Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,171,805 members, 7,882,809 topics. Date: Sunday, 07 July 2024 at 03:33 PM

FG Will Complete All On-going Power Projects – Fashola - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / FG Will Complete All On-going Power Projects – Fashola (362 Views)

$16b Power Projects By Obasanjo: Fact-Sheet $16B Appropriated, $13.5b Released / 2018 Budget: Works Ministry To Spend N341bn On Projects – Fashola / FG Will Employ 47,000 Workers To Fix Roads – Fashola (2) (3) (4)

(1) (Reply) (Go Down)

FG Will Complete All On-going Power Projects – Fashola by energywatchng: 7:21am On Feb 08, 2017
The Federal Government says it will ensure the completion of on-going power projects designed to improve electricity generation, transmission and distribution in the country in no distant time.


The Minster of Power, Works and Housing, Mr Babatunde Fashola, announced the government’s position while inaugurating the new National Commissioners for the Nigerian Electricity Regulatory Commission (NERC) in Abuja on Tuesday.

Following the exit of the Chairman and former commissioners of NERC in December 2015, the acting Chairman of the commission had carried on with the activities of the agency without national commissioners as required by law.

The Chairman-designate of NERC, Prof. Akintunde Akinwande, had rejected his appointment by President Muhammadu Buhari, as he did not present himself for screening at the Senate.

The Electric Power Sector Reform Act 2005 states that NERC shall have seven full time commissioners appointed by the President and subject to confirmation by the Senate.

To this end, Fashola said even though government was committed to completing the projects, the bulk of activities in the power sector would hence forth be private sector dominated.

“The first thing to emphasise is that the power sector has been privatised.

“This process occurred and was concluded in November 2013 and has resulted in the vesting of majority of power generation and power distribution in the hands of private owners.

“So for the avoidance of doubt, power is now in private hands, and government is now largely a policy maker and regulator.“

He said that the policy aspect in the sector was domiciled with the ministry, while the NERC was saddled with the responsibility of regulating the value chain operators.

“Regulation is the work of NERC, acting through the commissioners we inaugurated today.

“So for all those seeking licence to generate power, to build coal and solar plants, and all other similar proposals, your letters should go to NERC, not to the ministry although you can copy us for information.“

The minster also urged people with issues on metering and other challenges like estimated billing, customer service issues to direct their complaints to NERC.

Fashola said that the selection of the new commissioners was in line with the extant laws governing the sector.

He said that their appointment was meant to provide stability in government’s regulatory action and institution building to the sector.

Fashola urged the new commissioners to be business oriented in their regulation, while also showcasing firmness and fairness in their regulatory activities .

“Remember that regulations are rules and rules are made for us; we are not made for the rules.

“ Regulate with the understanding that the industry is young, in transition and needs support.

The six national commissioners inaugurated included the Vice-Chairman of the Commission, Alhaji Sanusi Garba, representing North West; Nathan Rogers Shatti, North East.

Others awere Dr. Moses Arigu, North Central; Dafe Akpedeye, South-South; Prof. Frank Okafor, South-East, and Dr. Musilliu Oseni, South West.

http://www.energywatchng.com/fg-will-complete-going-power-projects-fashola/
Re: FG Will Complete All On-going Power Projects – Fashola by Nogodye(m): 7:22am On Feb 08, 2017
Anothe Promise! watching in HD
Re: FG Will Complete All On-going Power Projects – Fashola by Nobody: 7:26am On Feb 08, 2017
Change ni

Government of unending promises
Re: FG Will Complete All On-going Power Projects – Fashola by ritababe(f): 7:38am On Feb 08, 2017
EastGold:
Change ni

Government of unending promises
I bet you by 2019 the promise will continue without fulfilling anyone.
Re: FG Will Complete All On-going Power Projects – Fashola by dunkem21(m): 7:59am On Feb 08, 2017
We believe you, Fash.

(1) (Reply)

Why Buhari Will Not Speak To Nigerians From London – Femi Adesina / Courage To Stand Up And Be Counted / Only Buhari Can Tell Us When He Is Coming Back: Adesina

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.