Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,204,985 members, 7,990,670 topics. Date: Thursday, 31 October 2024 at 08:46 PM

The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra - Properties (33) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra (80414 Views)

The Making Of The "Owerri Royal Manor" / The Making Of The "Akure 5 Bedroom Duplex" / The Making Of The Enugu 6 Bedroom Duplex (2) (3) (4)

(1) (2) (3) ... (30) (31) (32) (33) (34) (35) (36) ... (46) (Reply) (Go Down)

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by sonnie10: 3:40pm On Dec 03, 2021
spyder880:
Crafting the doors of this house.........
@somehow this is what you were looking for.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by somehow: 3:51pm On Dec 03, 2021
sonnie10:

@somehow this is what you were looking for.

Thank you
I'm already in talks with @person2person for this.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:43pm On Dec 03, 2021
Phantom042:
Boss, say I want to replicate this in Aba, how much should I budget?

I am still calculating the total costs.
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Phantom042: 6:30pm On Dec 03, 2021
spyder880:


I am still calculating the total costs.


Ok chief
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:27pm On Dec 03, 2021
Plastering the inside of the swimming pool in readiness for the tiles........

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:31pm On Dec 03, 2021
Compound levelling almost completed........

1 Share

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by michlins(m): 7:32pm On Dec 03, 2021
Quality and speed is something you have managed to put together.

And you do it without as much as break a sweat

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:37pm On Dec 03, 2021
We've been working the inner compound to get our desired slope..........

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:44pm On Dec 03, 2021
We plan to start working on the second elephant by tomorrow morning..........

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by tranxo(m): 12:56am On Dec 04, 2021
e be like say the owner of this house's chieftaincy title na ENYI 1 of his village.

1 Like 1 Share

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 11:48pm On Dec 04, 2021
Bro this your roofing na how many ft ?
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 11:48pm On Dec 04, 2021
spyder880:
We plan to start working on the second elephant by tomorrow morning..........

Can we see the back of the elephant?

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:29am On Dec 05, 2021
donforeign:


Can we see the back of the elephant?

I will get the picture when I return to this site. Thanks.
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 10:29am On Dec 05, 2021
spyder880:


I will get the picture when I return to this site. Thanks.


Okay boss thanks
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by hofeshhomes: 5:36pm On Dec 05, 2021
Nice work. Udo akpu Enyi 1

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:32pm On Dec 05, 2021
tranxo:
e be like say the owner of this house's chieftaincy title na ENYI 1 of his village.

hofeshhomes:
Nice work. Udo akpu Enyi 1

cheesy cheesy
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:34pm On Dec 05, 2021
The pool, ready for tiles.........

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:36pm On Dec 05, 2021
Closing all inspection chambers and sealing them finally.......

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:41pm On Dec 05, 2021
More chambers being closed at the back of the house..........

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by sonnie10: 10:14pm On Dec 05, 2021
spyder880:
More chambers being closed at the back of the house..........

Throw in a snake in one of them, lets see where its going to come out.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:33pm On Dec 05, 2021
sonnie10:


Throw in a snake in one of them, lets see where its going to come out.

Lol, the snake will die. cheesy

I posted something on the general topic thread to elicit some kind of discussion because I dont really believe this snake coming out from the toilet bowl stories. It looks impossible to me.

It looks impossible because of the way we construct soak away systems here. Even if we throw a snake inside this chamber, I dont think it will survive the heat and lack of air for a long time because snakes are reptiles that need to breathe in air after some time, they are not fishes. And so with the toilet bowl filled on the inside room with water, the snake may likely suffocate. A couple of hours is my estimate of how long it can last there before dying.

Now, take a look at how well we seal the toilet chambers, I was there myself and made sure that we used a tight mix of cement. Thereafter we had to plaster the chambers the next day, (last pictures) giving us a double layer of sealing. There is no way a snake can get through that, besides we're going to cast a concrete around the chambers on the floor.

Let me also state here that I own some homes myself, I have also built over 50 finished homes for others, I have never heard about the snake in the soakaway or snake inside the toilet bowl story in real life in any of those houses, I only read them here online.

Finally, we will fumigate this house against snakes before we hand it over. Thanks.

9 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 4:12pm On Dec 06, 2021
We are hanging the tanks in this house today, plus water connection lines and other plumbing works.

Tomorrow, we will work on plumbing for the swimming pool.

Kitchen cabinets will also start tomorrow.

We're also working on the lighting as from tomorrow.

We will start to buy materials for the compound floor works as from tomorrow.

More pictures from this site tomorrow.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:18am On Dec 09, 2021
Sample of tiles for our swimming pool.......

Looking for another darker blue like the one on the second pictures to be used as design.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:31am On Dec 09, 2021
Working on the swimming pool area yesterday evening.........

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:43am On Dec 09, 2021
More works at the swimming pool area, plumbing and electrical wiring..........

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:48am On Dec 09, 2021
Preparing the fence rails for installation......

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:51am On Dec 09, 2021
The second gate has also bee

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:02am On Dec 09, 2021
Our tanks are up on the overhead stand plumbing connection completed..........

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:05am On Dec 09, 2021
Room doors are ready, and being installed........

Final painting of door and frame already being arranged.

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:12am On Dec 09, 2021
Keys, handles.......

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:16am On Dec 09, 2021
Sweeping of all the inside will be done this morning, these pictures were taken as work was still being done.......

By Monday, my house washing crew should resume here to start scrubbing every floor space, windows and other surfaces..........

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:01am On Dec 09, 2021
Working on the second elephant..........

(1) (2) (3) ... (30) (31) (32) (33) (34) (35) (36) ... (46) (Reply)

I Cried When I Entered The Houses Of Billionaires In Lekki / These Houses In Ebute Metta Are Too Close To Each Other (pictures) / Lagos Family Houses (Pictures)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.