Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,191,151 members, 7,943,150 topics. Date: Sunday, 08 September 2024 at 07:26 AM

Akwa Ibom New Smart Airport Terminal Building, Mro Facility, Nearing Completion - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Akwa Ibom New Smart Airport Terminal Building, Mro Facility, Nearing Completion (550 Views)

Lagos Blue Rail: Marina Train Station Nearing Completion / Akwa Ibom’s New Smart Airport Terminal Building, Mro Nears Completion .. Photos / Fashola Inspects Oweto Bridge Nearing Completion - Picture (2) (3) (4)

(1) (Reply)

Akwa Ibom New Smart Airport Terminal Building, Mro Facility, Nearing Completion by Akwaibomdaily: 2:36pm On Sep 09, 2022
Governor Udom Emmanuel is changing the outlook and capacity of the Victor Attah International Airport, Uyo from a mere aircraft landing bay to world-class that can handle International flights operations, cargo services and repairs/maintenance of all manner of aircraft.

This is in line with Mr Emmanuel’s promise to transform Akwa Ibom into one of the best aviation hubs in Africa.

The nearly completed terminal building is currently undergoing installation of technical and electrical components and looks set to meet the vision of the State Chief Executive. It comes with:

i) A digital self check-in by a robot (pre-planned before Covid-19) and a clinic.

ii) Five bridges, seven elevators, and four escalators which are pressure-sensitive and only move when a passenger is detected.

iii) Special roofing that can last up to 200 years without changing colour.

iv) Very high security architecture with access through fingerprint, digital or card pass.

v) Four methods of fire prevention: fire extinguishers, fire water sprinkler system, fire detectors, FM 200 ie automated fire suppression system.

The terminal, which is designed to accommodate one million passengers per year, occupies a total area of about 30,000 square metres.

Also nearly completed is the first-ever Maintenance, Repairs and Overhaul facility of the airport which is estimated to be 91% completed.

The airport also comes with a second runway and new aprons for all aircraft categories.

To handle the impending influx, Mr Udom Emmanuel is expanding the dual carriage Airport Road into an eight-Lane motorway.

With Aviation Development as one of the fundamentals of his Eight Point Agenda, #MrUdomEmmanuel is silently exhibiting character and competence in fulfilling his campaign promises to the state.

#CompletionAgenda
#UdomLegacy
#AkwaIbomisWorking
#UdomEmmanuelistheBest

1 Like 1 Share

Re: Akwa Ibom New Smart Airport Terminal Building, Mro Facility, Nearing Completion by Nobody: 2:47pm On Sep 09, 2022
Nice
Re: Akwa Ibom New Smart Airport Terminal Building, Mro Facility, Nearing Completion by nesphil(m): 9:53pm On Sep 11, 2022
Amazing Akwa Ibom nnyin
Akwa Ibom Nnyin is rising!

(1) (Reply)

No Going Back On Opposition To Same-faith Ticket — Forum Of Northern Christians / Atiku Pledges Support For Ayu Despite Wike’s Withdrawal From Campaign / Two Statements Tinubu Supporters Hate The Most

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 9
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.