Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by klenz77: 11:27am On Aug 06, 2017
johnson232:

I doubt at the bold sir....
I think it is safer for an engineer to estimate the bold at 2tones each, making it 4 tones.

Also 0.5tone for 10mm would be nice if it can just go for 1tone

Reinforcement makes a duplex different from a bungalow...

What inflated the quote was the 8mm rods...don't know his reasons for that.
Negotiating the
16mm 2.5tones to 2tones
12mm already 2 tones
10mm 2tones to 1tons.
Would have been a good one for me ooo
Iron bender labour to me was cool....Some even charge as high as 200k
But just wanted to see if d guy could beat it down to 120k

Thank you very much Johnson232.
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by klenz77: 10:53am On Aug 06, 2017
akinolaolujide:
m
Sent you a mail.

I did not get the message, you can resend it.
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by klenz77: 9:31am On Aug 06, 2017
akinolaolujide:

The quote is way off the mark get a second opinion u shudnt be using more than 3.5 tone of reinforcement in total for the project All the best sir.

Thank you very much. I would do just that
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by klenz77: 11:35pm On Aug 05, 2017
bixton:

Bro I don't know anybody who even given you a quote based on what you posted here. Can you try post the structural plan having its dimensions (Lenght and with,etc,etc,etc).
Be kind to also put up the estimate given to you as a check list.

The dimension of the building is 23,190mm by 9,300mm (175.4 Sqm) this house is relatively small hence my doubt.
His total rebar quantities are:

2.5 tonnes of 16mm @ 160k par tonne = 400k
4 tonnes of 12mm @ same price = 640k
2 tonnes of 10 mm @ same price = 320k
3/4 tonnes of 8mm @ same price = 120k
Labour 150k
Total ==== N1,630,000 for Rebars alone oooo

well, I just collected the quotation yesterday and too vex to even call him for any negotiation.
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by klenz77: 11:34pm On Aug 05, 2017
Aventures:
Not sure most builders will be generous enough to answer this your question, why not tell us the qty your builder quoted then you will get epic responses from experience of builders and other house members


Thank you Aventures,
The dimension of the building is 23,190mm by 9,300mm (175.4 Sqm) this house is relatively small hence my doubt.
His total rebar quantities are:

2.5 tonnes of 16mm @ 160k par tonne = 400k
4 tonnes of 12mm @ same price = 640k
2 tonnes of 10 mm @ same price = 320k
3/4 tonnes of 8mm @ same price = 120k
Labour 150k
Total ==== N1,630,000 for Rebars alone oooo

well, I just collected the quotation yesterday and too vex to even call him for any negotiation.
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by klenz77: 3:22pm On Aug 05, 2017
Hello House,
please I need urgent help here before making a decision, my builder is giving me a ridiculous estimate of reinforcement rods for my decking/slab.
I would be glad if anybody can help to calculate the total rods required ( find drawing below). I equally need to ask if Y10 are used for slabs as my drawing is detailing this. thank you

Properties / Re: Construction Of Six Bedroom Duplex At Enugu by klenz77: 2:05am On Mar 31, 2017
podosci:

A lintel is an element used to span over openings like doors and windoows with the main fucntion of carrying the blockwork above that opening.
Lintels are of different forms, we have
-Timber lintel
-I section lintel
-Reinforced concrete beam
For this project and for most buildings in Nigeria( except timber buildings) , a Reinforced concrete beam is the most suitable choise.
Since its a reinfroced concrete beam, Every criteria governing design and construction of reinforced concrete elements given by BS8110 must be satisfied.
As you must have observed, We chained the lintel round the building.
We did so for two main reasons.
- To give the building extra structural rigidity

klenz77 post=55117950:

If I way ask, what structural implication would I be exposed to should I use 4Y10 rebar for my lintel reenforcement. because i do understand that Lintel bear just a tiny fraction of dead load of just the 2 coaches of block.

- To make renovation of the building by our clients easy.
Properties / Re: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by klenz77: 10:36pm On Mar 11, 2017
Pchinak:


I don't understand this response boss, thought those are the ones you paid N500/bag, or was your answer to his question "Yes", then a further information on possible increase in price? I guess someone was doing the " levelling", was he part of this money?

Can this payment module also be used for suspension slabs?

(1) (of 1 pages)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 16
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.