Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,218,076 members, 8,036,510 topics. Date: Tuesday, 24 December 2024 at 07:10 PM |
Nairaland Forum / Nairaland / General / Politics / Foreign Affairs / New Prasa X’trapolis Mega EMU Trains Arrives In South Africa (1194 Views)
Yahya Jammeh Arrives Airport For His Departure. Photos / Pics: Russian Plane Arrives U.S. To Evacuate 35 Expelled Diplomats & Families. / Russia’s New Mega-missile Stuns The Globe (2) (3) (4)
(1) (Reply)
New Prasa X’trapolis Mega EMU Trains Arrives In South Africa by NDIRU: 5:21pm On Jan 03, 2016 |
First X’Trapolis Mega EMU arrives in South Africa The Test Train No 1, or T1 as it is known, has arrived at Pretoria’s Wolmerton Depot, 18 months after Prasa and Gibela Rail Transport Consortium reached a financial close. Prasa Board Chairman Popo Molefe said the 2013/14 financial year saw Prasa commence its R172 billion investment in the “acquisition of modern state-of-the-art passenger trains and the support infrastructure over a period of 10 years.” This investment will replace the current Metrorail rolling stock and meet future rail demands. T1’s arrival “signals the start of our journey to modernise passenger rail infrastructure and services” through Prasa’s Rolling Stock Fleet Renewal Programme. Transport Minister Dipuo Peters said that transport was one of the key pillars in the National Development Plan and added that government was “committed to the transformation of passenger rail infrastructure and in ensuring that rail becomes the backbone of public transport and a mode of choice for the multitudes of our people who depend on affordable, reliable and safe public transportation”. Molefe said the programme was “aimed at replacing the old Metrorail train fleet over the next 20 years at PRASA’s Wolmerton Depot”. He said: “T1 has been specifically built as a test train where all key testing will be done” over a seven-month period. T1 has been specifically built as a test train which means that it will not have any of the normal commuter train fittings such as chairs but will have all its electronic panels exposed and basic structural fittings will be marked for ease of reference during testing and all the data gathered from the tests will be used to validate the train safety, design and performance parameters. A second test train was scheduled to arrive in 2016. “We are in the process of building modern rolling stock that will form the backbone of a world class metro service that is safe, reliable, and affordable,” Molefe said. The new fleet would “meet future rail demands” and would also be designed with universal access features to provide accessibility for people with disabilities, have a 40-year design life and a black box data recorder among other features. The first 20 trains would be built in Brazil and the remainder in South Africa at a new facility. T1, Molefe noted, is the first train to be built out of a planned 600 trains which would be configured as “six cars per train to be able to transport 1,346 passengers.” The new facility, Molefe said, would form “part of a manufacturing hub in Ekurhuleni in line with Government’s Industrialisation Plan” which would see the “promotion of local skills and industry development”. https://www.jacarandafm.com/news-spo...st-new-trains/
|
(1) (Reply)
Muslims Rebuild The Tower Of Babel (shocking Research!) / Fuel Price Has Gone Up In Canada / Ukraine Is Falling Down Like The London Bridge
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 9 |