(1) (2) (3) ... (23) (24) (25) (26) (27) (28) (29) ... (46) (Reply) (Go Down)

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:39pm On Oct 28, 2021
michlins:
Are you furnishing this house?

Of course, some of the furniture are already in the site.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by joyousmother2016: 10:50pm On Oct 28, 2021
spyder880:
More painting going on in more rooms.........

is this Stucco paint? What colour of paint is this? Its so beautiful.
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:58pm On Oct 28, 2021
joyousmother2016:


is this Stucco paint? What colour of paint is this? Its so beautiful.

This is just silk paints, white colour.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by joyousmother2016: 4:35pm On Oct 29, 2021
spyder880:


This is just silk paints, white colour.

Its so beautiful.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:51pm On Oct 29, 2021
joyousmother2016:


Its so beautiful.

Thank you.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:52pm On Oct 29, 2021
From the water works department today.........

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:13pm On Oct 29, 2021
To the swimming pool department

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:24pm On Oct 29, 2021
Our plan is to slope this swimming pool from the shallow end to the deep end. The shallow end will be 1 metre deep, while the deep end will be 2 metres deep.

This swimming pool as at now is 6.2 metres in length, and 2.9 metres wide. But it will get narrower as we do more work on it.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 8:48pm On Oct 29, 2021
spyder880:


This is just silk paints, white colour.

is this better than stucco paints?

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 9:00pm On Oct 29, 2021
donforeign:


is this better than stucco paints?

Depending on who owns the house. None is really better, owners choice rules in all these things.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 9:04pm On Oct 29, 2021
Confirming the depths.......

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 1:00am On Oct 30, 2021
spyder880:


Depending on who owns the house. None is really better, owners choice rules in all these things.

which is more expensive?
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 3:45am On Oct 30, 2021
donforeign:


which is more expensive?

I think stucco should be more expensive.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:10am On Oct 31, 2021
Fitting ceiling lights............

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:13am On Oct 31, 2021
Painting walls still ongoing, we ran out of paints, waiting for supply now.........

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:17am On Oct 31, 2021
Master bedroom.......

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:20am On Oct 31, 2021
More bedrooms.......

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:22am On Oct 31, 2021
Bringing in our new fittings........

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:25am On Oct 31, 2021
Fitting light switches and sockets.........

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:32am On Oct 31, 2021
Borehole works ongoing........

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:35am On Oct 31, 2021
Starting block laying inside the swimming pool, this is done to keep the surrounding earth at bay while we work in the centre.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:35am On Oct 31, 2021
Closer on the lights and sockets............

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:35am On Oct 31, 2021
More

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by matify83: 1:28pm On Oct 31, 2021
Impressively gracious!!

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by ceelog(m): 1:58pm On Oct 31, 2021
Well done Spyder
Always impressed with your work and I am sure the client is too.


If I might ask, I had thought pools are built with reinforced concrete both walls and floor and drain pipes/electrical pipes are laid all under the reinforcement before casting. I am really surprised to see only concrete blinding and use of sancrete blocks. (All my small knowledge from watching pool kings)

But I am watching sha to learn.

Well done.
spyder880:
Our plan is to slope this swimming pool from the shallow end to the deep end. The shallow end will be 1 metre deep, while the deep end will be 2 metres deep.

This swimming pool as at now is 6.2 metres in length, and 2.9 metres wide. But it will get narrower as we do more work on it.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 2:40pm On Oct 31, 2021
ceelog:
Well done Spyder
Always impressed with your work and I am sure the client is too.


If I might ask, I had thought pools are built with reinforced concrete both walls and floor and drain pipes/electrical pipes are laid all under the reinforcement before casting. I am really surprised to see only concrete blinding and use of sancrete blocks. (All my small knowledge from watching pool kings)

But I am watching sha to learn.

Well done.

We will commence works on the plumbing of this pool, as well as the reinforcement works soon. If I dont fence off the soil, loose earth will make a mess of our reinforcement, the sides wl be caving in on the cast. You can see how the sides has fallen even while we haven't cast it.
Another work the walls do is to give us a level height to work with. I will show all works here. Thanks.

3 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Zikson: 3:18pm On Oct 31, 2021
Oga spyder nice job you are doing, please what will you recommend between Bio digester and our normal soak away. many thanks.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:37pm On Oct 31, 2021
Zikson:
Oga spyder nice job you are doing, please what will you recommend between Bio digester and our normal soak away. many thanks.

Bio digester is a technology that hasn't gained much popularity in my side of the country, the south east. I haven't done a bio digested before, and I must add that I have never seen anyone who has done one in the whole houses I have visited in the south east or south south.

I might not be the best person to compare the two, because of my limited knowledge about bio digester. Thank you.

3 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Ochiske(m): 12:05am On Nov 01, 2021
The air vents by the roof, will they be covered? How will the closing and opening mechanism work?
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:38am On Nov 01, 2021
Ochiske:
The air vents by the roof, will they be covered? How will the closing and opening mechanism work?

The air vents wont be covered with a hard object, I am looking to use strong nets with openings of about 5mm holes to cover the vents. This will be done to prevent lizards and birds from climbing into the rooms. Welcome.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 11:15am On Nov 01, 2021
More pictures

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Valuepaints20(m): 11:34am On Nov 01, 2021
spyder880:
More pictures


Happy new month sir

1 Like 1 Share

(1) (2) (3) ... (23) (24) (25) (26) (27) (28) (29) ... (46) (Reply)

Building Under Construction Collapses In Lekki (Photo) / I Cried When I Entered The Houses Of Billionaires In Lekki / How To Practically Calculate The Quantity (m2) Of Roofing Sheet Required

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 23
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.