Nairaland Forum / Nairaland / General / Properties / Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State (54908 Views)

Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic / A Two Unit Of 2 and Three Bedroom Bungalow With C Of O - 6million (photo) Asaba / Two-storey Building Collapses In Ogidi, Anambra, 7 Feared Dead (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (Reply) (Go Down)

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by keziah123: 3:06pm On Sep 05, 2015
abdulwastecx:
For these building, we will be using precast concrete fascias :
1. size of precast facial : 450mm
2. Nominal reinforcement/hook of precast facial = 8mm high yield bar
3. mix ratio 1: 3
4. curing time: dry
Pls what's average cost per sqm for precast fascia
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 4:39pm On Sep 05, 2015
keziah123:

Pls what's average cost per sqm for precast fascia

concrete fascia precast is measured per meter run (m) not per square meters.

For the above project of 50m perimeters, here is my cost projection

1. workmanship : for moulding, fixing and dressing = N80,000
2. Moulder, side angle and other miscellaneous materials = N7,000
3.Cement for moulding, casting and dressing = N 35bags @ N1,800
= N 63,000
4. sand of one trip = N12,000
5. formwork materials and workmanship = N30,000
6.Reinforcement to head course : N32,000
Total = N 232,000

note: ( including cost of head course, which has been paid for before, subtracting that will leave us with N180,000).

Amount per meter run ( including head course) = N232,000/50 = N4,640.

Amount per meter run ( excluding the head course/beam). =N180,000/50 = N3,600

3 Likes 2 Shares

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by keziah123: 5:14pm On Sep 05, 2015
Thanks Abdul. Will require ur services soon.

abdulwastecx:


concrete fascia precast is measured per meter run (m) not per square meters.

For the above project of 50m perimeters, here is my cost projection

1. workmanship : for moulding, fixing and dressing = N80,000
2. Moulder, side angle and other miscellaneous materials = N7,000
3.Cement for moulding, casting and dressing = N 35bags @ N1,800
= N 63,000
4. sand of one trip = N12,000
5. formwork materials and workmanship = N30,000
6.Reinforcement to head course : N32,000
Total = N 232,000

note: ( including cost of head course, which has been paid for before, subtracting that will leave us with N180,000).

Amount per meter run ( including head course) = N232,000/50 = N4,640.

Amount per meter run ( excluding the head course/beam). =N180,000/50 = N3,600
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by PeoplesArmy: 7:55pm On Sep 05, 2015
abdulwastecx:


concrete fascia precast is measured per meter run (m) not per square meters.

For the above project of 50m perimeters, here is my cost projection

1. workmanship : for moulding, fixing and dressing = N80,000
2. Moulder, side angle and other miscellaneous materials = N7,000
3.Cement for moulding, casting and dressing = N 35bags @ N1,800
= N 63,000
4. sand of one trip = N12,000
5. formwork materials and workmanship = N30,000
6.Reinforcement to head course : N32,000
Total = N 232,000

note: ( including cost of head course, which has been paid for before, subtracting that will leave us with N180,000).

Amount per meter run ( including head course) = N232,000/50 = N4,640.

Amount per meter run ( excluding the head course/beam). =N180,000/50 = N3,600

Thanks for your detailed explanation. This has provided clarity for some things...hopefully we shall be talking soon too.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by mufutau55(m): 1:03am On Sep 06, 2015
abdulwastecx:


concrete fascia precast is measured per meter run (m) not per square meters.

For the above project of 50m perimeters, here is my cost projection

1. workmanship : for moulding, fixing and dressing = N80,000
2. Moulder, side angle and other miscellaneous materials = N7,000
3.Cement for moulding, casting and dressing = N 35bags @ N1,800
= N 63,000
4. sand of one trip = N12,000
5. formwork materials and workmanship = N30,000
6.Reinforcement to head course : N32,000
Total = N 232,000

note: ( including cost of head course, which has been paid for before, subtracting that will leave us with N180,000).

Amount per meter run ( including head course) = N232,000/50 = N4,640.

Amount per meter run ( excluding the head course/beam). =N180,000/50 = N3,600

The best explanation and cost one can ever wished for... If I can achieve my precast parapet materials and installation for N400k. I will surely do it.
But I am not spending million Naira for any parapet. Thank you my Boss.

Hajji M.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 7:36am On Sep 06, 2015
mufutau55:


The best explanation and cost one can ever wished for... If I can achieve my precast parapet materials and installation for N400k. I will surely do it.
But I am not spending million Naira for any parapet. Thank you my Boss.

Hajji M.

You are welcome sir
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by Nobody: 8:41am On Sep 08, 2015
[quote author=keziah123 post=37700453] my only concern about
the parapet is the
additional load it creates on the
building because the iron rods
and concrete are quite weighty. what did u do to cater to for the additnal stress?.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 9:19am On Sep 08, 2015
[quote author=written post=37787825][/quote]

precast fascias are lighter than in-situ concrete fascia, while polystyrene is the lightest of the three.
The major problem with precast is the molding and fixing ( care should be taken that adequate cement, light reinforcement and adequate curing is observed).

The major effect of concrete fascia on the building is torsion which can be cater for by having a nominally reinforced head beam, light concrete fascia of about 25-40mm section.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by loadman: 9:26am On Sep 08, 2015
abdulwastecx:


precast fascias are lighter than in-situ concrete fascia, while polystyrene is the lightest of the three.
The major problem with precast is the molding and fixing ( care should be taken that adequate cement, light reinforcement and adequate curing is observed).

The major effect of concrete fascia on the building is torsion which can be cater for by having a nominally reinforced head beam, light concrete fascia of about 25-40mm section.

The joining place for precast is not straight, always crooked
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 10:26am On Sep 08, 2015
loadman:


The joining place for precast is not straight, always crooked

I don't really get your point sir....expatiate on it
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by Nobody: 1:54pm On Sep 08, 2015
abdulwastecx:


precast fascias are lighter than in-situ concrete fascia, while polystyrene is the lightest of the three.
The major problem with precast is the molding and fixing ( care should be taken that adequate cement, light reinforcement and adequate curing is observed).

The major effect of concrete fascia on the building is torsion which can be cater for by having a nominally reinforced head beam, light concrete fascia of about 25-40mm section.
thanks. Doesnt ur comment also translate as designing d right column/foundation wch are at d mercY of lintel,beams,d parapet,blockwall,slab,and roof ?
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 9:55pm On Sep 11, 2015
written:
thanks. Doesnt ur comment also translate as designing d right column/foundation wch are at d mercY of lintel,beams,d parapet,blockwall,slab,and roof ?

Building can be design as frame or load bearing wall. When your building is framed the structural members are roof truss, roof beams/head beams, columns, floor slab ( for multiple floor building), ground floor horizontal tie ( if any, necessary if the foundation depth is considerable high for a pad footing/ isolated footing), foundation footing ( either deep or shallow foundation). For such building, block wall is just a partition wall.

concrete fascia act with the beam, it tends to twist the beam thereby creating a twisting moment. such moment is cater for by providing adequate reinforcement detail during construction of head beam
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 10:01pm On Sep 11, 2015
continuation of work.

placement of precast concrete fascia

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 10:03pm On Sep 11, 2015
more pictures

1 Like 1 Share

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 10:40am On Sep 12, 2015
here is the cost breakdown of the foundation work: Activities included in the breakdown includes, the following
1. setting out work
2.excavation work
3.foundation block wall
4.filling with imported laterite
5. Dpm work
6.form work
7. steel work ( build as a frame structures)
8. oversite concrete/German floor

S/N DESCRIPTION OF ACTIVITIES DATE AMOUNT PERCENTAGE
1 setting out ₦ 40,000.00 3%
2 iron work/workmanship ₦ 76,000.00 5%
3 Labor (digging, filling and casting) ₦ 184,000.00 13%
4 cement ₦ 323,000.00 22%
5 block ₦ 246,000.00 17%
6 gravel ₦ 250,000.00 17%
7 sand ₦ 84,000.00 6%
8 Imported laterite ₦ 160,000.00 11%
9 formwork ₦ 63,500.00 4%
10 dpm/polythene ₦ 20,000.00 1%

sum ₦ 1,446,500.00

5 Likes 3 Shares

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 10:56am On Sep 12, 2015
Here is the cost from dpc to roofing level

iron work/workmanship ₦ 164,000.00
cement ₦ 266,000.00
block work( including workmanship) ₦ 643,000.00
gravel ₦ 80,000.00
sand ₦ 84,000.00
formwork ₦ 129,000.00
precast concrete fascia ₦ 180,000.00

sum ₦ 1,546,000.00

2 Likes 1 Share

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by kopell: 1:55pm On Sep 12, 2015
abdulwastecx:
Here is the cost from dpc to roofing level

iron work/workmanship ₦ 164,000.00
cement ₦ 266,000.00
block work( including workmanship) ₦ 643,000.00
gravel ₦ 80,000.00
sand ₦ 84,000.00
formwork ₦ 129,000.00
precast concrete fascia ₦ 180,000.00

sum ₦ 1,546,000.00
This budget is very impressive so far, you really impress me with precast facial cost. Question, what will be the cost different between this facial once that seat flat to the wall and parapet those that shoot out like angel. I hope you understand my question or in simple terms; like those that we always see on oga Sypder sites.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by Onuokwu: 1:56pm On Sep 12, 2015
Thanks a lot for this man...it is really helpful for many purposes especially the detailed costing and percentages of total.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 7:26pm On Sep 13, 2015
Onuokwu:
Thanks a lot for this man...it is really helpful for many purposes especially the detailed costing and percentages of total.

you are welcome
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 12:02pm On Sep 16, 2015
Roofing work

2 Likes 1 Share

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 12:10pm On Sep 16, 2015
More roofing work

2 Likes 2 Shares

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 12:14pm On Sep 16, 2015
Today mark the fifth week on the job....
The speed of the job has been okay considering rain and other unfavorable weather conditions.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by kopell: 2:03pm On Sep 16, 2015
abdulwastecx:
Today mark the fifth week on the job....
The speed of the job has been okay considering rain and other unfavorable weather conditions.
@Abudlwastecx you did not answer my question for precast facial?
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by mufutau55(m): 2:12pm On Sep 16, 2015
abdulwastecx:
Today mark the fifth week on the job....
The speed of the job has been okay considering rain and other unfavorable weather conditions.

Nice work job brother and the expenses are very reasonable... I will eventually give/find you a contract someday.

Hajji M.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by mufutau55(m): 2:16pm On Sep 16, 2015
kopell:
@Abudlwastecx you did not answer my question for precast facial?

I have not seen people doing that kind of parapet in Nigeria... so he may not know what you are talking about.
Why not find a sample photo and post it for him here to see.

Hajji M.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 3:28pm On Sep 16, 2015
mufutau55:


Nice work job brother and the expenses are very reasonable... I will eventually give/find you a contract someday.

Hajji M.

thanks sir...i will be looking forward to that

1 Like 1 Share

Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by LondonCool(m): 4:38pm On Sep 16, 2015
EgunMogaji:


Duly noted. IF you guys decide to come work in Ibadan wink then I'll do the needful.

By the way, will it be your duo that will be entities to bring this level of artisanship to Nigeria?

This is good
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by PeoplesArmy: 8:10pm On Sep 16, 2015
kopell:
This budget is very impressive so far, you really impress me with precast facial cost. Question, what will be the cost different between this facial once that seat flat to the wall and parapet those that shoot out like angel. I hope you understand my question or in simple terms; like those that we always see on oga Sypder sites.

I think the one Spyder does, called "in situ" concrete is more expensive than this one called "precast" fascia. From my cost comparison over the years and in different threads, the overall cost of in situ concrete may be up to 1.6 times that of pre cast fascia.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by kopell: 11:51pm On Sep 16, 2015
PeoplesArmy:


I think the one Spyder does, called "in situ" concrete is more expensive than this one called "precast" fascia. From my cost comparison over the years and in different threads, the overall cost of in situ concrete may be up to 1.6 times that of pre cast fascia.
Thank you it seems you the one that understand my question, although I and hajji had long discussion about it this evening.
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by smiley001(m): 8:10am On Sep 17, 2015
abdulwastecx:
Here is the cost from dpc to roofing level

iron work/workmanship ₦ 164,000.00
cement ₦ 266,000.00
block work( including workmanship) ₦ 643,000.00
gravel ₦ 80,000.00
sand ₦ 84,000.00
formwork ₦ 129,000.00
precast concrete fascia ₦ 180,000.00

sum ₦ 1,546,000.00



Moderate!!!
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by neluyi: 8:52am On Sep 17, 2015
pls house what's the meaning of this 1:6 mortar mixture ratio
Re: Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State by abdulwastecx(m): 4:44pm On Sep 20, 2015
neluyi:
pls house what's the meaning of this 1:6 mortar mixture ratio

1:6 is the ratio of cement to sand in a mix of mortar. It means one proportion of cement to six proportion of sand in a typical mix.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (Reply)

These Are Stages Involved In Building A House / Where's The Best Place To Live In Lagos Mainland? / Cut Your House According To Your Blocks (see Photo)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 42
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.