will do tremendous damage to her business reputation and banking opportunity.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PAPAFEELERS: 1:52pm On Jan 31, 2021
n3xt:


My way.

In my last project I bought 5mm glass for all the windows and the guy who assembled was like you're getting this quality because you got materials yourself.
Most materials sellers don’t even retail 5mm glass.
Boss,
Please share more info on this bro.
I have gotten the 5mm glass tip and also Eguns comment as well.
If you can just share 2 or 3 lines on items to buy, how to know which one is naija or imported aluminum frames etc this will be very helpful not just to me but other lovers of knowledge.
Thanks

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Enyinne(f): 2:07pm On Jan 31, 2021
Thats very very high .get 3 or more quotations and compare .
PAPAFEELERS:
Ogas in the house please is this a good deal/quotations for casement windows with burglary proof and nets ( 3 in 1 )?

Please help with your experiences in this areas as a property owner or business person. the qoutation was gotten in Abuja.
if its on the high side , please point it out and give me suggeste dfigures i can use to negotiate for a better deal.

S/NO Dimension Quantity Unit Price Total
1 1200 X 1400 8 70,000.00 560,000.00
2 1700 X 1900 1 70,000.00 70,000.00
3 1400 X 1400 6 70,000.00 420,000.00
4 1200 X 1600 2 70,000.00 140,000.00
5 900 X 1400 1 55,000.00 55,000.00
6 1700 X 600 1 35,000.00 35,000.00
7 1300 X 800 1 60,000.00 60,000.00
8 600 X 700 7 25,000.00 175,000.00
9 600 X 1400 2 45,000.00 90,000.00
10 780 X 1000 1 30,000.00 30,000.00
SUBTOTAL 1,635,000.00
WORKMANSHIP 80,000.00
GRAND TOTAL 1,715,000.00


Many thanks Sirs/Ma's

Cc: Hajji,Brabus,Egunmogaji,Spyder,Twinskenny,Gbadexy,Rotech,Raymondfirstborn,n3xt and greta minds here

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 2:25pm On Jan 31, 2021
PAPAFEELERS:

Boss,
Please share more info on this bro.
I have gotten the 5mm glass tip and also Eguns comment as well.
If you can just share 2 or 3 lines on items to buy, how to know which one is naija or imported aluminum frames etc this will be very helpful not just to me but other lovers of knowledge.
Thanks

Baba don’t go and take a huge risk.

You still need your fabricator to do this. You just need to let him understand why you’re taking that approach.

Don’t go to market and buy stuffs yourself. A client was made to buy 20 packets of drilling bits for a 39 window project.m whereas they use only 1 piece for the whole job. The bulk of the materials were stolen.

You’ll need someone with experience to work with you on this.

Before now, I pay people to do stuffs for me until 2013 when I paid my window fabricator to do a window and he travelled to Mecca grin grin
Next thing, the client started dragging me over window.
I didn’t have issues building the whole house from foundation to roofing within 40 days. The windows took almost 30 days.

The guy kept showing same materials to almost 5 different contractors and we all believed our work is ongoing grin grin

What I do now is to buy all my materials, take them to site and get fabricators to come and assemble and install on site. There’s nothing they need that I can’t/won’t provide.

______

On the 5mm thick glass, it’s really not compulsory. I just feel we needed something bold and stronger on the project and also I’m doing large windows.
I have some windows as wide as 5m on the project.

4mm can as well achieve the same look.

_______

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 2:29pm On Jan 31, 2021
[quote author=mank1234 post=98604749]

Your work is always neat. [/quotie]

Thank you sir
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 2:32pm On Jan 31, 2021
mank1234:


Your work is always neat.

Thank you sir
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 2:47pm On Jan 31, 2021
Enyinne:
Thats very very high get 3 or more quotations and compare.

grin grin

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 2:55pm On Jan 31, 2021
winta2008:
Hello House,

We digged septic tank and Soakaway for 6 flats. 3 flats with one septic tank, the other flat with one Septic Tank. And one central Soakaway and we channeled the bathroom and kitchen water to the Soakaway. Within 6 months. The two septic tank Got Filled and the Soakaway. After, we discharged the Septic Tank. We disconnected, the bathroom and kitchen water of 4 flats. But, to my surprise. Within 4 months the septic tank got Filled again.

What could be the problem


What's the depth of the soakaway/septic tank?

Did you completely cast the floor of the soakaway pit?

Is your area water logged or when it rains heavily how is your environment?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by kopell: 3:15pm On Jan 31, 2021
n3xt:


Baba don’t go and take a huge risk.

You still need your fabricator to do this. You just need to let him understand why you’re taking that approach.

Don’t go to market and buy stuffs yourself. A client was made to buy 20 packets of drilling bits for a 39 window project.m whereas they use only 1 piece for the whole job. The bulk of the materials were stolen.

You’ll need someone with experience to work with you on this.

Before now, I pay people to do stuffs for me until 2013 when I paid my window fabricator to do a window and he travelled to Mecca grin grin
Next thing, the client started dragging me over window.
I didn’t have issues building the whole house from foundation to roofing within 40 days. The windows took almost 30 days.

The guy kept showing same materials to almost 5 different contractors and we all believed our work is ongoing grin grin

What I do now is to buy all my materials, take them to site and get fabricators to come and assemble and install on site. There’s nothing they need that I can’t/won’t provide.

______

On the 5mm thick glass, it’s really not compulsory. I just feel we needed something bold and stronger on the project and also I’m doing large windows.
I have some windows as wide as 5m on the project.

4mm can as well achieve the same look.

_______

Hummmm. Interesting, experience is always the best teacher. If the fabricator came to site to fabricate the widows, are the welder coming to site to fabricate the burglary that will be imbedded in it as well.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 3:34pm On Jan 31, 2021
kopell:
Hummmm. Interesting, experience is always the best teacher. If the fabricator came to site to fabricate the widows, are the welder coming to site to fabricate the burglary that will be imbedded in it as well.

Since 2014 I do everything in my project on site.

Just last week, I bought 2 welding machine and 2 x 7000kva generators, I hate headache.

- incomplete windows
- windows smaller/larger than provision
- usage of inferior materials
- increase in price of materials
- lack of power supply

If my fabricator mess up, there are so many others on the queue.

The only job I do offsite are done in location near me. I mean closer to my house or my office.

_____

Below is 2014 project.

Just imagine what the lady who complained about her interior deco job is going through because she transacted with someone online. Imagine she gave the job to a nairaland contractor who in turn awarded same to the person who disappointed her.
We’d be here blaming the contractor grin


______

Experience has shaped us.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 3:47pm On Jan 31, 2021
I just made delivery of some column shutters to a client this morning. The first thing I told the client was to confirm if there’s space to do the job on site or if he’s happy if I do it in a location near me for adequate supervision.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 3:49pm On Jan 31, 2021
Good evening chief... Do u have any idea how much Cement is retailing now from that ur ewekoro distributor?

@n
n3xt:


Since 2014 I do everything in my project on site.

Just last week, I bought 2 welding machine and 2 x 7000kva generators, I hate headache.

- incomplete windows
- windows smaller/larger than provision
- usage of inferior materials
- increase in price of materials
- lack of power supply

If my fabricator mess up, there are so many others on the queue.

The only job I do offsite are done in location near me. I mean closer to my house or my office.

_____

Below is 2014 project.

Just imagine what the lady who complained about her interior deco job is going through because she transacted with someone online. Imagine she gave the job to a nairaland contractor who in turn awarded same to the person who disappointed her.
We’d be here blaming the contractor grin


______

Experience has shaped us.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 3:50pm On Jan 31, 2021
BiigTee:
Good evening chief... Do u have any idea how much Cement is retailing now from that ur ewekoro distributor?

@n


As at the last time I asked it was between 2850 - 2900 but I’m sure the price will have increased by now.

I’ll ask though
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 3:53pm On Jan 31, 2021
Ok sir.. Pls help me ask... Also help me enquire how early on Tuesday it can be delivered to atan Ota.. Directly to my site as casting is slated for that morning..

Would be needing 150 bags.. Payment on delivery!
n3xt:



As at the last time I asked it was between 2850 - 2900 but I’m sure the price will have increased by now.

I’ll ask though
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 3:55pm On Jan 31, 2021
Are you the engineer in charge of the project opposite NYSC camp.. Along shagamu - Ikenne road?

n3xt:
I just made delivery of some column shutters to a client this morning. The first thing I told the client was to confirm if there’s space to do the job on site or if he’s happy if I do it in a location near me for adequate supervision.



1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 3:57pm On Jan 31, 2021
BiigTee:
Ok sir.. Pls help me ask... Also help me enquire how early on Tuesday it can be delivered to atan Ota.. Directly to my site as casting is slated for that morning..

Would be needing 150 bags.. Payment on delivery!

Smiles.

Even those who paid upfront haven’t gotten. grin grin

I deal directly with the source and I know when I pay I get my orders supplied.

I’m not selling cement though so if you get where you’ll get official rate supplied to you and payment received on site, I’d say jump at the offer.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 4:00pm On Jan 31, 2021
BiigTee:
Are you the engineer in charge of the project opposite NYSC camp.. Along shagamu - Ikenne road?


We plenty there. One of the directors in the Ministry of Housing is the engineer in charge.

The project is a direct labour contract so projects is awarded to many contractors.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 4:21pm On Jan 31, 2021
Really massive development going on there. I can only hope it doesn't end up being like the OPIC estate after campus! [quote author=n3xt post=98609799]

We plenty there. One of the directors in the Ministry of Housing is the engineer in charge.

The project is a direct labour contract so projects is awarded to many contractors. Quote]
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 4:22pm On Jan 31, 2021
E never reach like that grin..

Just help me comfirm if they could meet up with our timing.. Payment shouldn't be a problem
n3xt:


Smiles.

Even those who paid upfront haven’t gotten. grin grin

I deal directly with the source and I know when I pay I get my orders supplied.

I’m not selling cement though so if you get where you’ll get official rate supplied to you and payment received on site, I’d say jump at the offer.

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 4:26pm On Jan 31, 2021
BiigTee:
Really massive development going on there. I can only hope it doesn't end up being like the OPIC estate after campus!

Project resume tomorrow. We are looking at about 300 units and we’ve only done 100.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Blessedsunny2(m): 5:06pm On Jan 31, 2021
Installable of your wall tiles and floor tiles for sales.....� Am (blessedsunny2)Inspire bathroom or toilet, small enough to listen big enough to deliver �
WhatsApp:09077504287,07062955047

1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by megacontrol(m): 5:17pm On Jan 31, 2021
So these were made-to-order? as in sold to client and not leased?

Are your rental steel panels and/or plywood formwork for slab available in Lagos yet?

n3xt:
I just made delivery of some column shutters to a client this morning. The first thing I told the client was to confirm if there’s space to do the job on site or if he’s happy if I do it in a location near me for adequate supervision.



1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 5:29pm On Jan 31, 2021
megacontrol:
So these were made-to-order? as in sold to client and not leased?

Are your rental steel panels and/or plywood formwork for slab available in Lagos yet?


Those were made-to-order. I’m a consultant on the project and we agreed to go with steel shutters due to the size of the project. 4 units of 30 mini flats.

My steel panel aren’t ready for Lagos yet. I’m just making a new set (200 panels) and they won’t likely be ready until end of February.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by megacontrol(m): 5:58pm On Jan 31, 2021
Hello people,

If you have used marine boards that are still in good condition and what to sell off, pls drop me a message.

Search location: lekki - ajah axis
Qty: 50+ pcs
Note: Board in fairly good condition, plan is to use it twice as a minimum.

Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Joybalaba: 6:11pm On Jan 31, 2021
kopell:
Madam you don't have to be in Nigeria to file a transition dispute, if you're in the west that even give you better opportunity to get your money back, as far it is not cash transaction. If she received the money through bank you have a case, you can call the receiving bank once you have the individual information. I hope the lady is reading this as well, if she dose not came out to tell her own part of the story; taking this action will do tremendous damage to her business reputation and banking opportunity.
thanks i will contact her bank and see
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abudu2000(m): 6:13pm On Jan 31, 2021
vickzie:
45k for a duplex with (A.S.E.M), ok o, I rather do it free of charge and have peace of mind than go that low, how much does it cost to print, bind and stamp 4 copies. well....
me too i was shocked when i saw that price. Printing alone could cost up to 20k what about the expertise put into the design, the concept etc. structural design that comes less than 100k should be questioned because the calculations involved for each and every support of the building members self. As a structural engineer even a copy paste job isn't for amateurs let alone a fresh one.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abudu2000(m): 6:18pm On Jan 31, 2021
KelvinCoaster:

A neighbour did her Architectural and structural design for N45,000 last week in Abuja.The project is to be cited down south in her village.
This is not 'hear say'!
okay let me tell u a little secret, most architects and engineers have apprentices, alot of thempr even IT students. They need them for clients like your neighbor that like to underpay. My CEO is a masters degree holder in civil engineering, he's like a god in this job he will never, I repeat never sit on his chair to analyze any job that isn't worth it when there alot of important steel jobs waiting to be touch. Even I won't bother, so such jobs are pushed down for the boyz to practice then checked by the engineer and the errors corrected, is that what you want? When u engage a professional, pay him well for his job and you will get your money worth. If that was how you are being paid in ur own job u won't be able to afford the drawingsinthe first place.

4 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by RockOfAgesAlumi(m): 7:13pm On Jan 31, 2021
PAPAFEELERS:
Ogas in the house please is this a good deal/quotations for casement windows with burglary proof and nets ( 3 in 1 )?

Please help with your experiences in this areas as a property owner or business person. the qoutation was gotten in Abuja.
if its on the high side , please point it out and give me suggeste dfigures i can use to negotiate for a better deal.

S/NO Dimension Quantity Unit Price Total
1 1200 X 1400 8 70,000.00 560,000.00
2 1700 X 1900 1 70,000.00 70,000.00
3 1400 X 1400 6 70,000.00 420,000.00
4 1200 X 1600 2 70,000.00 140,000.00
5 900 X 1400 1 55,000.00 55,000.00
6 1700 X 600 1 35,000.00 35,000.00
7 1300 X 800 1 60,000.00 60,000.00
8 600 X 700 7 25,000.00 175,000.00
9 600 X 1400 2 45,000.00 90,000.00
10 780 X 1000 1 30,000.00 30,000.00
SUBTOTAL 1,635,000.00
WORKMANSHIP 80,000.00
GRAND TOTAL 1,715,000.00


Many thanks Sirs/Ma's

Cc: Hajji,Brabus,Egunmogaji,Spyder,Twinskenny,Gbadexy,Rotech,Raymondfirstborn,n3xt and greta minds here
Boos if you can ask the person that give you the quotation maybe it is TOWER STANDARD OR TOWER
That quotation is Abuja price but you can negotiate the 1200 x 1400 to 55k and some other more that you discover that the price is too high for you

(1) (2) (3) ... (1962) (1963) (1964) (1965) (1966) (1967) (1968) ... (3776) (Reply)

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 60
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.