Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,205,023 members, 7,990,829 topics. Date: Friday, 01 November 2024 at 05:12 AM |
Nairaland Forum / Nairaland / General / Politics / Federal Government To Commence Renewal Of Extension Joints On Lagos Bridges (197 Views)
President Buhari Approves Renewal Of Appointment Of 12 Non-Career Ambassadors / FG To Resume Third Mainland Bridge Repair As Other Lagos Bridges Get Facelift / FG To Resume Expansion Joints Replacement On Lagos Bridges (2) (3) (4)
(1) (Reply)
Federal Government To Commence Renewal Of Extension Joints On Lagos Bridges by BrandSpurNG: 10:16am On Jul 08, 2019 |
The Federal Controller of Works in Lagos State, Mr Adedamola Kuti, on Sunday stated that materials being shipped for replacement of extension links on the Alaka Bridge in the state had reached in Nigeria. Kuti reported the News Agency of Nigeria (NAN) that the materials were currently being cleared at the port for the contractor to directly mobilise to the site to begin second phase replacement of damaged expansion joints. “Important materials for the repairs of the expansion joints have arrived and we are at the point of clearing them at the Wharf. “We would look at the very critical expansion joints and change them. The contractor has replaced two of the joints just recently,” he said. The controller said that materials needed for replacement of expansion joints were not available locally hence the delay in fixing the bad portions and appealed for understanding by motorists. On the damaged expansion joints causing discomfort on the popular Long Bridge on Lagos-Ibadan Expressway, he said that the joints had been repaired before. Kuti, however, said that the Federal Ministry of Power, Works and Housing was carrying out a “review” of the work done on the bridge to tackle new faults. He added that he had given a directive to Julius Berger to speed up action on reducing discomfort to motorists on the highway. He, however, said that progress was being made on construction works by Julius Berger in the ongoing reconstruction/rehabilitation of the Lagos-Ibadan Expressway project. “Rain is slowing us down but work is going on and we are making progress. As at the last report, section one which spans from Lagos to Sagamu Interchange is about 42 per cent completed,” he said. Speaking on the trailer park in Apapa, Kuti explained that trailers were already using the park while the contractor was completing some facilities there. “We have finished one borehole and we are doing some electrical works also,” he said. He said that the entire trailer park project has achieved 98 per cent completion while the shoreline protection of the park was 70 per cent completed. SOURCE:https://brandspurng.com/2019/07/07/federal-government-to-commence-renewal-of-extension-joints-on-lagos-bridges/
|
Re: Federal Government To Commence Renewal Of Extension Joints On Lagos Bridges by Zikomakanaki(m): 10:21am On Jul 08, 2019 |
About time...go slow too much |
(1) (Reply)
Ohanaeze Lauds Ayade's Industrialisation Drive / Senate To Receive Buhari's Ministerial Nominees Before Friday, Says Ahmed Lawan / SERAP Seeks Probe Of Unfair Treatment Of Former Kebbi State Acting CJ, Karatu
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 10 |