Stats: 3,237,759 members, 8,105,948 topics. Date: Sunday, 16 March 2025 at 05:43 AM |
Nairaland Forum / Nairaland / General / Properties / Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu (723 Views)
How Much It Will Cost Me To Build 3 Bedroom / How Much Will It Cost Me To Build 3 Bedroom Flat At Ifo In Ogun State. / Four Bebroom Duplex With Two Bedroom BQ (2) (3) (4)
Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu by FolorunsoAdeolu: 2:55pm On Jun 20, 2015 |
With 3.5 one can build a 3 bedroom if one has a piece of land |
Re: Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu by nortcentrallord(m): 3:08pm On Jun 20, 2015 |
Let's see your breakdown please. |
Re: Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu by snakebeat: 3:48pm On Jun 20, 2015 |
Does it include roofing, plastering etc.... Let's see the project costing and evaluation. |
Re: Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu by PHIPEX(m): 7:27pm On Jun 20, 2015 |
I also await your cost breakdown. |
Re: Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu by FolorunsoAdeolu: 5:33pm On Jun 21, 2015 |
The 3 bedroom covers an area of 110m2 each bedroom is en-suite it has a visitor's toilet (3 by 4) terrace(4 by 10) sitting room (14 by 16) dining area (8 by 14) each bedroom is (11 by 11)kitchen is (8 by 10). Step 1 pegging materials plank (1by12)4 no #1000 each rope peg nail total #10,000 step 2 digging 30,000 |
Re: Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu by FolorunsoAdeolu: 6:01pm On Jun 21, 2015 |
Step 3 casting of foundation base cement 15 bags (15*1800)27000 sharp sand 5 tons 15,000 granite 7 tons 31,500 labour 25000 step 4 setting of blockwall up to ground floor level block 1000(9 inches 900 and 6 1nches 100) 160000 cement 15 bags 27000 sharp sand 5 tons 15,000. Labour. 40000 |
Re: Build 3.bebroom Flat With 3.5m 08137196991 Folorunso Adeolu by FolorunsoAdeolu: 6:45pm On Jun 21, 2015 |
Step 5 filling and raming of laterite #200k step 6 casting of ground floor or it will be screeded later during finishing works step 7 setting of blockwall up to roof level block 2100 (9 inches 1900 6 inches 200 ) 336,000 cement 30 bags 54,000. Sharp sand. 15 tons 35,000 labour 120,000 step 8casting of lintel material and labour iron rods cement sharp granite 140000 step 8 roofing plank alluminium labour 600,000 SUB TOTAL SO FAR 1,875,500 |
(1) (Reply)
Promo Land Offer In Almond & Vines Garden Estate, Ibeju- Lekki. / 4bedroom Duplex For Sale@oke Agbe Estate,ojodu Berger / Workfield Limited (property Development, Building Designs And Solutions)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 8 |