Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,173,578 members, 7,888,871 topics. Date: Saturday, 13 July 2024 at 05:09 PM

Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore (218 Views)

How To Calculate Materials Needed For Beam And Slab (decking) - Diy / When To Use Raft Foundation / Estimate Cost Of Raft Foundation Of 85 By 54@ibeju Lekki? (2) (3) (4)

(1) (Reply) (Go Down)

Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 7:11pm On Jan 31, 2022
Land Size |648sqm
Project Status | Ongoing Development
Budget | Confidential
Client | A Nairalander.
Duration: Done In Stages
Location: Badore Ajah, Lagos



We Design,Build,Renovate and Manage Construction Projects.
S.V Project
Reach Us: Voice & WhatsApp 07031112625
SVProject@yahoo.com

Re: Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 7:52pm On Jan 31, 2022
TO DO: 1. Add 2 Course of Concrete Filled Vibrated Blocks To Increase Raft Height by 500mm.
2. Sand Filling.
3. Ground Floor Slab

Re: Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 8:07pm On Jan 31, 2022
CHALLENGES: 1.Water level rises to knee level from 1pm till evening everyday.
2. Site is inaccessible for truck, Wheelbarrow was used to transload over 60 truckload of sand.

Re: Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 8:20pm On Jan 31, 2022
Sand Filling

Re: Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 8:31pm On Jan 31, 2022
Sandfilling Completed

Re: Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 8:38pm On Jan 31, 2022
Slab A

Re: Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 8:53pm On Jan 31, 2022
Slab 2 was completed at 12:42am in order to avoid disturbance of Omo Onile as we scheduled our works for Sunday.

we got enough tyres for bonfire

Re: Extension Of An Existing Raft Substructure To Ground Floor Slab Stage @ Badore by SVPROJECT(m): 8:58pm On Jan 31, 2022
Done and Dusted.

(1) (Reply)

What To Look Out For In A Realtor If You Want To Sell Your Home Fast / Court Judgment Against Estimated Billing / Tastefully Finished 5 Bed Detached Home For Sale

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 8
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.