Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,217,546 members, 8,034,598 topics. Date: Sunday, 22 December 2024 at 05:53 AM

Abuja-kaduna Standard Gauge Railway Completed - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / Abuja-kaduna Standard Gauge Railway Completed (22184 Views)

Trailer Falls In Agege Railway Crossing This Morning - Photos / An Unhappy Train Experience From Enugu Railway (photos) / Nigeria Railway Takes Delivery Of Five 68-Seater Coaches: Pic (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Abuja-kaduna Standard Gauge Railway Completed by davitogreat(m): 1:53am On Dec 02, 2014
ABUJA, Dec. 1 (Xinhua) -- Chinese rail construction giant China Railway Construction Corporation (CRCC) on Monday officially rounded off the track laying work of Nigeria's first standard gauge railway modernization project linking the capital city Abuja and the northwestern state of Kaduna.

With Nigeria's Minister of Transport Idris Umar tightening the last screw of the rail track at a well-attended ceremony, the first standard rail road project of the Chinese firm in Nigeria and the entire West Africa is formally complete for public use, CRCC said.


Constructed in three years, the rail road project gulped nearly 850 million U.S dollars and lasts 186.5 km with nine stations and a design speed of 150 km per hour.

Umar, while expressing satisfaction on the project on behalf the Nigerian government and people of Africa's most populous country, described the project as a significant milestone in the history of Nigeria, as well as a testimony that the transformation agenda of the government was yielding fruitful results.

"I am delighted to be here to perform yet another milestone of the Nigerian railway modernization project," Umar said, noting it will ease the mass movement of people from the Nigerian capital city to the northwestern state of Kaduna.

"We are committed to carry out a lot of modernization projects to make transportation easier for all Nigerians," the official added.

Shi Hongbing, managing director of the Nigerian office of China Civil Engineering Construction Corporation (CCECC), an offshoot of CRCC, said the company would take part in the running and management of the train in the future.

"With the completion of the track laying, it shows we are competent," the CCECC top manager in Nigeria said.

"I want to thank all the people who helped us during the construction," he added, acknowledging, especially, the cooperation and hospitable nature of people of the local communities which the rail project passed through.

"The completion of the rail road is a guarantee for the running of the rail road next year. It will boost the confidence of the Chinese firm and also the determination of Nigeria. And this is a good example of the coast rail road project of the West African country," said Chairman of CRCC Meng Fengchao in a message sent from Beijing, capital of China.

Earlier, Cao Baogang, vice chairman of CRCCCAC, described the project as a "miracle", noting it was completed "under the pressure of Ebola and the security problem in Nigeria."

The Abuja-Kaduna rail line is one of the first Standard Gauge Railway Modernization Projects (SGRMP) undertaken in Nigeria. The railway modernization initiative in Nigeria aims at replacing the existing narrow gauge system with the wider standard gauge system, while allowing high-speed train operations on the railway network.

http://www.shanghaidaily.com/article/article_xinhua.aspx?id=255923

23 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by Movesz(m): 1:56am On Dec 02, 2014
Pls when will they start selling tickets follow @kharlwilder for interestin niraland topics on twitter

7 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by Atyodos: 1:59am On Dec 02, 2014
good for democracy

10 Likes 1 Share

Re: Abuja-kaduna Standard Gauge Railway Completed by kobikwelu(m): 2:22am On Dec 02, 2014
pisshures or .......... grin grin grin grin grin grin

4 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by lilbabyak(m): 2:38am On Dec 02, 2014
.that time I dey sleep but now I don wake. Secondly I made fp again, running to eagle square to announce it.
Now about the topic of the day , it's a good thing but how about maintenance? how sure are we that after election they will continue this kinda laudable project (and how sure are we that it's standard enough) and not those white elephant projects they always do

1 Like 1 Share

Re: Abuja-kaduna Standard Gauge Railway Completed by Nobody: 3:48am On Dec 02, 2014
This is a very laudable achievement. May God bless this government and all Nigerians.

33 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by malawi101(m): 3:59am On Dec 02, 2014
Re: Abuja-kaduna Standard Gauge Railway Completed by Blackfire(m): 4:09am On Dec 02, 2014
in apc mind 'wetin him do sef?'. in pdp mind 'good news'

25 Likes 1 Share

Re: Abuja-kaduna Standard Gauge Railway Completed by Nobody: 5:02am On Dec 02, 2014
lets see if they'll buy bullet trains
Re: Abuja-kaduna Standard Gauge Railway Completed by SirHouloo(m): 5:16am On Dec 02, 2014
I feel there should be one connecting south west to Southeast/ southsouth too.

9 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by Zaikon(m): 5:25am On Dec 02, 2014
CRCC WEH DEH USE GOOGLE TO KNW THE USE OF HOLDING-DOWN BOLT...

2 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by jamace(m): 5:27am On Dec 02, 2014
SirHouloo:
I feel there should be one connecting south west to Southeast/ southsouth too.
The plan to do that already on ground. In fact, It is govt plan to link every state capital to the rail system. Well done GEJ.

29 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by tomakint: 5:56am On Dec 02, 2014
This is the type of news worth reading this cool morning......and they (APC goons and propaganda machines online) want me to abandon this working administration of Goodluck Ebele Jonathan a.k.a the Man of the Moment for one miserable, vindictive funky mallam with clenched fist who abandoned similar project when he grabbed power forcefully in 1983. Thank God for #teamGEJ# Cc: Rossike, Truckpusher, Firefire, Babyosisi, theassassin, jmaine, idumuose, Sunnybobo3, joehannibal, Sincere9gerian, etc

58 Likes 5 Shares

Re: Abuja-kaduna Standard Gauge Railway Completed by seunlayi(m): 6:04am On Dec 02, 2014
this is a great achievement.

3 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by Nobody: 6:07am On Dec 02, 2014
tomakint:
This is the type of news worth reading this cool morning......and they (APC goons and propaganda machines online) want me to abandon this working administration of Goodluck Ebele Jonathan a.k.a the Man of the Moment for one miserable, vindictive funky mallam with clenched fist who abandoned similar project when he grabbed power forcefully in 1983. Thank God for #teamGEJ# Cc: Rossike, Truckpusher, Firefire, Babyosisi, theassassin, jmaine, idumuose, Sunnybobo3, joehannibal, Sincere9gerian, etc

GEJ till 2019!!!
Anyone that doesn't like it can go kiss a swine

57 Likes 4 Shares

Re: Abuja-kaduna Standard Gauge Railway Completed by Descartes: 6:09am On Dec 02, 2014
Democracy in action

1 Like

Re: Abuja-kaduna Standard Gauge Railway Completed by coolzeal(m): 6:12am On Dec 02, 2014
Why do our government have all this huge ceremonies just to commission a project? Get the damn speed train running and we are cool.

7 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by Truckpusher(m): 6:13am On Dec 02, 2014
GEJ is working according to the resources available to him and at his disposal even as some mad men are burning down the North, yet some miscreants are asking me to vote into power a man that threatened our collective unity with bloodbath because he lost an election. undecided





GEJ TILL NIGERIANS GET SENSE.

50 Likes 1 Share

Re: Abuja-kaduna Standard Gauge Railway Completed by abdulwastecx(m): 6:18am On Dec 02, 2014
myhoodlink:
This is a very laudable achievement. May God bless this government and all Nigerians.

Design by Chinese
financed by Chinese
constructed by Chinese

In a country of 175million and a very high unemployment... I am still shock at the cost of thaf project, $850million for a 200km rail standard guage line ( $4.25million/km)

20 Likes 3 Shares

Re: Abuja-kaduna Standard Gauge Railway Completed by stebell(m): 6:23am On Dec 02, 2014
GEJ, transforming Naija since 2010 while one mallam is threatening the unity of this country since 1999.

It wasnt easy for Obama, Mandela.
Mr President, keep doing it.

35 Likes 2 Shares

Re: Abuja-kaduna Standard Gauge Railway Completed by Nobody: 6:23am On Dec 02, 2014
iterator24:
lets see if they'll buy bullet trains
Bullet/High speed trains are very expensive, and require massive passenger numbers to break even on investment.

4 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by LeOstrich: 6:29am On Dec 02, 2014
abdulwastecx:


Design by Chinese
financed by Chinese
constructed by Chinese

In a country of 175million and a very high unemployment... I am still shock at the cost of thaf project, $850million for a 20pkm rail standard guage line ( $4.25million/km)

The completed rail project probably cost far less than the amount Fashole paid as consultancy fees for that phantom Lekki airport.

41 Likes 6 Shares

Re: Abuja-kaduna Standard Gauge Railway Completed by agabaI23(m): 6:41am On Dec 02, 2014
SirHouloo:
I feel there should be one connecting south west to Southeast/ southsouth too.
It has been launched or flagged off. This fresh air things no wan hear
Re: Abuja-kaduna Standard Gauge Railway Completed by azpekuliar: 6:42am On Dec 02, 2014
Can this quickly be moved to the front page, even though it has nothing to do with bombs and Boko Haram?

Anybody who thinks the achievements of the current administration should be drowned by the cacophony of exploding bombs & bullets needs to have his/head thoroughly examined.

15 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by Nobody: 6:47am On Dec 02, 2014
CFCfan:

Bullet/High speed trains are very expensive, and require massive passenger numbers to break even on investment.
reason why I faulted kaduna - Abuja to begun with.. could have been Lagos - abuja

2 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by asaridokuboyansh(m): 6:50am On Dec 02, 2014
Well done,BUT the train stations should heavly monitored because It would be one of the target of boko-haram once people start using it.

3 Likes

Re: Abuja-kaduna Standard Gauge Railway Completed by eleojo23: 6:50am On Dec 02, 2014
Good development. I saw the possibility of it being completed as planned with the massive work that has been going on there.

Kudos to the government. One step at a time till we get there.

7 Likes 1 Share

Re: Abuja-kaduna Standard Gauge Railway Completed by gbodimowo(m): 6:52am On Dec 02, 2014
OK
Re: Abuja-kaduna Standard Gauge Railway Completed by Nobody: 6:53am On Dec 02, 2014
Awesome!
Re: Abuja-kaduna Standard Gauge Railway Completed by sommyblaze(m): 6:53am On Dec 02, 2014
.
Re: Abuja-kaduna Standard Gauge Railway Completed by davdandam(m): 6:53am On Dec 02, 2014
I'm davdandam and I have space booking syndrome angry

1 Like 1 Share

(1) (2) (3) (4) (5) (Reply)

Visa Lottery Results Are Out (DV 2010 Status Check) / UK Riots: Ministry Of Foreign Affairs Issues Travel Alert. / Important Advice To Students Coming To The UK

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 34
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.