Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 9:16am On Jun 03, 2022 |
Facilities: GROUND FLOOR: *Entance porch *Ante room (with visitors' toilet) *Living Room *Dining * A large kitchen with store and terrace * Bedroom 1 (ensuite) * Service exit. UPPER FLOOR: *Bedroom 2&3(all ensuite) * Master bedroom (with a large bath, walk_in closet and a private balcony) *Family lounge(with a front balcony). Architects: Sochdesigns Project contractor: Soch designs. Duration:
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 9:20am On Jun 03, 2022 |
Arrived on 20th may ..after the demolition and evacuation of an existing structure at the site.. setting out was done that same day
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 9:44am On Jun 03, 2022 |
On Saturday may 21st, we started and finished the excavation of the major walls and proceeded to foot areas that kept collapsing during excavation
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 9:48am On Jun 03, 2022 |
Proceeded with the full footing on Monday 23rd may
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 9:57am On Jun 03, 2022 |
On the Tuesday, may 24th, the substructural masonry works began
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 10:03am On Jun 03, 2022 |
0n Thursday, 26th of may, the substructural works were completed..ready for filling
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 10:14am On Jun 03, 2022 |
The filling was completed on Monday the 30th, while the compacting (with flat plate compactor) was done on the 31st of may
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 10:18am On Jun 03, 2022 |
Mass concrete/ German floor on 1st of June
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 10:23am On Jun 03, 2022 |
And then, by yesterday, 2nd June ...the super-structural works began
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 10:35am On Jun 03, 2022 |
Duration so far: 12 days .. ..... (Major)Materials used for the foundation (to DPC/ german floor): 23pcs of 16mm(for column starters) 33pcs of 12mm(for baskets) 150bags of cement 45tons of 1 inch granite. 11 trips of sand. 1,400pcs of 9inches blocks. #Otolo, Nnewi, Anambra state #Sochdesigns |
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by XaeV2(f): 12:23pm On Jun 04, 2022 |
Interesting, and great updates so far. I already bought a two plots for a combination of a room self con, room & parlor sef con, and two bedroom apartment, in 10 : 10 : 5 respectively, all in a single building (commercial property). Have you done such project before? How much do you think will complete that? |
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 6:08pm On Jun 04, 2022 |
XaeV2:.. Good day. Hope you are doing great....do reach us on 07032308415 for any inquiry |
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by hopman98: 10:48am On Jun 05, 2022 |
I go follow this thread bumper to bumper. Pls was soil test carried out b4 work began? And why was pad footing used in the foundation? |
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 6:25pm On Jun 12, 2022 |
hopman98:...no there was no need for a soil test as we are already conversant with the locality. |
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 6:27pm On Jun 12, 2022 |
......lintel formwork
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by SOCHDESIGNS(m): 9:25pm On Jun 16, 2022 |
Leveling underway
|
Re: Construction Of A 4 Bedroom Duplex At Otolo, Nnewi, Anambra State by FromZeroToHero(m): 8:42pm On Feb 08, 2024 |
Soch please what is the essence of this circled place.
|
(1) (Reply)
Property For Sale. Ahmadu Bello, Vi / Brand New Mobile, Air Conditioner Units For Sale. / To Let In Magodo Gra Shangisha
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 15 |