Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:07pm On Aug 17, 2016 |
msogunro: 57.63 m3 (Cubic Meter) |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:08pm On Aug 17, 2016 |
We Design Unique and good designs for very affordable prices. We also build and finish your houses at top quality workmanship. our designs are always unique, so we always advise to handle the project personally. We also do Interior Designs, Shops, Kitchen Rooms e.t.c attached is some of my designs and finishes. Action the say, speaks louder than words architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems) Dezyns and Structures. Architect Jude O. Odemwingie. email: jude@dnstructures.com email: skimanski4life@yahoo.com website: www.dnstructures.com Tel; 08038390386 or 08185174782 follow us on Instagram: @ dezynstructures Kindly take your time to Follow our numerous professional works on every page of these links below https://www.nairaland.com/1164230/best-architectural-interior-construction-works https://www.nairaland.com/2067260/lekki-gardens-finishings https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4 https://www.nairaland.com/2770635/construction-works-units-flats-new https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension https://www.nairaland.com/3079756/renovation-diary-new-dimension-nigerian |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by msogunro: 8:50pm On Aug 17, 2016 |
skimanski: Thanks Skimanski. I've seen concrete mixer trucks in Lagos and I've seen it used on one of the Nairalnad builds. For such a large quantity of concrete, why aren't concrete mixer trucks used over manual mixing and dumping? I imagine there would be significant benefits in filling the forms in a few hours than filling it in a day or two - efficiency, better quality monolithic concrete pour. I don't know their cost so that may be the reason why its not widely used. |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:16pm On Aug 17, 2016 |
msogunro: The cost of Concrete from Mixer Trucks is more than that of the manual ones. The advantage over Manual Labour mix is Speed. Its way faster for sure. So as a result where its advantage can be significant is if you have a lager size of concrete requirement and little time to complete concrete cast, then you can opt for mixers. except you have money to show off. 1 Like |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by msogunro: 9:44pm On Aug 17, 2016 |
skimanski: The manual mixer is faster? I would have thought the truck is. Same quality in the mix and monolithic foundation I assume. Approximately how much do you think you would have paid to fill the forms had you used the truck mixer? |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:44pm On Aug 17, 2016 |
Conclusion of filling as we prepare for Mechanical and Reinforcement works.
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by twinskenny(m): 9:47pm On Aug 17, 2016 |
Good job boss |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:54pm On Aug 17, 2016 |
msogunro: I mean it has a speed advantage over manual labour mix. Meaning its faster than manual labour mix. Truck Mixers can be as much and 21,100/m3 1 Like |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 4:12am On Aug 18, 2016 |
skimanski: Good work. How many days of filling with water before casting the DPC? When are you planning the casting of the DPC considering the logistics challenge you mentioned? Did you do a soil test or how did you arrive at the foundation design? |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 7:45am On Aug 18, 2016 |
Beulah09: We are working towards casting dpc on Saturday. So after filling, you can reinforce and cast immediately There was no need for soil Test done because it's a storey building and we could assume the land was solid enough from the surrounding. Also the estate have okayed the land for construction. Soil Test is required when you have above 2 floors in such an area. |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 7:46am On Aug 18, 2016 |
Beulah09: We are working towards casting dpc on Saturday. So after filling, you can reinforce and cast immediately There was no need for soil Test done because it's a storey building and the estate have okayed the land for construction in a memo that contains the building codes. According to the estate documents, Soil Test is required when you have above 2 floors. |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 3:37am On Aug 19, 2016 |
skimanski: Now that you are ready for casting, is there any test that is conducted to confirm that none of the pipes are leaking? Something like a leak detection test? |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 11:46pm On Aug 19, 2016 |
Beulah09: There is no need doing a Leak Test on the pipes run. Its as simple as just Pouring water and ensuring it links out. This is it. Pipes that require more technical Leak Test is the pressure/Supply Pipes. Waste pipe never have water on them except when you flush. or waste water. This is unlike the supply pipes that have water constantly waiting to be released. Whats important when installing waste and soil pipes is to ensure you use the Thickest and more solid version, seal properly, and Ensure when your pour water it drains out via its outlet. |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 11:48pm On Aug 19, 2016 |
Complete Reinforcement and Mechanical Works for drains as we prepare for concrete Cast. 1 Like
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 4:27am On Aug 22, 2016 |
Was the DPC casting done or was it postponed? |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:25pm On Aug 22, 2016 |
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:28pm On Aug 22, 2016 |
And today we resume Brick Works
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Maryam: 2:10pm On Aug 23, 2016 |
How many numbers of blocks do you think will be used for this build |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by pato405(m): 3:05pm On Aug 23, 2016 |
where exactly is this estate? and what's the cost of a plot here? any idea pls? |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 10:35pm On Aug 23, 2016 |
pato405: Arcadia Groove Estate. Femi Okunu St. Off the road beside the new Shoprite in Lekki. Land can be above 50m for a Plot. |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 10:41pm On Aug 23, 2016 |
More on Brick Works 1 Like
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 11:15pm On Aug 25, 2016 |
Lintel Level for brick works as we resume wood works on Reinforcement 2 Likes
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:09pm On Aug 31, 2016 |
PICTURES FROM OVER THE WEEKEND. Lintel and Pillar Works 1 Like
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:35pm On Aug 31, 2016 |
. 1 Like
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:44pm On Aug 31, 2016 |
Pictures as we conclude columns and lintel and complete our brick works for ground floor in preparation for our First Floor Deck. 2 Likes
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:52pm On Sep 01, 2016 |
Resumption of Deck Works 1 Like
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:53pm On Sep 01, 2016 |
.
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:50pm On Sep 02, 2016 |
Flooring of Deck. View from Underneath
|
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 12:04am On Sep 03, 2016 |
Moving very fast. Any reason why you are not using marine board for the decking? Could see that you used marine board for the raft. |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:23am On Sep 03, 2016 |
Beulah09: We are using the wood we have on site, no need buy new boards. Which is some pieces of Marine Board and some pieces of 1 x 12 wood. Not necessarily one particular material. What is important is that the wood gives us our straight Deck. Even if not smooth because at the end we'll use suspended Ceilings/POP to cover it up. The reason why we couldn't Run away from using Marine board for the raft is because we can be sure of our building been Properly Square on all Corners and Straight. 1 Like |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 7:07pm On Sep 06, 2016 |
skimanski: Thanks. When will you be casting the deck? Is the ongoing rain not a concern. Which one comes first? The electrical or the plumbinh works? |
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by wanaj0: 5:12am On Sep 07, 2016 |
skimanski: Are you going to use suspended ceiling/POP everywhere? I think it is better to have a smooth surface. You may be able to achieve that by laying membrane on the deck formwork. |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (11) (Reply)
Anambra Man Builds House For Poor Widow, Dedicates It After Completion. Photos / Stop Putting Gas Cylinders Inside Kitchens, Burns Expert Warns / My Tenant Has Refused To Pack Out For Over A Year Now, Help Please!
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 46 |