Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,204,996 members, 7,990,717 topics. Date: Thursday, 31 October 2024 at 10:25 PM |
Nairaland Forum / Nairaland / General / Properties / The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra (80423 Views)
The Making Of The "Owerri Royal Manor" / The Making Of The "Akure 5 Bedroom Duplex" / The Making Of The Enugu 6 Bedroom Duplex (2) (3) (4)
(1) (2) (3) ... (29) (30) (31) (32) (33) (34) (35) ... (46) (Reply) (Go Down)
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by sonnie10: 7:45am On Dec 01, 2021 |
spyder880:Everything on the third picture is so me. Any idea about prices? |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:35am On Dec 01, 2021 |
sonnie10: I will update the prices later this evening. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 12:07pm On Dec 01, 2021 |
mekussa: Old airport road by Thinkers corner, Emene Industrial layout, Enugu. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by dongc(m): 12:30pm On Dec 01, 2021 |
spyder880: People could easily Google this stuffs...they just choose to ask instead.. 2 Likes
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by mekussa(m): 1:52pm On Dec 01, 2021 |
spyder880: Thanks. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by mekussa(m): 1:53pm On Dec 01, 2021 |
dongc: Come and beat me for asking na 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 2:48pm On Dec 01, 2021 |
The elephant says "hi" 9 Likes 1 Share
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by mufutau55(m): 5:41pm On Dec 01, 2021 |
spyder880: Wow! Looking good already o. Please dey post the full pics o. I like something so different like this. For Yoruba: "Erin Lakatabu". Hajji M. 2 Likes 1 Share |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Nobody: 7:10pm On Dec 01, 2021 |
Nice work. spyder880: |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by michlins(m): 7:14pm On Dec 01, 2021 |
spyder880:there are levels to these things |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by mufutau55(m): 8:32pm On Dec 01, 2021 |
1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by michlins(m): 8:41pm On Dec 01, 2021 |
mufutau55:he brings A+ levels 3 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 11:17pm On Dec 01, 2021 |
mufutau55: Good evening Sir, I will post the full pictures now. I have been driving all evening. |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 11:27pm On Dec 01, 2021 |
Buying some wire gauze today. We will use this to cover the air vents to prevent birds and other animals from finding it's way into the house. I bought two different sizes, the one with a wider opening at the outside, the one with a finer opening will be placed on the inside.
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 11:30pm On Dec 01, 2021 |
mufutau55: michlins: mufutau55: michlins: Thank you all. God bless you. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by mufutau55(m): 1:38am On Dec 02, 2021 |
spyder880: Ok Sir. Thank you. Hajji M. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Beframia: 5:22am On Dec 02, 2021 |
You are doing a great job which is typical of you. The concern is just about birds and other animals, what about dust? Any mitigant? spyder880: 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:40am On Dec 02, 2021 |
Working the inspection chambers.........
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:46am On Dec 02, 2021 |
Beframia: Thank you very much Sir, The main concern I even have is the dusty nature of the season, and weather changes which may heap dust on the final colour we need to leave the statue with. There will be birds, but we can always climb the pillar near the statue with a ladder and clean off any birds droppings from the head of the elephant. |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:50am On Dec 02, 2021 |
More
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:54am On Dec 02, 2021 |
Concrete cast for the covers of the flow inspection chambers being done ..........
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:58am On Dec 02, 2021 |
We have pulled the woods from the swimming pool cast, we will continue to tewat this cast with water daily, for proper curing. Meanwhile we should start the rough plastering works on the inner walls, and the tiles later.
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:03am On Dec 02, 2021 |
Provisions we made for pool functionality...........
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:09am On Dec 02, 2021 |
Compound works ongoing, levelling the soil to fill some spots in preparation for paving............
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:14am On Dec 02, 2021 |
And now, our ongoing works on the elephant......... 1 Like
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:26am On Dec 02, 2021 |
Closer....... 2 Likes
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:31am On Dec 02, 2021 |
Starting work on the second elephant statue at the other side of the gate...........
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Hardheolar(m): 4:39pm On Dec 02, 2021 |
spyder880: Nice work here. How many bags of cement did the first elephant head engulf. |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:00pm On Dec 02, 2021 |
Hardheolar: My brother, these things do consume much materials than I thought. Raw cement mix, this first elephant has consumed up to 20 bags as at yesterday. 3 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:41am On Dec 03, 2021 |
Crafting the doors of this house.........
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:55am On Dec 03, 2021 |
More of these doors........
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Phantom042: 12:37pm On Dec 03, 2021 |
Boss, say I want to replicate this in Aba, how much should I budget? |
(1) (2) (3) ... (29) (30) (31) (32) (33) (34) (35) ... (46) (Reply)
I Cried When I Entered The Houses Of Billionaires In Lekki / These Houses In Ebute Metta Are Too Close To Each Other (pictures) / Lagos Family Houses (Pictures)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 22 |