Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 8:17am On Jun 03, 2023 |
Dear Nairalanders, This is my first time here in nairaland, I was training by construction genius (Aventures's) popularly knows in the this platform I'm here to take us through the process of high rise residential apartment owned by popularly know developer in Lagos state God made home(GHM) we have 3 blocks which are A,B,and C. This project contain 10 floors, Ground with mezzanine floor are car park, the remaining floor contain 3 bedroom with BQ and 2 bedroom with BQ, suspended swimming pool,gym house,launch, facility management. This project is sitting on the solid pile foundation of 600 diameter well design and approved by government I'm confidently handle this project from the beginning and to the finishing stage duration of 24 months To make enquiry about getting the price and you want to invest for your future please call me or send E-mail I will respond immediately.
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 9:35am On Jun 03, 2023 |
The best way to solidify your building is to get your foundation right by go through the virtue process Check the strength of the pile with wave method the 2 weakest would be used for loading test to minimize the risk for worse case scenario Using 6" block as formwork is economical and safe from deformation
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Aventures(m): 2:57pm On Jun 03, 2023 |
Great Job, wishing you the best. 1 Like |
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 3:12pm On Jun 03, 2023 |
Thanks boss |
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 7:43pm On Jun 12, 2023 |
It's been some weeks working hard in site to bring out a solid and efficient foundation to resist the load of super-structure After setting blocks on the pile cap we brake the piles to the required level Then we backfill remaining space by the side of the block wall to avoid deformation during the casting of pile cap After the backfilling rebars to pile cap, fixing the reinforcement to the pile cap And locating the column point and fixed the column starter before the casting of the pile cap
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 7:45pm On Jun 12, 2023 |
Casting of the pile caps
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 7:49pm On Jun 12, 2023 |
The whole pile cap has been cast with good vibrator
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 3:40pm On Jun 14, 2023 |
surveyor has an important role to play on site such as setting out the building point,pile carp point, columns location, setback I have surveyor on site to get all those things done There's some tasks need to start on before finishing of pile cap,such as blinding in some part that's ready Blinding to receive ground beam as commence in some area of block A,and Shuttering to ground beam is also in place
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 8:49am On Jul 11, 2023 |
We are been working very hard to get the foundation right for the past month and thank we are moving closer to the positive results just exactly as we planned it to be Casting of the ground beam is done successfully with grade 30kn/m³ according to the structural engineer description After this stage we are moving to back filling in the foundation to make up level . There's is a room for questions and business contact me on 08033925673,08087141253, and email royalconstructionengineering1@gmail.com
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 2:54pm On Jul 11, 2023 |
Removing of the ground beam formwork taking place ahead of back filling of the foundation
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 9:28am On Jul 12, 2023 |
Backfilling to foundation is done completely it's amazing that I couldn't buy a single trip of filling sand The entire foundation was fill up with excavated materials acquired from the pile cap And it's well compacted
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 10:31pm On Jul 18, 2023 |
It's as been 4 days ago we done with compaction of the foundation filling Laying of damp prove membrane (DPM) as done perfect with Blinding to receive reinforcement
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 8:19am On Jul 19, 2023 |
Rebars to ground floor is in progress
|
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 6:32pm On Jul 25, 2023 |
Casting of the ground floor is in progress
|
(1) (Reply)
Nice Metal bullet proof Doors why Go For Imported Doors, Just Like Imported Ones / Petrol Filling Station On Offer For Sale Across Lagos. / Duplex For Sale:
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 17 |