The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:28am On Aug 12, 2023 |
This is the construction of all the iron and welding works for this project handled by oga Spyder880. This includes the making of doors, railings and 40ft tank stand. The duration of the job is one(1) month from today being the day of mobilisation. 3 Likes
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:31am On Aug 12, 2023 |
The samples of what I am expected to make. The tank stand The rails design and the doors 1 Like
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by spyder880(m): 11:33am On Aug 12, 2023 |
michlins: Welcome on board bro, we shall work together in another site soon after this one. 2 Likes |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:41am On Aug 12, 2023 |
Work started on the doors while I await the delivery of materials for the other jobs
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:47am On Aug 12, 2023 |
spyder880:thank you sir for all your efforts |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:49am On Aug 12, 2023 |
Materials for the tank stand just came in. It's funny how this same exact materials added over 30,000 in less than two weeks
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 12:54pm On Aug 12, 2023 |
More materials for the tank stand
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 10:39am On Aug 13, 2023 |
Work is going on with the doors. I expect to start working on the tank stand today 1 Like
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by double3(m): 11:07am On Aug 13, 2023 |
Please post pictures of these doors when it's done..... |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 12:31pm On Aug 13, 2023 |
double3:of course I will be updating the thread |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:48am On Aug 14, 2023 |
The tank stand channels 6 by 3 H beam. Full length for maximum water pressure
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 2:40pm On Aug 14, 2023 |
The materials for the railings came today. Using 2" galvanised pipes
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 2:51pm On Aug 14, 2023 |
The hinges and bolts for the doors. I usually use this type of hinges to eliminate the noise that comes with iron doors |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:19am On Aug 15, 2023 |
Moving materials to site so as to start construction of the tank stand
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:22pm On Aug 15, 2023 |
Got to Asaba this evening and had the materials off-loaded. I intend to start working on the foundation tomorrow morning as the space for the tank is currently occupied by a tree
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:24pm On Aug 15, 2023 |
Meanwhile here in Nnewi, work is ongoing on the doors and I also started working on the railings. Focusing on the stairs first and later on the balcony railings
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 11:25pm On Aug 15, 2023 |
The railings
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 8:47pm On Aug 16, 2023 |
Works are moving on at different levels and I will be posting pictures tomorrow. First, the casting of the foundation for the tank stand was completed this night. The 3ft doors welding have been completed and finishings will start earnestly tomorrow. As for the railings,it is speeding up |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 4:54pm On Aug 17, 2023 |
Pictures of the doors 1 Like
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 4:55pm On Aug 17, 2023 |
The hand rails
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 5:03pm On Aug 17, 2023 |
The tank stand is up and running 2 Likes
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 6:00pm On Aug 18, 2023 |
Completed the construction of the tank stand today and painting will commence tomorrow |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 6:30pm On Aug 19, 2023 |
The tank stand has been finished and painted 1 Like
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 2:37am On Aug 20, 2023 |
michlins:pictures prior to the painting job 1 Like
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 2:39am On Aug 20, 2023 |
The rails 1 Like
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 5:49am On Aug 25, 2023 |
Completed the painting of the stair railings and doors
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 5:51am On Aug 25, 2023 |
Railings 1 Like
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 1:48am On Aug 28, 2023 |
The keys for the doors came in yesterday and installation will start soon
|
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by AlieninPH: 2:34pm On Aug 30, 2023 |
Good afternoon, Michlins. I tried to reach you on your profile Tel no 07032446904. But a lady who doesn't know you replied. Do let me have another number to reach you, so we can discuss about a tank stand, gate and railings for a building project. You can also reach me on my email at curamo@yahoo.com if you are on email. |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 3:12pm On Aug 30, 2023 |
AlieninPH:I can not explain what happened but it's my number |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 9:20pm On Sep 01, 2023 |
I have been banned for a couple of days by the not on the property section and that's why I am yet to give a project report on the job. To the glory of God, I have delivered the job successfully to site. Installation will be done next weekend. I happen to deliver ahead of schedule and the plaster guys are yet to dress the walls to enable me install |
Re: The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! by michlins(m): 9:23pm On Sep 01, 2023 |
Here are some pictures from the process. The keys when they were fully installed 1 Like
|
Whites Won't Believe This Is What Nigerians Leave Behind For Abroad / Finding Tax Lien Properties / Vineyard Garden As Low As N21,000/month For 500,000
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 21 |