Transformer Assembly, Installation & Commissioning In Nigeria by obi2ice(m): 7:41pm On Jun 28, 2015
tyronpowerservices.com

Our Experienced Team Has Installed Thousands of Transformers and Kept Them In Service, Delivering The Reliable Power You Need

You’ve purchased a new transformer, but there’s SOME ASSEMBLY REQUIRED! TPS has the capability and equipment to completely assemble and install your OLYMPUS DIGITAL CAMERAtransformers. We install transformer of all capacities ranging for 50KVA to 100MVA.TPS can also disassemble units that may need to be moved.
We can start with receiving inspection at the rail siding, port of entry, substation site or wherever the unit is located, and then assemble all parts that were removed for shipment to make the transformer operational. If the unit was shipped oil-filled and it is necessary to lower the oil level to install bushings or other parts, Waukesha® Service can get it done.

TPS oil tank trucks can be summoned to the site for oil storage or hauling, and we can bring in one of our many oil-processing rigs. Using your specifications, the transformer supplier’s specifications or ours, TPS can vacuum degasify and prepare new oil for installation, pull vacuum on the transformer and professionally complete the vacuum oil-filling process.

A wide range of tests can also be performed to verify that your transformer is ready for service:

Omicron Power Factor Test of Windings
Omicron Power Factor Test of Bushings
Omicron Surge Arrester Test
Core Resistance (Megger)
TTR (Transformer Turns Ratio)
Winding Insulation Resistance
Winding Excitation
Winding Resistance
CT (Current Transformer) Ratio, Polarity and Saturation
Operational Check of Controls
Calibration of Gauges
Thermal Scans
Doble® Sweep Frequency Response Analysis
Phase Relation
Materials & Oil Testing:
Oil General Chemistry
DGA (Dissolved Gas Analysis)
Furfural Analysis
Particle Count
Metals-in-Oil Analysis
Degree of Polymerization
Your transformer is one of the most expensive and important components in your substation, and you can be confident that the skilled TPS team will assemble and install it right.

We handle any other sub station jobs that might be needed to ensure proper operation of your transformer like

Extension of HV power 132KV/66KV/33KV/11KV (Underground and Overhead)
Reticulation of LV power ie connection to end users
Professional trunking, connection and termination of cables.

TPS Team: (234) 8053-900-000

Address:
400 Gbazango Extension,
Along Arab Road, Kubwa Abuja.

Email:
info@tyronpowerservices.com

(1) (Reply)

Self Propelled Tanker Barge Available For Lease...see Pictures And Specification / Portable Tyre Inflator Or Pump / A Warning To Chiboy11 From Goldwise Nigeria

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 8
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.