Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date (8326 Views)

Youths Block Calabar-Itu Road, Demand Immediate Reconstruction (Video) / Ben Ayade Kept Vigil At Calabar-Itu Boundary Between Akwa Ibom & Cross River / Calabar-Itu Road: Senator Ita Enang Has Indicted President Buhari - Group (2) (3) (4)

(1) (2) (Reply) (Go Down)

Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Ayade001(m): 10:57pm On Dec 30, 2021
Taking newsmen on a tour of the entire stretch of road on Tuesday, the Senior Special Assistant to President Muhammadu Buhari on Niger Delta Affairs, Sen. Ita Enang said the road was awarded to Julius Berger at N54b, CCECC at N52.2b to CCECC and Sermatech at N79b.

In his words “From Ikot Ekpene with Spurs in Ididep- Ibiono Ibom to Mbak Ekid Itam in Itu has been awarded to CCECC, a section from Mbak Itam to Oku Iboku Junction has been awarded to Julius Berger, from Oku Iboku Junction to Ikot Nyong by Power Plant in Odukpani, Cross River State has been awarded to Sermatech and from Power Plant to Odukpani Junction, is still awarded to Julius Berger.

“I initiated this project when I was Special Assistant to the President on National Assembly Matters. We had difficulty accessing funds for the road. But now His Excellency the President has asked me to come and assure you that we have raised money from the Tax Credit Window granted by the Federal Inland Revenue Service to the NNPC to fund critical Infrastructure.

“A great part of the N600bn raised from NNPC as a tax credit has been dedicated to this road. The road was awarded in three tranches, the first was at 54b to Julius Berger, the second at N52.2b to CCECC and the third was at 79b to Sermatech Engineering. I want to assure you and confirm that it is for dualization, not rehabilitating, not reconstruction.

Remember that this road was designed for dualization in 1972 and its fulfillment is only coming during Buhari. The road is so far motorable. i want you to give a lot of cooperation and support to the construction companies”. He said while addressing the Village Head of Ikot Abiyak in Oku Iboku who sought confirmation that the road was truly awarded for dualization.
https://www.sunnewsonline.com/calabar-itu-road-dualisation-to-be-completed-before-buharis-exit/

2 Likes 2 Shares

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Nobody: 11:05pm On Dec 30, 2021
I wish they are saying the truth

5 Likes 2 Shares

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Nobody: 12:03am On Dec 31, 2021
This guys are not serious. What is the distance of this road that they have to share it like ground nuts to 3 different company.The only reason is for blame game on one or two of the companies.Is that how they award the roads in the north. They should add more companies per kilo.And why didn't they start the road all the way from umuahia .

17 Likes 1 Share

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by LikeAking: 12:04am On Dec 31, 2021
Madht money!
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Maxymilliano(m): 12:06am On Dec 31, 2021
When did Ita Enang became the minister of roads and transportation ?

2 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by MEGA4BILLION(m): 2:21am On Dec 31, 2021
You stood at the section of the road that was repaired by Akwa Ibom state government some years ago and snap picture telling people the road is motorable. Why not do a drive video down to Odukpani to buttress to point.

27 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by extol1(m): 2:24am On Dec 31, 2021
How can these people make heaven when they keep talking about billions of naira that the citizens hardly feed

1 Like

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by MANNABBQGRILLS: 2:28am On Dec 31, 2021
May Nigeria succeed

7 Likes 4 Shares

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Nobody: 2:35am On Dec 31, 2021
post=108949514:
May Nigeria succeed


Apc zombie

8 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by vineyardfarms: 2:38am On Dec 31, 2021
same politician who came on air to decieve the masses just to get vote to be re elected? Same cheap lies again.

1 Like

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Ndipe(m): 2:48am On Dec 31, 2021
I dont believe them. For years now, the government has been saying that the Calabar Itu road will be rehabilitated but the pictures have discounted their stories. So how are we supposed to believe them this time around?

1 Like 1 Share

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Egein(m): 3:50am On Dec 31, 2021
Biafran4life:
This guys are not serious. What is the distance of this road that they have to share it like ground nuts to 3 different company.The only reason is for blame game on one or two of the companies.Is that how they award the roads in the north. They should add more companies per kilo.And why didn't they start the road all the way from umuahia .

You go just open mouth like goat nyash. How does this particular road link to Umuahia? Besides your name is Biafran4life, so why are you expecting the Nigerian government to fix roads in Biafr.a? Fart face.

9 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Hubeznigeria(m): 4:57am On Dec 31, 2021
I don't have anything to say. I hope it doesn't become audio April 2023... What Nigeria politicians cannot whitewash does not exist.

Happy new year in advance to all Nairalanders.
*****
May we never be unfortunate

For all your Roofing Solutions, we have you covered.
*Quality stone coated tiles
*Quality Water Collectors
*Professional installation
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Nobody: 5:00am On Dec 31, 2021
How long is Calabar-Itu that 3 companies are handling? Report avoided the distances given to each of the 3 companies, which is very rare in road construction.

Calabar to Itu road is 82km.

2 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Onyiiobi7735(m): 5:05am On Dec 31, 2021
extol1:
How can these people make heaven when they keep talking about billions of naira that the citizens hardly feed
These people are worse than witches.

2 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Nairalander248: 5:21am On Dec 31, 2021
Noted
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Jonegonu: 5:28am On Dec 31, 2021
Biafran4life:
This guys are not serious. What is the distance of this road that they have to share it like ground nuts to 3 different company.The only reason is for blame game on one or two of the companies.Is that how they award the roads in the north. They should add more companies per kilo.And why didn't they start the road all the way from umuahia .
from your conclusion I notice that you dont no the road you are talking about. Where did the road connect to umuahia

3 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Princeton92(m): 6:13am On Dec 31, 2021
No be to talk bit na to do am finish prove result, we've heard this before severally about this road!
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Lugianostar(m): 6:17am On Dec 31, 2021
Story for the gods
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by alloy123: 6:21am On Dec 31, 2021
Election time is drawing closer and projects are loading afer 6-7yrs

1 Like

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Nobody: 6:27am On Dec 31, 2021
Why and how is Julius Berger and CCECC responsible for over 99.9% of all state and federal construction works in Nigeria? This monopoly is insane and is one of the major factors for construction project delays - how do you expect the construction company to deliver projects on time when they're working on a thousand federal roads at the same time?

There are reputable Dutch and Belgian construction giants that would rival the quality of Julius Berger and CCECC for half the money and time - Imagine abandoned road and bridge projects everywhere in Nigeria (especially in Ogun State) because these companies have to shift workers and machinery everywhere

Why the greed?

2 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Zendinho(m): 6:46am On Dec 31, 2021
Another Year...
Another Story...
Another Budgetary Provision...
Unfortunately, same old lying mouths, lying to get their way for a same purpose...2023 ELECTIONS.
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by okongo(m): 6:53am On Dec 31, 2021
Sermentech. Hmmm. The quality of their jobs speaks for them. As seen on calabar ikom road.

1 Like

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by realstars: 6:54am On Dec 31, 2021
Death trap,
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by yashika(m): 6:55am On Dec 31, 2021
Ayade001:
https://www.sunnewsonline.com/calabar-itu-road-dualisation-to-be-completed-before-buharis-exit/
It’s very unfortunate that a road marked for dualisation in 1972 and was never dualised is now been awarded for the same dualisation after 50years . Does it mean Nigeria population that use the road didn’t grow or we don’t have people that are thinking for these government. For God sake, what we need is is minimum of 4 lanes on both sides for that road. Our population has tripped and it will increase in another 10years. Don’t we have 10,30,50 years plans when planning our infrastructural development? I weep for my people. Our leaders are messed up.
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by flexyrule(m): 7:13am On Dec 31, 2021
Biafran4life:
This guys are not serious. What is the distance of this road that they have to share it like ground nuts to 3 different company.The only reason is for blame game on one or two of the companies.Is that how they award the roads in the north. They should add more companies per kilo.And why didn't they start the road all the way from umuahia .
If they had handed over the contract to only one company, people would have still complained. Now that an indigenous company has benefited from project... You are still complaining.

If the contract was as started from Umuahia, someone would still complain that it should have started from Orlu.

I traveled that road just last month while rating to escape the high cost of Ibom air flight tickets and I can tell you that this will be the best thing that will happen to travelers on that route in the last ten years.

2 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by flexyrule(m): 7:20am On Dec 31, 2021
Smartini:
Why and how is Julius Berger and CCECC responsible for over 99.9% of all state and federal construction works in Nigeria? This monopoly is insane and is one of the major factors for construction project delays - how do you expect the construction company to deliver projects on time when they're working on a thousand federal roads at the same time?

There are reputable Dutch and Belgian construction giants that would rival the quality of Julius Berger and CCECC for half the money and time - Imagine abandoned road and bridge projects everywhere in Nigeria (especially in Ogun State) because these companies have to shift workers and machinery everywhere

Why the greed?
Julius Berger have been around for decades and they have paid their dues.

The government trust the quality of jobs they deliver and aside that they already have an understanding with our government.

Starting a new business relationship isn't really easy as you think.

When it comes to timely project execution, if you know JB very well, then you'll know that they always deliver their projects on time. Except when funding has been cut or payments delayed, which isn't their fault.

They have more than enough equiptment and the manpower is usually outsourced locally.
Over 80% of the road network in Akwa Ibom was done by JB, and they delivered them in a timely manner because Akpabio ensured that funds was readily available to them.

Even the stadium was delivered on time and the quality is top notch.

7 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by flexyrule(m): 7:21am On Dec 31, 2021
Jonegonu:
from your conclusion I notice that you dont no the road you are talking about. Where did the road connect to umuahia
Calabar - Itu - Ikot Ekpene - Umuahia

2 Likes

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by HacheNoire: 7:25am On Dec 31, 2021
MEGA4BILLION:
You stood at the section of the road that was repaired by Akwa Ibom state government some years ago and snap picture telling people the road is motorable. Why not do a drive video down to Odukpani to buttress to point.


States don’t bare the cost of repairing federal roads. They get refunded for every federal road maintained prior to approval

1 Like

Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by Ugaboy: 7:36am On Dec 31, 2021
Re: Calabar/Itu Road: Construction Company Targets April 2023 Delivery Date by deliveryboy: 8:43am On Dec 31, 2021
Biafran4life:
This guys are not serious. What is the distance of this road that they have to share it like ground nuts to 3 different company.The only reason is for blame game on one or two of the companies.Is that how they award the roads in the north. They should add more companies per kilo.And why didn't they start the road all the way from umuahia .
Umuahia ke? Are your high on meth? One can easily see the complete lack of education amongst Nigerians from the utterly poor comprehension in comment sections. Low education, high confidence.

1 Like

(1) (2) (Reply)

PDP Crisis: Governors Working To Come Up With Solution Soon - Tambuwal / Edo Labour Party Ratifies Julius Abure's Suspension / Bicycle Vs Other Means Of Land Transportation!

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 37
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.