Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi (9596 Views)

Phase One Of Lagos-calabar Highway Will Be Completed In 2025 - Umahi / Lagos-Abidjan Highway Will Be Built With Concrete – Umahi / Dapo Abiodun: Ijebu Ode-Epe Expressway Will Be Ready By Christmas (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Bobloco: 1:15am On Oct 09
The Federal Government has assured that the ongoing construction of the first 47 kilometres of the Lagos-Calabar Coastal Highway will be ready by May 2025.

The Minister of Works, Sen. David Umahi, gave the assurance while inspecting an evacuated but now refilled section of the road that had served as a refuse dumpsite.

Umahi said that the construction company was reliable and would achieve one kilometre of concrete pavement in a day, hence the stipulated duration of the project would still be attained.


According to him, squatters along the corridors of the site will soon be dislodged for failure to comply voluntarily.

The minister said: “I am very happy with the work and people have been asking me that we say this 47 kilometre will be commissioned by May 29, and they are counting months for me, and they are counting months for Hitech.

“But I have no fear about what Hitech is doing. First, it is good quality work, the most difficult aspect of this is settlement of the sand.”

Earlier, the Federal Controller of Works in Lagos, Mrs Olukorede Kesha, explained that evacuation of the refuse dumpsite had slowed down the construction work.

Kesha, however, assured that the impact of the refuse evacuation would be insignificant for the duration of the project.

“This place where we are standing, we encountered a huge deposit of refuse here; As you can see here, the contractor was asked to excavate and evacuate it.

“In some places, we had as deep as five to six meters of refuse, and the place where we are standing now was just at the formation level, so we are still going to fill on top of this.


“So, it’s an additional cost because it was not envisaged. So, this refuse here is going to be evacuated and taken to as far as Epe or Ojota.


“So, we are here to let you see, just the way we have written to you in Abuja to seek your approval for the contractor to start the evacuation so that the work can continue in earnest,” Kesha said.


The News Agency of Nigeria (NAN) reports that the 700km Lagos-Calabar coastal highway project is designed to connect Lagos to Cross River.

The highway will pass through the coastal states of Ogun, Ondo, Delta, Bayelsa, Rivers, and Akwa Ibom, before culminating in Cross River.

The 700km Lagos-Calabar coastal road will be constructed at N15 trillion, and a kilometre of the road will cost four billion naira.

https://www.vanguardngr.com/2024/10/lagos-calabar-highway-will-be-ready-by-may-2025-fg/amp/

12 Likes

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Shadomaan7: 1:17am On Oct 09
Nawa o
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by onome25(m): 1:28am On Oct 09
Shadomaan7:
Nawa o

E shock U bah

This APC regime de drink money like water angry

11 Likes

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Validated: 1:41am On Oct 09
onome25:


E shock U bah

This APC regime de drink money like water angry

47km out 770km hahaha! If it takes two years to build 47km how many years will it take to bound 770km?

24 Likes 1 Share

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Salewa97: 1:46am On Oct 09
Toh

May 2025, we are counting down

19 Likes

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by panpan(m): 3:07am On Oct 09
The headline gives the impression that the whole length of the highway will be ready.
However, the report states that the first 47 kilometres, out of 700 km, will be ready by May 2025.
* * *
The headline has been edited.
"Phase 1" was not stated in the headline at first.

7 Likes

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by azpekuliar: 3:41am On Oct 09
Please go and fix the Warri - Sapele/Benin expressway!

9 Likes 2 Shares

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by tundegan: 3:45am On Oct 09
The 700km Lagos-Calabar highway is going to be a game changer for the South West and South South region.

36 Likes 1 Share

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by vowiski(m): 4:45am On Oct 09
Validated:


47km out 770km hahaha! If it takes two years to build 47km how many years will it take to bound 770km?

This thing no tire you ? And this minister is so excited for a mere 47km in 2 years .. that’s crazy

3 Likes 1 Share

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by yoruboid: 5:09am On Oct 09
vowiski:


This thing no tire you ? And this minister is so excited for a mere 47km in 2 years .. that’s crazy

The otter sections are simultaneously going on

You don’t even know what is going into that road

29 Likes 2 Shares

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by slaawomirr: 5:18am On Oct 09
Damnnn niggar

Scam

4 Likes 2 Shares

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by UselessBuharist: 5:22am On Oct 09
I don’t see Tinubu completing that project even if he rules for 40 years.

He is a monumental failure worse than Buhari

8 Likes 1 Share

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by MartinCorridon: 5:22am On Oct 09
Umahi, Soludo are one of the few people we would consider for Presidency in 2039.

But that's if the " 5% " or " Dot in Circle " tag by Buhari is proven wrong.

Otherwise... you know warram saying ? 🤷‍♂️ undecided

"Biafur0 or death" or some shiit. But no independence, aiit ? Feel me ?

22 Likes 2 Shares

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by MartinCorridon: 5:22am On Oct 09
grin
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Akfrenzy(m): 5:25am On Oct 09
LAMBA 101
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by agabusta: 5:26am On Oct 09
This is good.

Nigerians are one of the most problematic people to govern. You no do, problem. You do, still problem. A lot of them think being a die hard pessimist and everlasting critique is the way.

6 Likes

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by agabusta: 5:28am On Oct 09
MartinCorridon:
Umahi, Soludo are one of the few people we would consider for Presidency in 2039.

But that's if the " 5% " or " Dot in Circle " tag by Buhari is proven wrong.

Otherwise... you know warram saying ? 🤷‍♂️ undecided

Their people will not support them as they are integrating well with other tribes in Nigeria. Those that maintain a confrontational and adversarial style with others are regarded as heroes.

10 Likes

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by jpmoriarti(m): 5:30am On Oct 09
They encountered a refuse dump that wasn't envisaged? Does it mean they didn't conduct any inspection on where the road is expected to be before starting work? They're just conducting inspection as the construction progresses? What else are they gonna discover infront?

This is a recipe for disaster and incompetence.

I have never seen a more unstructured and gross incompetence from this minister of work.

This road will still definitely be abandoned. Nothing so far has shown that visibility studies were conducted on the road ahead of time.

1 Like

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by blowjohn(m): 5:33am On Oct 09
tundegan:
The 700km Lagos-Calabar highway is going to be a game changer for the South West and South South region.


Yes o real game changer!

Ronaldinho will be substituted for Romario!!!!!

1 Like

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Newsmills: 5:34am On Oct 09
Engr Umahi should stop disturbing the peace of people with lagos-calabar coastal highway the phase he promised will start from calabar end i believe the work has commenced.
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by blowjohn(m): 5:35am On Oct 09
yoruboid:


The otter sections are simultaneously going on

You don’t even know what is going into that road

Abi.
He doesn't even know what is going on in the health, education, power and oil sectors.


Las las this project go last longer than Israelites journey
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by omunabo(m): 5:43am On Oct 09
Good development for the people of SW and SS
May God bless the federal Republic of Nigeria
May God bless President Bola Tinubu

1 Like

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by DonEd(m): 5:44am On Oct 09
jpmoriarti:
They encountered a refuse dump that wasn't envisaged? Does it mean they didn't conduct any inspection on where the road is expected to be before starting work? They're just conducting inspection as the construction progresses? What else are they gonna discover infront?

This is a recipe for disaster and incompetence.

I have never seen a more unstructured and gross incompetence from this minister of work.

This road will still definitely be abandoned. Nothing so far has shown that visibility studies were conducted on the road ahead of time.

They didn't perform any form of inspections or assessments. Someone just woke up, thought of the best way to cashout big and boom! The coastal road project...

Bunch of clowns in expensive attires

1 Like

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Niyonice(m): 5:45am On Oct 09
.
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by lonelydora: 5:49am On Oct 09
Dave Umahi, biko stop eroding the integrity you built as governor of Ebonyi because of a morsel of eba and agbado Tinubu is giving you.

I will take Umahi when he completes Warri-Sapele-Benin road which has become a nightmare for travellers.

1 Like 1 Share

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Kobojunkie: 5:52am On Oct 09
Validated:
■ 47km out 770km hahaha! If it takes two years to build 47km how many years will it take to bound 770km?
OMGOSH!!!!🤐🤐🤐🤐🤐🤐🤐🤐🤐🤐🤐
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by nabegibeg: 6:03am On Oct 09
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by highchief1: 6:03am On Oct 09
Bobloco:


https://www.vanguardngr.com/2024/10/lagos-calabar-highway-will-be-ready-by-may-2025-fg/amp/
umahi is a thief and highly over hyped.most of the jobs he did in Ebonyi has failed.what is the rational behind abandoning existing roads and jumping into a fresh one is it to make name or to steal money.I am not understanding
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by wiseoneking: 6:08am On Oct 09
MartinCorridon:
Umahi, Soludo are one of the few people we would consider for Presidency in 2039.

But that's if the " 5% " or " Dot in Circle " tag by Buhari is proven wrong.

Otherwise... you know warram saying ? 🤷‍♂️ undecided

"Biafur0 or death" or some shiit. But no independence, aiit ? Feel me ?
just imagine what an old man like you is writing like a dummy kid. Stop it

2 Likes

Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by Macphenson: 6:14am On Oct 09
Imagine. It is now they are seeing a refuse dump and calling the minister to come and see. This simply points out to one thing, Enviromental Impact Assessment was not carried out before the commencement of that project.

Thats simply a recipe for disaster and shows how level of incompetence for such a huge project. I remember the lady from Arise Tv asking the minister about the EIA and he downplayed the question.
Re: Phase 1 Of Lagos-Calabar Highway Will Be Ready By May 2025 – Umahi by MartinCorridon: 6:14am On Oct 09
wiseoneking:

wiseoneking to his useless homosexual father
just imagine what an old man like you is writing like a dummy kid. Stop it

(1) (2) (3) (Reply)

I Was Invited By The Democratic Party - Tinubu / Ganduje Distributes 381 Okada To Agricultural Workers / Number Of Times Trump Mentioned Biafra In His Inaugural Speech

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 34
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.