Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,193,140 members, 7,949,933 topics. Date: Sunday, 15 September 2024 at 11:57 PM

JMEN's Posts

Nairaland Forum / JMEN's Profile / JMEN's Posts

(1) (of 1 pages)

Career / Re: Addiction To Betting! What Is The Way Out? by JMEN: 7:54am On Mar 29, 2021
Do you know what I did I just don't keep my money in my own account that I can easily use once big money land my account I forward it to my trusted wife account..she doesn't know the reason am saving in her account but certainly is for me not to see money to use for betting.

1 Like

Sports / Re: Betting Is A Curse! Stop. by JMEN: 10:34am On Jan 23, 2021
3LACK:
Coming from a former hardcore betting guru.

I normally don't do this but I think someone needs to hear this.

This is an advice to anyone that may be rethinking starting this shit, to pls flee away(japa) cos this shit is a f*"king devil's scheme to destroy you... I still regret placing my first bet. First it makes you win big, makes you think there's actually an easy-quick way of making money after all, gives you hope and joy and later takes it back after you start loosing, which is inevitable, you start placing much more money, all your savings and later loans which you may think you can win big again and pay back but you won't, getting you into all kinds of trouble, making you sell valuables just to pay back, gaining nothing at long last except sorrows, frustration and regrets. pls never start betting cos it's like nothing you've ever done before... and If you still bet or gamble in any form pls do your best to stop before it's too late.

Remember there's nothing like sure odds in betting and no matter how big you win you will slowly and inevitably loose each and every penny one way or the other.

God be with us.

Betting to some is dangerous to some is a source of income...to me is a huge support to what I do for a living....I read this and was forced to check my online account data and I see for myself that in the last 2yrs I spent 1.1m+ in betting and my winning is 3.4m+ so u see my dear my advice to people who feel bet is a no go area is for you to desist from virtual or any robot game...go for live matches and at interval not as crazy as if you don't have any other business doing...I will also tell stop accumulating much odds and be using 100, 200, to play that can drain you more...most of all if you not lucky in booking please leave betting.

1 Like 1 Share

Politics / Re: Edo Election: Raymond Dokpesi Wins His Polling Unit by JMEN: 8:35pm On Sep 19, 2020
With this PDP winning shortly you will hear inconclusive to enable them solve the mathematics.
Properties / Re: What's The Cost Of Building A Self Contained Apartment Now? by JMEN: 10:21pm On May 08, 2020
Lovelies1:
In your mind do an analysis on this house and guess how much it cost to build cause the owner currently put it for sale it location is at commissioner quarters awka anambra state it's a 5 bedroom bungalow it's for sale own oo but just try an how much he use in building and the amount he wants to sell just guess
Excluding landscape and the land itself and when it was built that house should not be less than 4-5m if it is not more than 3yrs old...so add it to the worth of the land at that location will give him the totally amount for the property for sale.
Properties / Re: Can N30 Million Build A Business Complex? by JMEN: 3:17pm On May 07, 2020
Nickxander11:



This your advert is unethical in the built environment. Are you a structural and M&E engineer too?
This won't take you anywhere except you learn how to package.
A lot of professionals claim to also do what other professionals do which is very BAD.

Maybe you should rephrase your comment to " you are ___________ development consultants which consists of engineers, Architects and Quantity surveyors.you render services like project designs, costing etc.
Sound professional if you want to be jack of all trades if not you will only be beating round the bush and your hustle won't yeild results.
My am not here to fight with you on advertising or whatever am just straight to who asked a question and if he so desire to know more he should use the number to reach me that's all. I run my own office at Onitsha...you don't tell me how to run my office contractors and engineers who knows me advertise for me. so chill am not new and am not online here to advertise with sweet tongues like scammers.
Properties / Re: Can N30 Million Build A Business Complex? by JMEN: 8:12am On May 07, 2020
Am a Quantity surveyor chat me 08033574397 for what you ask 30m can do if land is already there and again depending on the location of the work and how big the shop would be...I have done similar estimate. I also design structures in other words am also an architect.
Properties / Re: 10 Solid Steps To Avoid Losses And Ensure Success On Your Building Project by JMEN: 11:31pm On Apr 18, 2019
Nighouseplans:

If you are planning to embark on your building project, you may be wondering what steps to take. You may intuitively feel like just buying a land, getting a design and start building. Most people who go through this simple 3 step process end up losing money through paying for the wrong land,losing the property or spending more money on the execution stage due to poor planning. To avoid these, below are steps you should consider while planning and executing building project:

Verify land:
Land verification is important should be the first step you take towards actualizing your building project. Without this, you run the risk of purchasing land which is under acquisition or which had been sold to another party hitherto. You will need to do land verification and confirmation. This involves charting which is the process of knowing the acquisition status of the land ( it can be done by the surveyor)and land investigation which can be carried out by your lawyer. The importance of land verification cannot be overemphasized.

Buy land:
After due diligence is done, you can then proceed to purchase the land. Never buy land without verification as many people lose money after realizing the land paid for has legal issues or is under acquisition. Also ensure the relevant documents are issued to you which include receipts,survey, land titles (which may be registered survey,deed of assignment C of O etc )

Survey land:
You will need to carry out a survey on the land. This is done by the surveyor, it carries information such as the address, your name, beacon positions and numbers, land shape and size etc. This defines the extent of your property and is part of the documentation which proves you own the land. It also forms the base information for your building plans to be developed.

Preliminary estimate:
Counting the cost of the proposed building is pivotal to project success. At this stage you may not get the detailed cost but rough cost estimate to guide your decisions in the building you want to construct.

Design Building:
This will involve engaging the services of an Architect and Engineers to design the building to meet your requirements and government regulations. Where your requirements are in contrast to regulations it’s better to adjust project requirements to conform to regulations in order prevent future losses. You can engage the services of an Architect separately from that of the engineers or employ the Architect who in turn employs Engineers. The output of this process is Architecture and Engineering drawings which will be submitted for approval and used for construction. This is the stage where you can save money upfront by having a good design. As a bad design means wastage or rework on site which leads to loss of money.

Apply for building approval:
Before you break ground to start construction, you will need to obtain government approval for your project. This involves submitting 5 sets of sealed and signed drawings (for Lagos state ARCON and COREN paper stamps are a requirement). Other documents such as tax clearance, land title, survey plan etc will also be required. See the approval requirements here.

Develop Cost estimate:
After all drawings are done, there is enough information to develop an accurate cost for the building construction. This is done by the quantity surveyor with a bottom up estimating method where all the individual items are costed and added up to achieve the final cost estimate.

Construct Building:
Now you’re done with all the planning, It’s time to hit the ground running and start executing your project. If you’re using the design and build approach, the design team will proceed to carry out the works. You can also choose a separate contractor after going through a bid process and choosing a contractor who meets your requirements. All should be done to ensure the building is constructed as planned. You should use quality assurance here to ensure success (i.e checking the process and works before they are finished).

Occupy building:
The contractor will hand over your building after project completion. You may start to make use of the building after practical completion (the stage at which the building is habitable). For standard contracts,There is normally a liability period after the building is handed over for the contractor to fix any defects arising as a result of poor workmanship or materials. However this will depend on the nature of your contract especially if it’s a small build. Your contractor may give you maintenance information such as the list of supplier for the various building elements so you will be able to procure same products for maintenance. You may need to employ a party to do a snag list of issues to be corrected by the contractor prior to handover.

Document lessons learnt:
It’s advisable to document all lessons learnt in the course of the project. This will help on subsequent projects you will embark on. You will learn about project management generally (albeit informally) such as scope management, schedule, people management,cost ,procurement etc.

You could also perform a post occupancy evaluation which is the process determining how successful the delivery of the project was, if there is potential for further improvement and what lessons can be learned for future projects.

While the building process may seem daunting, experimenting is not the way to go if you want to make your project successful. The steps above will ensure proper planning for your project which greatly reduces the risks thereby ensuring success.

Wishing you the best on your project. Thank You.

https://nigerianhouseplans.com/10-solid-steps-to-avoid-losses-and-ensure-success-on-your-building-project/

Contact me for your Building cost estimate, I can offer you the services no matter where you are. 08033574397
Romance / Re: Pre-Wedding Photos Of Couple Who Met On Facebook by JMEN: 2:06pm On Nov 22, 2018
I wonder why standing is bit difficult for the lady.... tuwale for the new recruit body guard
Politics / Re: Atiku Must Pick Vice From South-West Or… – PDP Chieftain by JMEN: 6:17pm On Oct 08, 2018
ORIENTATION101:
open eyes and see pdp has schemed yorubas out of the party.wike told our leaders to go to hell when it was the turn to produce chairman.if south west eventually vote for atiku south south and east will take over his govt and yorubas will be reduced to mere followers of the party.
a vote for buhari is vote for osibanjo and fashola.
pdp did nothing for yorubas from 1999 till date. the infrastructures we enjoy re done by our governors.
apc has embarked on big infrastructural projects that will be delivered by december and first quarter of 2019.
dont allow igbos to blackmail us to vote pdp that did nothing for us

OBJ which Party did he wasted his time with?? which zone is he from for complete 8yrs... infact you are on drugs

4 Likes

Politics / Re: Bribing Of Delegates In Full Swing At PDP Convention. $1k And 5k Each by JMEN: 5:26pm On Oct 06, 2018
hmmm next 3yrs am joining politics I dream to be a delegate too.... see money!!!!

2 Likes

Properties / Re: How Much It Will Cost Me To Build 3 Bedroom by JMEN: 8:48am On Jan 17, 2017
meet a quantity surveyor he will take care of all your needs relating cost or send the complete drawings to my email eduputajoseph@gmail.com, I will break down all the cost analysis for you or call 08033574397 for further information. Am a quantity surveyor.
Properties / Re: Cost To Supervise A Foundation Of 2storey Building Of 6flats by JMEN: 9:23pm On Jan 08, 2017
meet a quantity surveyor to to give you near estimate or your contact me 08033574397 am also one.
Jobs/Vacancies / Re: Have You Been Able To Apply For DPR Graduate Trainee? Share Your Experience. by JMEN: 10:14am On Dec 05, 2016
maxwell767:
mine was successful, was on it through out last night......

ur documents must be PDF format. wink


FTC..

grin
what is the total Kb of your documents because mine is 90kb each yet not going through why
Jobs/Vacancies / Re: Have You Been Able To Apply For DPR Graduate Trainee? Share Your Experience. by JMEN: 10:12am On Dec 05, 2016
profeoo:
Thanks for giving us something to hang onto
I don't understand
Jobs/Vacancies / Re: Have You Been Able To Apply For DPR Graduate Trainee? Share Your Experience. by JMEN: 10:09am On Dec 05, 2016
I have shrink the doc to 90kb each yet not going through why?

(1) (of 1 pages)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.