Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,224,385 members, 8,059,676 topics. Date: Wednesday, 22 January 2025 at 05:47 PM |
Nairaland Forum / Nairaland / General / Politics / Mimiko's Projects In Akure Alone! (1870 Views)
Aregbesola Inspects Ongoing Projects In Osun State / Ambode Inspects On-going Projects In Badagry (photos) / Buhari Commissions Road Projects In Zamfara (photos) (2) (3) (4)
Mimiko's Projects In Akure Alone! by topazjosh(m): 8:08am On Apr 15, 2015 |
Governor Mimiko's Roads & infrastructural development of the city of Akure has not only brought development to the city but has also given Akure a true capital city outlook. FACTS: 1) The amount of work Iroko did on the long stretch Adesida/ Oyemekun road (from Fiwasaiye to FUTA junction road block alone will cover nothing less than 100 street roads. Besides being a dual carriage way that span over 9 kilometers,grade A asphalt overlay were effected all through. The road was completely transformed by Mimiko with quality asphalt from beginning to the end. What about the following: modern functioning street lights powered by diesel generator for the past four years non stop,over 40 parks including the phenomenal democracy park, 16 modern bus stops,rechannelization of the waterways,the two big roundabouts and the decorations,the modern roads signs,the bridges,massive drainages and retention walls. Do some even realize that over 80 buildings were demolished to give way for the Democracy Park with compensation paid to all the owners without complaints from any angle? 2) Arakale road: this is a 5 kilometer road dualized with quality asphalt overlay. Over 200 buildings including banks were demolished and compensation paid to every owner without complaints from any source. Six massive parks were established on the road after the demolition of several other buildings. Bus stops and non stop diesel powered functioning street lights for the past one and a half years. Two massive roundabouts at both ends of the road. The total reconstruction and transformation of the NEPA market into a modern shopping mall to change the look of the road. If Mimiko left the road as it was and channelled the money,energy and time on this road on some streets in Akure,tell me how many roads/ streets that will give you. 3) Oke-Ijebu road : this long stretch road completely repaired by Mimiko with walkways,bridges and Channelization of waterways and street linings. 4) Oke Aro: another long stretch repaired by Iroko. 5) Reuben Fasoranti road (Fiwasaiye to Owo junction): work was less than 30% on this road when Mimiko took over. He completed this road with quality asphalt,walk ways, solar powered lights, incorporated a big roundabout,six modern bus stops and good drainage system. 6) Ondo road dualization: Work was less than 30% completed when Mimiko took over. The governor completed this work started by Dr. Agagu with functioning non stop diesel powered street lights for the past four years. 7) The Oda estate roads: the work done here will give you ten good streets which some other governors might be commissioning. The road now links up with ijoka. Adegbola junction to Ilesha express,through Akure High school area. I don't know the exact kilometers but the work done by Mimiko here is enormous. 9) The roads neighbouring Isikan market and the Channelization, drainages and bridge works around there. (Check out Omi yeye and Omi elegbin,two big streams that used to kill people and destroy properties before Mimiko came). 10) The roads around Mother and Child hospital. 11)The roads behind Oke Ijebu mega school. Ah!, check out this area. It was absolutely impassable before Iroko. But bridges, great retention walls,,Channelization of the waterways and quality asphalt has eliminated all handicaps. 12) Idi-agba tuntun road,repaired by Mimiko. (13) The roads behind NEPA shopping mall leading to Arakale and bursting out at Lao area. 14) Nine newly asphalted roads at Alagbaka Governor's office area to Governor's house area. 15) The road by the New Royal birds Hotel Alagbaka (one and half kilometers completed) 16) the road from St Michael 2ndry School to sawmill Ijoka 2ru power line down to car wash at Oshinle was asphalted by Mimiko's govt. 17)The Road beside D&G petrol station(4merly Adabol petrol station) b4 Otegbeye junction was also rehabilitated with quality asphalt, 18)The St Luke rd from Investment down to Victory Nur&Pry Schl then to Ijoka and stop after Power line junction. 19) The road in front of Natnal Open University at Oba Afunbiowo Estate along Idanre, Oke-Aro Akure was tarred. 20) Seventeen streets at Lafe - Fanibi to Aule road Akure. 21: Rehabilitation of additional 50 roads within Akure metropolis in January February 2015. (Still so much more that I can't remember now.) And talking about asphalt works again,I can assure you that the asphalt in places like the mechanic village,M&C hospital, neighborhood markets,Automart,Vaccine storage centre/pry health care board,The High courts, NEPA shopping mall and so on will give you more than ten of such roads commissioned by some other governors. ALSO,if you can count the number of structures and infrastructures that the great Iroko has completed within five years in Akure alone,I doubt if any other governor can match his pace. Take a cursory look at the following and tell me what his predecessors (except Ajasin) did in Akure: 1: Education Quality Assurance Building 2. Civil Service Commission building 3.Public Service Trainning Institute,Ilara Mokin 4: Orange Fm building 5: Event centre Ijapo 6: State Pry Health Care building 7: ORIREWA (vaccine storage center) building 8:M&C Akure,Phase 1&2 9. Democracy Park Akure 10: the Diabetes control centre 11: New Governor's house building 12: Sunshine Housing Estate 13: Ilekun Housing Estate 14: 4 Mega schools 15: New Administrative building at the stadia in Akure. 16:Four neighbourhood markets 17: NEPA ultra modern Shopping Mall. 18: comprehensive renovation of the state secretariat 19) comprehensive renovation of the state high court and premises 20) Comprehensive reconstruction of St. Peter's Unity secondary school. 21) comprehensive renovation of Adegbemile hall 22) Administrative building Akure sports stadium. 23) The Dome,international Event centre (about 95% completed now) 24) The new Civil Engineering building (four storey). credit: Remigius Akinbinu. |
Re: Mimiko's Projects In Akure Alone! by ademega(m): 8:27am On Apr 15, 2015 |
Why this campaign when he is not asking reelection? |
Re: Mimiko's Projects In Akure Alone! by henchamb(m): 9:09am On Apr 15, 2015 |
Pictures or ... |
Re: Mimiko's Projects In Akure Alone! by maxell(f): 4:42am On Apr 15, 2021 |
I think Mimiko is one of the best (if no the best) Governors in the history of Ondo state. |
Re: Mimiko's Projects In Akure Alone! by chromosomeXY: 5:47am On Apr 15, 2021 |
maxell:The best governor in what way? This is a man that didn't pay salary for seven whole months. Mimiko is a failure. |
Re: Mimiko's Projects In Akure Alone! by maxell(f): 1:37pm On Apr 15, 2021 |
chromosomeXY: The salary was a flaw, but he did well in development and infrastructure. 1 Like |
Re: Mimiko's Projects In Akure Alone! by Nobody: 1:39pm On Apr 15, 2021 |
maxell:It seems nah Mimiko send you and the OP. |
Re: Mimiko's Projects In Akure Alone! by maxell(f): 1:53pm On Apr 15, 2021 |
DubaiLandLord: Nobody send anybody. The man did well in development across all local govt areas. His flaw was the salary issue. 1 Like |
(1) (Reply)
Ben Bruce Activities And Cramjones Initial Release... Former Employee's Opinion / Breaking: President Buhari Plans To Arrest Jonathan? / Kenyatta To Obama: Gay Rights Non-issue To Us
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25 |