Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,209,472 members, 8,006,201 topics. Date: Monday, 18 November 2024 at 06:12 PM |
Nairaland Forum / Nairaland / General / Jobs/Vacancies / Nlng Invitation - Expression Of Interest For Train 7 Construction (797 Views)
Vacancy At NLNG Train 7 Project / NLNG Ship Management Limited (NSML) Fresh Job Recruitment (4 Positions) / NLNG Ship Management Limited (NSML) Latest Recruitment – Apply Now (2) (3) (4)
(1) (Reply)
Nlng Invitation - Expression Of Interest For Train 7 Construction by rhemaabass: 2:31pm On Dec 21, 2018 |
INVITATION FOR EXPRESSION OF INTEREST for the Engineering, Procurement, Construction and Commissioning (EPCC) of a New Boil-Off Gas (BOG) Compressor for Nigeria LNG Limited INTRODUCTION Nigeria LNG Limited (NLNG) plant complex is located on Bonny Island, Rivers State, Nigeria, consists of six Natural Gas Liquefaction Trains with a total capacity of 22 million tons of Liquefied Natural Gas Liquids (NLG) per annum with associated gas receiving, treating, storage, loading facilities as well as utilities( Electrical Power Generation, Water, Air, Nitrogen etc) and support infrastructure (Offices, Residential Accommodations, School, Hospital, Airship, Jetties etc). NLNG intends to install a New-Boil off gas compressor of its plants complex in Bonny Island Rivers State. NLNG hereby invites interested reputable companies with relevant brand field projects/construction experience in Gas Production Plant, Oil Refineries, chemical power Plants or Similar Heavy Industrial Facilities to submit an Expression of Interest (EOI) for the purpose of prequalification for the Engineering, Procurement, Construction, Installation and Commissioning of the New-Boil off Gas Compressor at the plant complex in bonny Companies considered to have met Prequalification requirement will subsequently receive invitation to tender for the works with detailed scope of work. SCOPE OF WORKS Contractor shall be required to provide interfacing, project management,personnel, equipment, materials and other services required to deliver the following: I. Engineering: Including designs of process systems, civil and structural works, mechanical works and general facilities. II. Procurement of required equipment and materials including Long Lead Items (such as drain pumps, heat changers, 10KVA transformer, Quench Vessel etc) and bulk materials including but not limited to pipes and pipe fitting, civil/ structural materials etc. III. Construction works covering of a 5Kg/s cryogenic compressor and associate civil/structural works, mechanical, electrical and instrumentation works including equipment integration. IV. Commissioning works covering testing and commissioning activities (Ready for Start-up) and training. PRE-QUALIFICATION INFORMATION Only companies considered to have met NUNGs equipments shall be involved in any further correspondence NLNG is committed to compliance with the Nigerian Content Act 2010 for the Nigerian Content Development. COMMENCEMENT AND DURATION NLNG intends to award a lump contract in Q3 2019, for a period of up to 3 years (inclusive warranty period). Site construction work shall be carried out in the Industrial Area of NLNGs plant complex in Bonny Island, Rivers State, Nigeria. SUMISSION OF RESPONSES Submission in response to the above requirement shall be completely strictly in accordance with the instructions given in this publication, segregated and arranged in the order indicated. Submissions are encouraged where there is an existing and proven alliance between companies with diverse and distinct competences which make up the full scope of this advertisement. Such companies with are advised to summit their interest as one party. For multiple companies alliance similar review and assessment of each company shall be done and disqualification of one party automatically disqualifies the alliance or Joint Venture (JV) companies, hence, no one company documentation (such as Tax Clearance certificate of Incorporation, DPR, NCDMB requirements, HSE, QA/QC policy etc), can suffice for the JV companies. The expression of interest document/requirement should be In electronic copy in PDF format by E-mail to eoiresponse@nlng.com.ng with “CONFIDENTIAL- Expression of Interest- EPCC for a New Boil off Gas Compressor” in the subject line. In either format, the submission MUST BE RECEIVED BY NLNG NOT LATER THAN THREE WEEKS from the date of this publication. · accordance with NLNG’s prequalification procedures. · Notwithstanding the submission of the document for the expression of interest, NLNG is neither constituted or obliged to include any company .
|
(1) (Reply)
Geography And Chemistry Teachers Needed / Niwi International - Earn Up To $10,000 To $50,000 Dollars In A Month / Jobs At International Institute Of Tropical Agriculture (4 Positions)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18 |