Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,249,986 members, 8,141,936 topics. Date: Tuesday, 22 April 2025 at 07:14 PM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (3822) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (5248765 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (3819) (3820) (3821) (3822) (3823) (3824) (3825) ... (3868) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by STINEKPROJECTS1: 10:46am On Feb 07
abouzaid:
can one build a four bedroom all en suite bungalow with two and half million or less? I'm doing a cost analysis and it's looking possible from my analysis. what's your views on that? i would give my analysis later after hearing some of your views. my labourers would be sourced exclusively from the north where labour is extremely cheap and the house would not include any fancy works. details later but lets hear your views first.
that’s not possible
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 11:29am On Feb 07
Evangelisttj:


There’s some truth to this, but it’s not entirely accurate.

Many workers abroad (especially in developed countries like the UK, US, Canada, etc.) are paid an hourly wage, but whether they have guaranteed hours depends on the contract type.

Full-time: Typically 36–40 hours per week.
Part-time: Usually around 24 hours per week but can be less.

Some contracts guarantee a minimum number of hours per week, while others, like zero-hour contracts (common in the UK), don’t guarantee any hours.

To me personally, the hourly rate might not work in Nigeria because a lot of client will find it difficult to pay. Presently the skilled labour are demanding for 15k per day and if you to go by hourly rate you need to consider the
cost of transportation and the location of the project.

Transportation and fuel is taking alot of money these days. From oshodi to Ajah alone is 1500naira. From respective house to Oshodi and from Ajah bus stop to site location is not part of the money. Some technicians are spending close to 7k on Transportation per day. 100naira is becoming so useless in transportation area because hardly you will see bus conductor collecting 100naira for 1km journey . If you want to go with your car to site, be ready to spend more because 20-25k will go on fuel alone.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Riosystem: 12:56pm On Feb 07
topsy23:


To me personally, the hourly rate might not work in Nigeria because a lot of client will find it difficult to pay. Presently the skilled labour are demanding for 15k per day and if you to go by hourly rate you need to consider the
cost of transportation and the location of the project.

Transportation and fuel is taking alot of money these days. From oshodi to Ajah alone is 1500naira. From respective house to Oshodi and from Ajah bus stop to site location is not part of the money. Some technicians are spending close to 7k on Transportation per day. 100naira is becoming so useless in transportation area because hardly you will see bus conductor collecting 100naira for 1km journey . If you want to go with your car to site, be ready to spend more because 20-25k will go on fuel alone.

You didn’t include feeding during working hours. The rapid decline of this country is something that truly needs to be studied.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Riosystem: 12:58pm On Feb 07
50kVA Solar Inverter System

This 50kVA solar inverter system with 120kWh lithium battery storage and 60 x 580W solar panels is designed for residential, business, or industrial use, capable of powering:
✅ Multiple air conditioners
✅ Refrigerators, freezers, and water heaters
✅ Lighting, computers, office equipment, and TVs
✅ Pumping machines and kitchen appliances
✅ Other high-power electrical loads

Installmental Payment plan Available

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 2:12pm On Feb 07
Riosystem:


You didn’t include feeding during working hours. The rapid decline of this country is something that truly needs to be studied.

Yeah you are right sir. Feeding 2000naira minimum for those that love bread and beans, swallow in the morning

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:20pm On Feb 07
ajabani4allah:


I thought I am the only one seeing his charges too cheap to be true.

Recheck the info again.. it’s possible we are not newbie in the construction industry, all we care about @arbo contractor Ltd is to make sure you get value for your money and also make sure middle/ low class people can get where they can call there own house without breaking the bank to get such.

Presently some members here are in discussion with me about how they can get this, possibly when it’s done I shall post it here for others to see.
Thanks.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Inception(m): 2:20pm On Feb 07
leocollins:
Hello I supply granite from Akamkpa quarry
I supply to akwa ibom and river state.
This are the prices of materials
Whatapp or call=09054415833

Bookmarked
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by beaulahestate(m): 4:44pm On Feb 07
*CLOSEABLE HOT IKOYI LAND SALES*
💃🏻 *Land Size:* 1279 m ²
REDEVELOP-ABLE OR DEMOLISH-ABLE
2ND AVENUE ESTATE
*Price:* 1.4M per m ²
*Title:* STATE CofO

💃🏻 *Land Size:* 3276 m ²
BANK ROAD/MCGREGOR
FENCED & GATED, SALE/SPLITTABLE.
*Price:* 1.9M per m ²
*Title:* FG CofO

*💃🏻SHORELINE IKOYI SALES*
*Land size:* 750 m ²
*Title:* Gov consent
*Price:* 3,500,000,000

*💃🏻Land size:* 800 m ²
*Title:* Gov consent
*Price* 3,500,000,000

*For Serious Clients Only*
*SEND YOUR OFFER NOW BEFORE OWNER CHANGES MIND*

Call or chat 07069444652, 08122591653
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ELEVATIONVIEWDE(m): 6:30pm On Feb 07
STINEKPROJECTS1:
that’s not possible

2.5million !!
Not possible even if you are not paying workers
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Billions123: 7:26pm On Feb 07
Do we have any interlocking stones seller here?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Tracy2020: 7:54pm On Feb 07
Hello, I just came across this thread and read through from 2023. I’m building a 3 bedroom on a standard one plot in Lagos. All room en suite with guest toilet. I just got a quote for soak away which is 1.5m and fence which includes plastering at 2.9m. Cement cost at 10300. Please I want to know if this is a reasonable quote cos I’m in the U.S. Thank you.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by giantfreelancer: 8:39pm On Feb 07
An Aluminum roofing contractor sent us this quotation for a bungalow in Esan Central of Edo State.

Please, how realistic is it?

For a .45 mm gauge of Agen long span, the man has quoted N10,488 per metre.

His computation indicates he is quoting for 334 square metres or so.
(Modify) (Quote) (Report) (Share)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by horlabiyi(m): 8:50pm On Feb 07
Hello everyone, kindly help me check and review this wiring and fittings quotation.

Building size :- 64ft by 34ft

Two living rooms

Four bedrooms.

I hope the attached images are clear enough. Thank You All

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 9:10pm On Feb 07
Tracy2020:
Hello, I just came across this thread and read through from 2023. I’m building a 3 bedroom on a standard one plot in Lagos. All room en suite with guest toilet. I just got a quote for soak away which is 1.5m and fence which includes plastering at 2.9m. Cement cost at 10300. Please I want to know if this is a reasonable quote cos I’m in the U.S. Thank you.


You'll have to tell us what type of soak away it is and it's dimensions .

Your plot exact measurements will have to be stated and the height of the fence constructed and are you plastering both inside and outside of it ?

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:23pm On Feb 07
horlabiyi:
Hello everyone, kindly help me check and review this wiring and fittings quotation.

Building size :- 64ft by 34ft

Two living rooms

Four bedrooms.

I hope the attached images are clear enough. Thank You All

It will be a kind of difficult to ascertain the quantity quoted. The electrician knows the piping done. Assuming you have the electrical drawing is available it could have been better. What is the make of the wire he quoted for. Also, he should use 1.5mm earth cable g for 2.5mm cable

You can show him the analysis below

1.5mm
Red 5
Black 4

2.5mm
Red 3
Black 3
1.5mm green(earth) 3

4mm
Red 2
Black 2
2.5mm green(earth) 2

Based on the list you uploaded I generated these quantities out.

For thee switches and socket, I believe he quoted for one of the brand in the market.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Procarpenter: 11:14pm On Feb 07
giantfreelancer:
An Aluminum roofing contractor sent us this quotation for a bungalow in Esan Central of Edo State.

Please, how realistic is it?

For a .45 mm gauge of Agen long span, the man has quoted N10,488 per metre.

His computation indicates he is quoting for 334 square metres or so.
(Modify) (Quote) (Report) (Share)


0.45 long span aluminum is 7,100 per SQM
You can check it online yourself no matter how the company is in Nigeria
Can I see your building so I can give you the best quotation for your roof sir….

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by horlabiyi(m): 11:29pm On Feb 07
topsy23:


Alright. Thank You Sir

It will be a kind of difficult to ascertain the quantity quoted. The electrician knows the piping done. Assuming you have the electrical drawing is available it could have been better. What is the make of the wire he quoted for. Also, he should use 1.5mm earth cable g for 2.5mm cable

You can show him the analysis below

1.5mm
Red 5
Black 4

2.5mm
Red 3
Black 3
1.5mm green(earth) 3

4mm
Red 2
Black 2
2.5mm green(earth) 2

Based on the list you uploaded I generated these quantities out.

For thee switches and socket, I believe he quoted for one of the brand in the market.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by horlabiyi(m): 11:32pm On Feb 07
topsy23:




It will be a kind of difficult to ascertain the quantity quoted. The electrician knows the piping done. Assuming you have the electrical drawing is available it could have been better. What is the make of the wire he quoted for. Also, he should use 1.5mm earth cable g for 2.5mm cable

You can show him the analysis below

1.5mm
Red 5
Black 4

2.5mm
Red 3
Black 3
1.5mm green(earth) 3

4mm
Red 2
Black 2
2.5mm green(earth) 2

Based on the list you uploaded I generated these quantities out.

For thee switches and socket, I believe he quoted for one of the brand in the market.


I think he quoted for J&B not sure tho. How about the price for the fittings and the wires? Thank You

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BrickDevo: 11:40pm On Feb 07
Available for work, quality premium designs
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 1:43am On Feb 08
horlabiyi:



I think he quoted for J&B not sure tho. How about the price for the fittings and the wires? Thank You

J&B cable is also a Nigeria cable but don't
know much about the quality cos I am not
their distributor.

Few things I need to point out from the list.
- There is no ceiling light at all from the list. It means you did not have POP at all in the house. He is using wall bracket in all the are Inclucluding kitchen.. Pls confirm from him.
- He listed 5pcs of earth rod and there is no earth coupler. Also the price of original copper earth rod is more than what he price. What he quote should be copper coated earth rod and not original as he stated in his quotation.
-The main PHCN supply to your house, is it going to be 3-phase or single phase? The cut out is 3pcs and normally the cut out suppose to be four(4)(Red phase, Blue phase, Yellow phase and neutral) for 3-phase connection and 2pcs(live & neutral) for single phase connection.

Why using ceiling rose since it's a conduit system of wiring. I could see from the list that you have nine(9) AC and six(6) water heater.
-I don't know the type of fittings he priced but you can request for pictures from him.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Mup4life: 7:57am On Feb 08
Pls i need this exact design of this bath tub original sweet home product and price.

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by horlabiyi(m): 8:41am On Feb 08
topsy23:


J&B cable is also a Nigeria cable but don't
know much about the quality cos I am not
their distributor.

Few things I need to point out from the list.
- There is no ceiling light at all from the list. It means you did not have POP at all in the house. He is using wall bracket in all the are Inclucluding kitchen.. Pls confirm from him.
- He listed 5pcs of earth rod and there is no earth coupler. Also the price of original copper earth rod is more than what he price. What he quote should be copper coated earth rod and not original as he stated in his quotation.
-The main PHCN supply to your house, is it going to be 3-phase or single phase? The cut out is 3pcs and normally the cut out suppose to be four(4)(Red phase, Blue phase, Yellow phase and neutral) for 3-phase connection and 2pcs(live & neutral) for single phase connection.

Why using ceiling rose since it's a conduit system of wiring. I could see from the list that you have nine(9) AC and six(6) water heater.
-I don't know the type of fittings he priced but you can request for pictures from him.


Wow I love this detailed explanation. The building is a full POP building. Concerning the wires, is there any brand you can recommend? The electricity supply will be 3-phase, 9ACs? That’s not possible and the water heater will only be 4 or 5.

I’ll work on everything you said, thank you so much. I really appreciate

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ELEVATIONVIEWDE(m): 9:34am On Feb 08
Abbeyb1ack:
Please boss in the house,what is the estimated workmanship for a foundation(within lagos) of 50ft by 19ft,with laying 3 coaches of blocks.
Total block budget was 600
Thanks

If is the 50ft x 19ft that you send o at 3 courses, you only need 400 blocks (I.e +5% wastage)
Bricklayer- 100k
Cement- 12bags @10k =120k
Sand - 20tons - 165k
Granite -5 ton

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ELEVATIONVIEWDE(m): 9:42am On Feb 08
Ourown:
Hi Guys, please can anyone point me to a thread or any resources that explains and shows the process of building a bungalow? From foundation to roofing step by step process on best practices and materials to use. I don't mind buying a book if there is one available. I am building my first house and I want to make sure I do everything right and not rely blindly on contractors.

Good to know the right thing to do in building, For better advice and guidance visit ELEVATION view dev Ltd. By contacting 08051918408
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:43am On Feb 08
horlabiyi:



Wow I love this detailed explanation. The building is a full POP building. Concerning the wires, is there any brand you can recommend? The electricity supply will be 3-phase, 9ACs? That’s not possible and the water heater will only be 4 or 5.

I’ll work on everything you said, thank you so much. I really appreciate

There are other cables
-Nigerchin
-Coleman
-Witchtech
-Lagostar.

Nigerchin is the best in terms of quality, packaging and insulation(protection)
Lagostar is following Nigerchin because they are quality, packaging and insulation too.
Coleman and Witchtech are in the same category(Level).

If you have pop, why is the electrician quoting for ceiling rose.?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ELEVATIONVIEWDE(m): 9:47am On Feb 08
Billions123:
Do we have any interlocking stones seller here?

Yes
Contact ELEVATION view dev Nig Ltd.
08062267766
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by horlabiyi(m): 11:14am On Feb 08
topsy23:


There are other cables
-Nigerchin
-Coleman
-Witchtech
-Lagostar.

Nigerchin is the best in terms of quality, packaging and insulation(protection)
Lagostar is following Nigerchin because they are quality, packaging and insulation too.
Coleman and Witchtech are in the same category(Level).

If you have pop, why is the electrician quoting for ceiling rose.?

I wonder ooo but I will ask him to come and check everything again. POP pics attached

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 2:43pm On Feb 08
horlabiyi:


I wonder ooo but I will ask him to come and check everything again. POP pics attached

With the design of your POP you need strip light (rope light). Recess spot light and strip light will give a good finishing on this pop. Wall light is becoming an old school installation these days.. You can put me in a conference call with the electrician to guide him on what to do.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 5:06pm On Feb 08
Something like this sir

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Switpete: 8:43pm On Feb 08
Quick sale
Goes for 270k
Hisense refrigerator
Location: Idimu, lagos.
Call or WhatsApp 09165738267

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by hamtabfawaz(m): 9:25pm On Feb 08
Creating Aesthetically pleasing & functional spaces...



Call or WhatsApp : 09122348437

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gbadexy(m): 9:48pm On Feb 08
Damp treatment and repainting with weathershield matte.



https://www.youtube.com/watch?v=9jC4LoeQZRQ?si=XwKh_WcaeawXwy6r

(1) (2) (3) ... (3819) (3820) (3821) (3822) (3823) (3824) (3825) ... (3868) (Reply)

Viewing this topic: 2 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 58
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.