Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,177,689 members, 7,902,171 topics. Date: Saturday, 27 July 2024 at 12:22 AM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (2218) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4592034 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (2215) (2216) (2217) (2218) (2219) (2220) (2221) ... (3723) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gabbytabby: 11:56am On May 24, 2021
Mama's type
3.5kva.... 200000
Battery
200AH x4
120x4....480000
Wiring materials
10000
Installation and Workmanship
50000

For those who know a thing or 2 about inverters is this a good deal for 700k How does one check that one is receiving the right package.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gabbytabby: 12:00pm On May 24, 2021
Mama's type
3.5kva.... 200000
Battery
200AH x4
120x4....480000
Wiring materials
10000
Installation and Workmanship
50000

Capacity
Pumping machine
Fridge /freezer
Electronics appliances

For those who know a thing or 2 about inverters is this a good deal for 700k How does one check that one is receiving the right package.

1 Like 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by MrDraey(m): 12:19pm On May 24, 2021
MrDraey:
Good day all,

Please can 1m take a 2bedroom bungalow from foundation to finishing of block work (2bed, two toilet, dining and kitchen)?

Note; No German floor, the land is a 50 x 50 ft, flat ground and not water logged.
Good day all, please i was given this quotation. I'd like you guys to help me take a look at it and advise

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gabbytabby: 12:53pm On May 24, 2021
I am also looking at the option of
1) 4kva . 48v inverter
2) 3×220ah batteries with the option to add another battery in future if needed
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Naijapal: 1:22pm On May 24, 2021
gabbytabby:
I am also looking at the option of
1) 4kva . 48v inverter
2) 3×220ah batteries with the option to add another battery in future if needed

You can't use 3 battery (12V) in a 48V setup.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DFAMEGUY11S(m): 2:42pm On May 24, 2021
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by samoranononi(m): 2:56pm On May 24, 2021
Engineers in the house. I gave someone a job of doing architectural design of 3 beds for me and when he delivered the job. I noticed he put two exist doors apart from main entrance. One exit from the kitchen and the other at the Dinning.
Please help
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 3:15pm On May 24, 2021
samoranononi:
Engineers in the house. I gave someone a job of doing architectural design of 3 beds for me and when he delivered the job. I noticed he put two exist doors apart from main entrance. One exit from the kitchen and the other at the Dinning.
Please help
where is the design?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gabbytabby: 3:29pm On May 24, 2021
Naijapal:


You can't use 3 battery (12V) in a 48V setup.
I take it it has to be 4.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by InvertedHammer: 3:37pm On May 24, 2021
EgunMogaji2:


This is one of the benefits of my metalwork hobby. I can visualize and apply myself directly without any artisan telling me that it can’t be done or this is how we’ve always done it.
/
See DIYer! Good job bro.

I have three industrial welding machines but the wahala na to sit down one place no gree me.

/

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by InvertedHammer: 3:46pm On May 24, 2021
spyder880:
Prices of iron rods in Asaba this morning

16mm N6,800 each length
12mm N3,900 each length
8mm N1,900 each length
Roll of binding wire 20kg N12,000

Nigeria is getting better grin
/
This must be a joke. Or better be.

E don reach when owners go begin carry machete dey supervise iron benders.

/

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by EgunMogaji2: 3:50pm On May 24, 2021
InvertedHammer:

/
See DIYer! Good job bro.

I have three industrial welding machines but the wahala na to sit down one place no gree me.

/

Welding is serious risky business. Only weld when you’re 100%.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by InvertedHammer: 3:52pm On May 24, 2021
EgunMogaji2:


Welding is serious risky business. Only weld when you’re 100%.
/
I have all the gears from Home Depot.
I need to check out that self-dimming helmet.

/

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by stanley000: 4:13pm On May 24, 2021
samoranononi:
Engineers in the house. I gave someone a job of doing architectural design of 3 beds for me and when he delivered the job. I noticed he put two exist doors apart from main entrance. One exit from the kitchen and the other at the Dinning.
Please help
u didn't post the design then how can we help ?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ArcToyin(m): 4:14pm On May 24, 2021
debeey87:
Happy Sunday to everyone. I'll appreciate an evaluation/review and recommendation on this floor plan for the first floor.

Thank you

The image is not clearer. What i can pick out is lobby. It will be dark during the day.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by stanley000: 4:26pm On May 24, 2021
ArcToyin:


The image is not clearer. What i can pick out is lobby. It will be dark during the day.
hope its not being designed for approval purpose oh coz the design is flawed.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by uncleteeh(m): 4:51pm On May 24, 2021
samoranononi:
Engineers in the house. I gave someone a job of doing architectural design of 3 beds for me and when he delivered the job. I noticed he put two exist doors apart from main entrance. One exit from the kitchen and the other at the Dinning.
Please help
You may delete the exit from the dinning.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 6:01pm On May 24, 2021
InvertedHammer:

/
See DIYer! Good job bro.

I have three industrial welding machines but the wahala na to sit down one place no gree me.

/
sell one machine give me boss. Me be looking for upgraded tools like this with shikini money sha cool cool cool
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 7:24pm On May 24, 2021

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by erico2k2(m): 8:04pm On May 24, 2021
gabbytabby:
I am also looking at the option of
1) 4kva . 48v inverter
2) 3×220ah batteries with the option to add another battery in future if needed
is this to store power frm Electricity or solar?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 8:15pm On May 24, 2021
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sinorte: 8:43pm On May 24, 2021
Please I need suggestions and advice on any suitable submersible pump that I can use to pump water from a borehole to a 25ft level above the surface.

The power rating, brand and cost will suffice.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by neduboo(m): 8:54pm On May 24, 2021
1 tonne of 12 mm rod in Lagos is #380k as at today.

I went to my vendor shop to buy and when he gave me the price, within my mind I felt he wanted to cheat me and we quarreled a bit before i angrily left his shop only for me to go to another vendor and they quoted me #385k last. I left there and went to another place and I was told #380k last price.

Shame couldn't make me go back to the initial vendor who has been my supplier since the inception of my project. Little did I know he was giving me the actual price. I had to later buy from the third person because I felt guilty of quarreling with my supplier and didn't have the energy going back to his shop.

God help this country with the way price of material is increasing. This same 1 tonne 12 mm rod was less than 200k as at October 2020.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by somehow: 9:00pm On May 24, 2021
neduboo:
1 tonne of 12 mm rod in Lagos is #380k as at today.

I went to my vendor shop to buy and when he gave me the price, within my mind I felt he wanted to cheat me and we quarreled a bit before i angrily left his shop only for me to go to another vendor and they quoted me #385k last. I left there and went to another place and I was told #380k last price.

Shame couldn't make me go back to the initial vendor who has been my supplier since the inception of my project. Little did I know he was giving me the actual price. I had to later buy from the third person because I felt guilty of quarreling with my supplier and didn't have the energy going back to his shop.

God help this country with the way price of material is increasing. This same 1 tonne 12 mm rod was less than 200k as at October 2020.

Meaning price is about doing 100% within 8 months?

What exactly is driving the cost with speed is what I am trying to understand.

Is it that the process of manufacturing these rods is now more complex or what exactly is what I don't get.

Price doubling within 8 months is alarming.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ben1daEbiri(m): 9:20pm On May 24, 2021
sinorte:
Please I need suggestions and advice on any suitable submersible pump that I can use to pump water from a borehole to a 25ft level above the surface.

The power rating, brand and cost will suffice.

Don't really have a favourite brand but the power of the sumo shouldn't be less than 1.5hp
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by neduboo(m): 9:42pm On May 24, 2021
somehow:
Meaning price is about doing 100% within 8 months?

What exactly is driving the cost with speed is what I am trying to understand.

Is it that the process of manufacturing these rods is now more complex or what exactly is what I don't get.

Price doubling within 8 months is alarming.

I really don't know why exactly. The annoying thing is that the rods diameter is no more complete 12mm. Even 16mm rod diameter isn't complete 16mm
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by neduboo(m): 9:44pm On May 24, 2021
sinorte:
Please I need suggestions and advice on any suitable submersible pump that I can use to pump water from a borehole to a 25ft level above the surface.

The power rating, brand and cost will suffice.

I installed 0.75hp semi submersible pump for my borehole and it fills up my 1000 liters within 12 mins
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by somehow: 9:47pm On May 24, 2021
neduboo:


I really don't know why exactly. The annoying thing is that the rods diameter is no more complete 12mm. Even 16mm rod diameter isn't complete 16mm

Which is wickedness.

You're increasing the price but reducing the quality.

Pure wickedness!
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by somehow: 9:48pm On May 24, 2021
neduboo:


I installed 0.75hp semi submersible pump for my borehole and it fills up my 1000 liters within 12 mins

Within 12 minutes? [quote][/quote]

Nice one.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by toyeoye(m): 10:00pm On May 24, 2021
neduboo:
1 tonne of 12 mm rod in Lagos is #380k as at today.

I went to my vendor shop to buy and when he gave me the price, within my mind I felt he wanted to cheat me and we quarreled a bit before i angrily left his shop only for me to go to another vendor and they quoted me #385k last. I left there and went to another place and I was told #380k last price.

Shame couldn't make me go back to the initial vendor who has been my supplier since the inception of my project. Little did I know he was giving me the actual price. I had to later buy from the third person because I felt guilty of quarreling with my supplier and didn't have the energy going back to his shop.

God help this country with the way price of material is increasing. This same 1 tonne 12 mm rod was less than 200k as at October 2020.


Na market and I'm sure he has faced a lot i
of quarrel with his customers for same reason...you should have gone back to patronise him, no hard feelings at all. Naija is getting harder

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 11:55pm On May 24, 2021
neduboo:
1 tonne of 12 mm rod in Lagos is #380k as at today.

I went to my vendor shop to buy and when he gave me the price, within my mind I felt he wanted to cheat me and we quarreled a bit before i angrily left his shop only for me to go to another vendor and they quoted me #385k last. I left there and went to another place and I was told #380k last price.

Shame couldn't make me go back to the initial vendor who has been my supplier since the inception of my project. Little did I know he was giving me the actual price. I had to later buy from the third person because I felt guilty of quarreling with my supplier and didn't have the energy going back to his shop.

God help this country with the way price of material is increasing. This same 1 tonne 12 mm rod was less than 200k as at October 2020.

please oga mi and everyone else reading this,if I give you a quotation and you angrily quarrel with me, kindly come back when you verify that I am not cheating you. Don't let shame make you give another person the money you're supposed to give me. It's not your fault for getting angry neither is it my fault for charging so high.

somehow:
Meaning price is about doing 100% within 8 months?

What exactly is driving the cost with speed is what I am trying to understand.

Is it that the process of manufacturing these rods is now more complex or what exactly is what I don't get.

Price doubling within 8 months is alarming.
My charges have doubled in less than eight months as you pointed out. Someone contacted me some days ago about a standing tank. Gave him the current price and he was almost freaked out. He was like, how can the prices double already. 6 by 3 H channel I buy 65,000 before, but I paid 95,000 with lots of begging for 5 by 3 on Saturday after making a quotation with 90,000 two weeks ago

2 Likes

(1) (2) (3) ... (2215) (2216) (2217) (2218) (2219) (2220) (2221) ... (3723) (Reply)

Viewing this topic: Blessedsunny2(m) and 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 51
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.