Re: FG Says Power Generation Hits All-Time High At 4,600MW by cut007: 8:31am On Nov 08, 2014 |
Power failure sounds strange to me. If you live in Awka (Anambra state), then you'll now why generators are actually called STANDBY generators! The light here is almost 24/7 except for intermittent interruptions of at most, 30mins. If this sounds too good to be true, make your enquiries. I doubt if any city can compete with Awka in terms of stable power supply. 2 Likes |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by Nobody: 9:59am On Nov 08, 2014 |
sleekman:I like ur analysis but we shall definitely see by 2019. mind u- that is even if GEJ is re-elected 1 Like |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by Tibins(m): 10:49am On Nov 08, 2014 |
123taiye: Mr man, have you asked ESKON how long it took them to build up power to that MW stated.... ESKON is a private company, meaning SA power sector is private sector driven.... Nigeria under GEJ have just privatized the power sector , and you are here expecting uniterrupted power in just one year... I'm very sure you don't know how long it take to build one power station... It is not like a generator set.... if you must know. It is not only the turbines there is to build, you also have to dvelop and construct a step up station within, then transmission interface to follow - a means of evacuating the power. Again, wether or not the existing transmission lines will be able to accommodate the new outflow.... To the best of my knowledge the power transmission lines we have were built in the seventies, this govt is faced with a bulky challenge to change all of these. IT IS NEVER POSSIBLE TO LIGHT UP NIGERIA AS A WHOLE IN ONE YEAR OF PRIVATIZATION. SITUATION CAN ONLY IMPROVE, BUT WE SHALL DEFINITELY GET THERE SOON, IF THIS GOVT STEP UP WITH THE NEW COMPANIES... GIVE IT SAY THREE TO FOUR YEARS. The end of privatization exercise is the begining of investment in power... More and more companies are already investing, so "from now on, it can only get better" We Nigerians need to be patient sometimes.... and have some trust. For example, one unit of modern compact gas turbine can generate up to 150MW to 200MW, so you need to build up to five of that to get like 750MW to 1000MW. Besides you also have to get a source of gas supplies to the station... this involves lengths of pipe laying.... through communities.... Most of these machines can also be designed as combined cycle engine... We can in addition do steam and hydraulic engines to boost power supplies. But these are huge investments that will take alot of time....Let's be patient and stop politicizing serious issues as power. 1 Like |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by macherie1: 1:34pm On Nov 08, 2014 |
Where is the power please? is it in this same Nigeria cos it has never been this worse in my area in Lagos. |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by calcal: 8:41pm On Nov 08, 2014 |
Shame after 50 years of independent we still debating on electricity. |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by fxskye: 8:39am On Nov 09, 2014 |
Humm....the reality in my area is that the supply of power has reduced so low than what It's used to be say within 2008/2009. And ironically phcn bill is more than 50% higher than what I used to pay. Fuel cost also goes up due to long hr on generator which now become main source of power instead of standby. |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by awodiyat: 11:31am On Nov 09, 2014 |
Let stop decieveg ourself we need up to 50,000mw for naija to enjoy lite.so 4000mw isntg at all |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by Godmann(m): 9:13am On Nov 10, 2014 |
Fools!! Keep celebrating every piecemeal increment in power generation; and keep mute when it drops; while billions are being stolen and thousand of people are dying. our country will soon be past. Truly there was a country. |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by kay29000(m): 10:10am On Nov 10, 2014 |
brownlord: LMAO! I am 100% with you on this. |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by Martini101(m): 8:49pm On Nov 11, 2014 |
cut007:. Gbam |
Re: FG Says Power Generation Hits All-Time High At 4,600MW by kudoxs(m): 6:40am On Nov 14, 2014 |
KUDOXS is here people, I am not asking much of you, I am just asking you to keep me in the contest by not deleting my name when you vote. I am in GRP 5 and NO 10.Thank you and God bless. I don't have a campaign manager, no fancy display poster , but I have you my people and that is enough for me. Please share and tell your friends and loved ones. Your vote counts. www.nairaland.com/1995552/mr-nairaland-december-2014-edition#27994912 |
(1) (2) (3) ... (5) (6) (7) (8) (Reply)
Dollars To Hajj Pilgrims: CBN To Lose N7.6bn Tax Payers' Money - Nairametrics / Dangote Refinery To Cut Ghana’s Fuel Imports And Reduce Pump Price / An Open Letter To Zenith Bank
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 24 |