Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,225,864 members, 8,064,952 topics. Date: Wednesday, 29 January 2025 at 08:14 AM |
Nairaland Forum / Nairaland / General / Business / Business To Business / Transformer Assembly, Installation & Commissioning In Nigeria (2210 Views)
500kva Transformer ,RMU For Urgent Sale In Abuja. (2) (3) (4)
(1) (Reply)
Transformer Assembly, Installation & Commissioning In Nigeria by obi2ice(m): 7:41pm On Jun 28, 2015 |
tyronpowerservices.com Our Experienced Team Has Installed Thousands of Transformers and Kept Them In Service, Delivering The Reliable Power You Need You’ve purchased a new transformer, but there’s SOME ASSEMBLY REQUIRED! TPS has the capability and equipment to completely assemble and install your OLYMPUS DIGITAL CAMERAtransformers. We install transformer of all capacities ranging for 50KVA to 100MVA.TPS can also disassemble units that may need to be moved. We can start with receiving inspection at the rail siding, port of entry, substation site or wherever the unit is located, and then assemble all parts that were removed for shipment to make the transformer operational. If the unit was shipped oil-filled and it is necessary to lower the oil level to install bushings or other parts, Waukesha® Service can get it done. TPS oil tank trucks can be summoned to the site for oil storage or hauling, and we can bring in one of our many oil-processing rigs. Using your specifications, the transformer supplier’s specifications or ours, TPS can vacuum degasify and prepare new oil for installation, pull vacuum on the transformer and professionally complete the vacuum oil-filling process. A wide range of tests can also be performed to verify that your transformer is ready for service: Omicron Power Factor Test of Windings Omicron Power Factor Test of Bushings Omicron Surge Arrester Test Core Resistance (Megger) TTR (Transformer Turns Ratio) Winding Insulation Resistance Winding Excitation Winding Resistance CT (Current Transformer) Ratio, Polarity and Saturation Operational Check of Controls Calibration of Gauges Thermal Scans Doble® Sweep Frequency Response Analysis Phase Relation Materials & Oil Testing: Oil General Chemistry DGA (Dissolved Gas Analysis) Furfural Analysis Particle Count Metals-in-Oil Analysis Degree of Polymerization Your transformer is one of the most expensive and important components in your substation, and you can be confident that the skilled TPS team will assemble and install it right. We handle any other sub station jobs that might be needed to ensure proper operation of your transformer like Extension of HV power 132KV/66KV/33KV/11KV (Underground and Overhead) Reticulation of LV power ie connection to end users Professional trunking, connection and termination of cables. TPS Team: (234) 8053-900-000 Address: 400 Gbazango Extension, Along Arab Road, Kubwa Abuja. Email: info@tyronpowerservices.com |
(1) (Reply)
Self Propelled Tanker Barge Available For Lease...see Pictures And Specification / Portable Tyre Inflator Or Pump / A Warning To Chiboy11 From Goldwise Nigeria
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 8 |