Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,207,760 members, 8,000,211 topics. Date: Tuesday, 12 November 2024 at 04:36 AM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (2403) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4820028 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (2400) (2401) (2402) (2403) (2404) (2405) (2406) ... (3776) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 12:06pm On Aug 24, 2021
gbadexy:
@ michlins, would it be possible for you to modify and add the pipes on site to give the extra dimension.
that job can't be modified at all. There's no way to modify that job at all

1 Like 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 12:12pm On Aug 24, 2021
Itsrm:


You are only repeating what he himself has acknowledged here. Emphasis on the bolded

See quote below


Where I fault him is he didn't just add the pipes or do whatever it takes to get the exact dimension he was told to make


To be honest, I didn’t see that comment.

This means the client is not at fault. If I give you money to buy me a 3ft door, I expect a 3ft door and not something less.

The explanation given won’t fly with me because I understand what’s at play. The vendor is trying to reduce offcuts/wastages on the job which is fine but I shouldn’t be made to pay for that.

I do give my workers instruction not to cut my plywood but I won’t tell them to reduce the decking size because I don’t want to use more boards. I provide them alternatives to use when I want to minimize wastages.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by kiekie1(m): 12:17pm On Aug 24, 2021
HURRY!

270w mono solar panel ... 56,000
350w mono solar panel ... 70,000

Pro solar roof mount set (comfortably takes 4 units of 300 - 550w panels) ... 35,000

Jsol 270w mono ........ 58,000
Upsolar 280 mono ... 60,000
JA 375w mono .......... 79,000
Jinko 375w mono ..... 82,000
Jinko 450w mono ..... 98,000
Jinko 535w mono ..... 120,000


Contact,
Smartcell global services
CALL LINE: 081-350-31951
WHATSAPP::: http://.us/w/?c=a46ea5

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PAPAFEELERS: 12:17pm On Aug 24, 2021
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 12:25pm On Aug 24, 2021
michlins:
please sir, that's how doors are made. Even the prefabricated doors are smaller.

Here's how it goes. A sheet of pan is 8ft and when divided by four gives you 2ft plus 3" of the pipes. That's 30" then you add frames which is usually 1.5" on both sides. That's a total of 33".

This is the way it works. If you want to expand the size, you will have to add pipes in-between to increase it.

These things are like this anywhere and everywhere
Bro seriously, anybody not in this ur field or not conversant with them won't be able to understand ur point.
It took me a while to get ur point.
It's not ur fault neither was it madams fault. But find a way to settle this matter, you can involve a 3rd party on your behalf to calm @enyinne nerve.
If na me I no go dey happy at all. Even if she insults you, you don't have to insult her back, your only priority now should be to settle this matter and clear your name.
@enyinne abeg tamper justice with mercy mbok.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Itsrm(m): 12:26pm On Aug 24, 2021
n3xt:


To be honest, I didn’t see that comment.

This means the client is not at fault. If I give you money to buy me a 3ft door, I expect a 3ft door and not something less.

The explanation given won’t fly with me because I understand what’s at play. The vendor is trying to reduce offcuts/wastages on the job which is fine but I shouldn’t be made to pay for that.

I do give my workers instruction not to cut my plywood but I won’t tell them to reduce the decking size because I don’t want to use more boards. I provide them alternatives to use when I want to minimize wastages.



I agree with this. Assumptions were made by the vendor.

Like my former boss will always say, assumption is the mother of all fvck ups

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by EgunMogaji2: 12:46pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy

I’ve never dealt with this here in Nigeria so I’ll defer to my other Ogas for local content.

However I do know that you don’t want to pour just anything in there as you don’t want to kill the organisms in there that breaks down the waste.

Good luck Sir.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gbadexy(m): 12:49pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy
No idea sir.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Horlardorjah(m): 12:50pm On Aug 24, 2021
bobkezel:

Bro seriously, anybody not in this ur field or not conversant with them won't be able to understand ur point.
It took me a while to get ur point.
It's not ur fault neither was it madams fault. But find a way to settle this matter, you can involve a 3rd party on your behalf to calm @enyinne nerve.
If na me I no go dey happy at all. Even if she insults you, you don't have to insult her back, your only priority now should be to settle this matter and clear your name.
@enyinne abeg tamper justice with mercy mbok.


You not getting it, it's even wrong for an engineer to create an opening of 900mm when the door specification is also 900mm,
That is the principle that makes all engineers allow tolerance of an inch or more to allow for proper installation for either doors n Windows.
So it's wrong to even reduce the size of the door he is fabricating except he was told or he measured the as-built n the opening itself is 900mm already.
I will not accept the door as well but let's acknowledge that it has happened n only him can still make this go away ASAP by he said he won't let his self esteem or so down n that's where there is issue.
I will suggest to him to always prepare a drawing or detailed sketch for doors n some other things he does to avoid more occurence.
Lot of learning still has to be done when you are dealing with clients that knows what they want

6 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 1:01pm On Aug 24, 2021
michlins:
the same clearance is the matter here. It's 1.5" on both sides.

Apologies let me ask you this question.......

I can see that from the client's post of the door sent as mounted on the provided space the mortar chalking space is about 2-3" on the left side and on the right it's lapping on the wall.
Please can you help read the dimension on the tape as shown on the pix as to where the door ends on it............
Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 1:06pm On Aug 24, 2021
yungmin:


You quoted and unquoted a document lol. I have done 75meters without expansion joint. More so, as the structural designer, I can decide to remove expansion joint and then apply the estimated temperature variation as a load in the structural analysis.

I cited it for reference.

I also had to quickly agree that there’s a new research which nullified the initial claim.

grin grin

#GiGo

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by yungmin: 1:11pm On Aug 24, 2021
n3xt:


I cited it for reference.

I also had to quickly agree that there’s a new research which nullified the initial claim.

grin grin

#GiGo

grin grin
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Kambols95(m): 1:12pm On Aug 24, 2021
Contact Mak Designs & Consult for your:

Architectural Designs
Structural Designs
Supply of Building materials e.g Granite
Health and Safety plan
Construction Programs (Program of work)
Buildability and Maintenability Plan
Government Approvals
Survey Plans
Bill of Quantities/ Builder's Estimate
Supervision of Building Projects

For more enquiry: 08...0....376.....418...14

You can give us a trial today and your project work would be given an excellent touch
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 1:13pm On Aug 24, 2021
bixton:


Apologies let me ask you this question.......

I can see that from the client's post of the door sent as mounted on the provided space the mortar chalking space is about 2-3" on the left side and on the right it's lapping on the wall.
Please can you help read the dimension on the tape as shown on the pix as to where the door ends on it............
Thanks
that should be 33" and 3ft is 36". That leaves a difference of 3" which is 1.5" on each side.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 1:34pm On Aug 24, 2021
Horlardorjah:



You not getting it, it's even wrong for an engineer to create an opening of 900mm when the door specification is also 900mm,
That is the principle that makes all engineers allow tolerance of an inch or more to allow for proper installation for either doors n Windows.
So it's wrong to even reduce the size of the door he is fabricating except he was told or he measured the as-built n the opening itself is 900mm already.
I will not accept the door as well but let's acknowledge that it has happened n only him can still make this go away ASAP by he said he won't let his self esteem or so down n that's where there is issue.
I will suggest to him to always prepare a drawing or detailed sketch for doors n some other things he does to avoid more occurence.
Lot of learning still has to be done when you are dealing with clients that knows what they want
We are still learning, even though he is good at what he does he is still learning.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 1:35pm On Aug 24, 2021
michlins:
that should be 33" and 3ft is 36". That leaves a difference of 3" which is 1.5" on each side.


Please try and do a closure on this matter with the client offline.
It's well.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Enyinne(f): 1:37pm On Aug 24, 2021
bobkezel:

Bro seriously, anybody not in this ur field or not conversant with them won't be able to understand ur point.
It took me a while to get ur point.
It's not ur fault neither was it madams fault. But find a way to settle this matter, you can involve a 3rd party on your behalf to calm @enyinne nerve.
If na me I no go dey happy at all. Even if she insults you, you don't have to insult her back, your only priority now should be to settle this matter and clear your name.
@enyinne abeg tamper justice with mercy mbok.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jabolo(m): 1:40pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy

Like someone said, it's not recommended to tamper with the chemistry. The soakaway is working as it should.

Apart from changing the occupants' food diet (lol), what I would do if this was mine is to find a way to source and then place activated carbon filters around the vent. Something like this (dunno if you can find in Nigeria) ....

https://www.amazon.co.uk/Activated-Carbon-Odour-Filter-Joseph/dp/B07XLP7RKG/

This will involve a mini-project to design a fitment or box around the vent that keeps the filter dry during rainy conditions.

Also note that they are to be replaced periodically, once saturated (you will notice when smell reappears). Interval depends on the, ahem, occupants' diet.

Good luck.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by micgray100(m): 1:45pm On Aug 24, 2021
UPDATE ON THE ABANDONED BOREHOLE PROJECT BETWEEN MICGRAY100 AND TWINSKENNY COMING SOON...

HINT: The project is still abandoned as today 24th August, 2021.... More details coming

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 1:46pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy


I dont know of any but as a child I was told salt does many wonders.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by kiekie1(m): 1:49pm On Aug 24, 2021
HURRY! DISTILLED WATER & ELECTROLYTES FOR SALE!!

We still set the pace the lead in distilled water production  with the quality of our distilled water..

We are still committed to giving you the best quality of distilled water in the industry..

With the commitment we have to excellence in water distillation we have been able to keep existing clients, along bringside bringing new clients on board.

We look forward to working with you also to ensure excellence in your maintenance delivery.

Our results continually speaks for us.
Resistance 0.0 (Inference- No mineral Content)
Capacitance 1.3 (Inference-Negligible Chemical composition)

Distilled water sold at #6000 (1L×12 pack)

Distilled water sold at #7000 (with free 25L Gallon)

Electrolyte at #8000 (with free 25L Gallon)


Further discount applies only to distributors with purchases above 500Litres.

Contact,
Smartcell global services
CALL LINE:: 081-350-31951
WHATSAPP::: http://.us/w/?c=a46ea5

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gbadexy(m): 2:20pm On Aug 24, 2021
jabolo:


Like someone said, it's not recommended to tamper with the chemistry. The soakaway is working as it should.

Apart from changing the occupants' food diet (lol), what I would do if this was mine is to find a way to source and then place activated carbon filters around the vent. Something like this (dunno if you can find in Nigeria) ....

https://www.amazon.co.uk/Activated-Carbon-Odour-Filter-Joseph/dp/B07XLP7RKG/

This will involve a mini-project to design a fitment or box around the vent that keeps the filter dry during rainy conditions.

Also note that they are to be replaced periodically, once saturated (you will notice when smell reappears). Interval depends on the, ahem, occupants' diet.

Good luck.

Activated carbon would definitely absorb and lock up the gases given off in the soakaway sir.
If this product can be sourced and fixed, it would work.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 2:23pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.


Block the vent on the septic tank and get your plumber to run another vent to a safe place outside your fence or on the roof. Any space higher than the roof will keep the smell away.

4 Likes 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by diordaves(m): 2:29pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy

#. You can pour in baking soda and vinegar to kill the odour for some months or even year(s).

You can clean the vent pipe on the inside. It is possible the vent is a bit blocked causing not enough air inlet into the soakaway to aid the breakdown of enzymes. Just like cars; if your spark plugs have issues, your car will smoke.

#. You can use a P-Trap for the vent pipe instead of the normal one and pour water into it. The water prevents the odour from coming out. See attached photo.

#. I guess the soakaway is built wrongly. Both toilet waste and kitchen/bathroom waste should not go into one chamber. This causes steam up during hot weather leading to smell. If your toilet waste is going into a dedicated chamber, seal the vent. You will be fine. But then, the odour will now come out in the toilet wash hand basin and even kitchen sink. If this happens, use a P-Trap connection. See attached photo. The water in the U area of the P-Trap prevents the odour from coming out just like your WC.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 2:35pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy

A client back then introduced a 5inch pipe vent on to of the soakaway… so the air from the soakaway can filter away
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:25pm On Aug 24, 2021
PAPAFEELERS:
Good day All and trust your day is progressing well.

Please what can one add to a soakway to douse the odor emanating from it? the soakaway is not full just to make it clear but the odor comes out from the vent ontop of the soakaway.

I am wondering if there are chemicals or freshners that can be placed in the soakaway or vent to douse the order?

We learn everyday and the knowledge shared will be beneficial to the society.

Cc: NEXT, Spyder,Rottech, abdulswastexc,Egunsbaba,Twinskenny,Gbadexy
Hydrogen peroxide and baking soda, pour it inside the soak-away
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Enyinne(f): 3:39pm On Aug 24, 2021
grin

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Horlardorjah(m): 3:43pm On Aug 24, 2021
bobkezel:

We are still learning, even though he is good at what he does he is still learning.

Yes oh, we all are still learning.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Freciprocal: 3:45pm On Aug 24, 2021
@michlins sorry to say... You goofed on this one

She asked for something with specifications. You did not deliver to her specifications.

She had conversations with you which you could have managed properly... You still did not do that.

She was angry (I myself would) and said unprintable things to you... What did you do in response? Talk back at your client.

I have been one of your number one fan here from your day one when people thought you were a middle man and had no faith in you.

This is what I would love you to do. (If you would listen)

Ask the client what she would like you to do to remedy the situation. When she does. Please do it.... Don't see it as a loss, see it as a way to grow

Madam Eyinne, please forgive him and find a way forward. Dont out of anger spend another 300k... It would be double painful.

4 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Valuepaints20(m): 4:25pm On Aug 24, 2021
diordaves:


There are clients that are bad market. This you should know. So to filter out bad market, next time these are processes you should carry out before moving to site:

#1. If the client is from Nairaland, look up for how long they've been on Nairaland. If they've been on Nairaland for a good length of time, take some comfort in that. Good information about their personality will be here on Nairaland by their posts and the forums they frequently visit. Be wary of those who register today, today to contact you for work. Just be wary. It doesn't mean this is not possible. Just be wary because you don't know jack about them. ALWAYS research your client upfront before accepting any job. Ask them for their name. I will come to 'name' again in point three.

#2. Be attentive to the way they address you or talk to you in messages. Be wary if they are unduly and unnecessarily harsh in their communication to you. As if they are doing you a favour. It is not a favour. It is a working relationship. Yes, you are soliciting for work, but you have a right to be addressed with some respect and kindness. All that ORDER to come to site or forget the job is not necessary. It is a tell-tale sign of a tortuous job and a potentially difficult client going forward. And there are difficult clients out there. I speak as a client.

#3. ALWAYS ask for a mobilization fee BEFORE moving to site. This is standard and good practice. Any client that argues with this na bad market. Move on. I have said previously in researching the client you should ask for their name. If you ask for a mobilization fee and they agreed, make sure payment is by bank transfer and that the payment account details match with the name the client told you. If the bank details don't match for some reason (maybe the client is abroad and they don't have a Nigerian bank account), ask more questions about who made the payment and ask to communicate with whoever made the payment. Your client should KNOW you in true colour and same as you.

Don't be desperate to please to land a job. On the flip side, if a client asked you to come to a site that is so far away for investigation or consultation with a potential view of awarding you the job, ask for a reasonable non-refundable fee in lieu of the cost of visiting the site and tell the client that this fee is non-refundable if you do not get the job eventually but if you got the job, this fee is included in the final fee.


Kudos to you sir I have really learn a lot from this write up from the start to the end points thank you very much.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by adewaleID: 4:35pm On Aug 24, 2021
Hope you guys are still using @Adedward for your windows and Aluminum. You will always be in safe hands with him.

No stress job from him as usual.

2 Likes 1 Share

(1) (2) (3) ... (2400) (2401) (2402) (2403) (2404) (2405) (2406) ... (3776) (Reply)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 79
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.