Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4625084 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (3199) (3200) (3201) (3202) (3203) (3204) (3205) ... (3729) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by decatalyst(m): 8:39pm On Nov 06, 2022
money121:
Men @ Work.. Another Roofing Project Going @ Ikorodu Lagos State

Are you Done with your woodwork and in Need of Quality Aluminium Roofing Sheet? Please Call/WhatsApp 08085310359
Customers Satisfaction is our Watch Word..

Steptiles Design

TRAFFIC Black

0.50mm

What's the cost to do 3 bedroom?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Akerewe(m): 9:01pm On Nov 06, 2022
Stevo30:
Please I got this quote for some column work, is it fair

*Column Casting*
27 pcs (230 x 450 and 230 x 230)

33 bags of Cement = N141,900
Sand = N120,000
Granite = N180,000

1 ton 16mm rod (TMT) = N560,000
15 length 10mm = N57,000
Binding Wire = 16,000

Column formwork rental = N150,000
(Bamboo, Wood, column shutter, nail and workmanship)

Iron bending = 50,000
Casting = 30,000


*N1,324,900*


I think d price is fair for 27 columns, but d cement is too small oo. It should be 3bags for 2 columns, which should be like 40bags. what about beams?

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sees1010(m): 10:30pm On Nov 06, 2022
I need a link to someone that can give me #2m loan, I will pay with 60% interest within 12month, payable every month, you guys please link me, 090. 3003. 4445. Is my co tact lne
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by erico2k2(m): 11:05pm On Nov 06, 2022
Nero2424:



The design is good and the microwaves dont go bad but yes the bottom can be greasy after many years of usage and the bottom also have light equipped so u can see your cooking clearly. My design is different from Sonnie10 but still have the extraction duck buried in the wall. Maybe because i have a newer built and updated appliances.

The technology works and i wish i can do same in Nigeria but unfortunately i bought a microvawe, Range and refrigerator today without finding anything like that.
I still find this setting weird dunno why put the microwave fru such stress
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by CDG1(m): 11:29pm On Nov 06, 2022
Hi
My name is Caleb from masterpiece trucks and granites .
Thanks for stopping by, without wasting your precious time.
Masterpiece is one the best suppliers with materials coming from Ijebu Ode and Abeokuta.
We have been in quarry mining for sometime now, presently serving about 100 active customers with a 1000 tons supply capacity per day.
Our material quality has been tested and verified by so many advance construction companies and Asphalt companies.
We understand that buying from some suppliers pose you the risk of not getting the exact tonnage paid for so we are offering you a partnership to give you the best supply package.

The benefits includes:
24/7 supply and support services
Haulage services (Howo trucks and Mack trucks)
Weekly/monthly report.

available materials are:
Boulder =6800/ton
Dust =2500/ton
1/2inch =7300/ton
stonebase =6800/ton
Hardcore =6800/ton
3/4 = 7300/ton
5/8(3/4down) =7300/ton


Looking forward to establish partnership with you... 07026691840

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sonnie10: 11:41pm On Nov 06, 2022
erico2k2:

I still find this setting weird dunno why put the microwave fru such stress

Real stress. Oyinbo no dey cook our type of food. I can’t count the number times frying my tomatoes and peppers stew had tripped the sensor of the microwave. Small smoke from sharki and egufe, and the vent comes on! Too much Wahala and false alarm.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sonnie10: 11:45pm On Nov 06, 2022
sees1010:
I need a link to someone that can give me #2m loan, I will pay with 60% interest within 12month, payable every month, you guys please link me, 090. 3003. 4445. Is my co tact lne
The first question is what collateral do you have?
Second question, they would ask, are you will to do dollar equivalent? Meaning you pay back in dollars.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by erico2k2(m): 11:56pm On Nov 06, 2022
sonnie10:

The first question is what collateral do you have?
Second question, they would ask, are you will to do dollar equivalent? Meaning you pay back in dollars.
you wont get an answer¬
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Successbay: 2:03am On Nov 07, 2022
Forgiven and a positive course charted for 2023...

God Bless all our efforts.

4 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sonnie10: 2:14am On Nov 07, 2022
Successbay:
Good morning My Nairaland Chiefs. I made a statement about someone whom I gave job to on this thread since August, based on previous work relationship, but till date none of the jobs contracted to this guy has been completed successfully and to makes matters worse, he doesn't even show up nor is he putting efforts to get my work done. I will try to be brief about how this current contract offer started.

On the 5th of August 2022, Adedward, reached out to me, to find out about the finishing status of my building, that he has two cubicles he wants to dispose at the rate of #100,000 each, because he has some family emergencies to resolve. I thought about it and told him to meet me onsite the following day 6th August 2022. On arrival, I told him I will only be purchasing one cubicle for the master bedroom, but I would like to give him some more jobs based on previous working relationship (he roofed the building and that of my mom in the past). So, I contracted him to change the toilet doors of 5 of my bathrooms, that were previously fixed using panel doors and some other fanciful doors, that Adedward himself convinced me they aren't good for bathroom doors. This was contracted out at #200,000, making a total of #300,000 with the one cubicle he said was in his office for sale. I transferred #150,000 to him same day [b](6th August 2022)
.
The following day, he reached out to me to transfer extra #50,000, that he has removed the #100,000 for the cubicle and the remaining #50,000 won't be able to sort out the frames of the toilet doors, so I gave him extra #50,000 making #200,000 out of the #300,000 for the cubicle and toilet doors. He came to erect the toilet frames on the 10th of August and sent me pictures, I remembered querying him, as the frames didn't look plum to me, but he said he erected himself and they are fine.

While waiting for the tilers to get done, I called him to come fix stone coated sheets as roof facia, Adedward also convinced me to fix water collectors in addition that they are all his job, we settled for #440,000 for this. I paid him in tranches of #80,000 on the 12th of August, #300,000 on the 16th of August [/b]and when he came calling for extra money, gave him the remaining [b]#60,000 balance on the 22nd of August, 2022... COMPLETING payment for the water collectors and roof facia.

He did bring materials to site, but never completed the roof facia from then till date (Cos he kept bringing the materials in piece meal) and ran just about 5% of the length of the water collectors, wrongly till date...

When I kept disturbing him to come complete the jobs he collected money for, he kept reminding me of not being the first time he has worked for me and that once the flooring of the compound is completed, he will come run the water collectors, complete the roof facia, fixed the toilet doors and glasses, fix the cubicle and fix the outstanding window nets (Forgot to mention he was the one who also got contract for the windows in the past).

On completion of tiling, I told Adedward to come fix the cubicle and after following up for weeks, he claimed the cubicle is not in his office but in his house at Mowe, after several attempts, he told me the cubicle has broken on his way to my site and that he will refund my #100,000....

To fix the bathroom doors.. he requested for additional #80,000, which I gave him on the 4th of September, 2022 to enable him get the glass and fix the door...

Money paid to Adedward till Date;

cubicle - #100,000 (Completed)
Toilet Doors - #180,000 (#20,000 balance left)
Water Collectors/Roof Facia - #440,000 (Completed)

Total - #720,000

The last tranch of payment was made 4th September 2022..

Till date, Cubicle, not fixed; Water collectors - 5% completed; Toilet Doors - 50% completed with errors; Window nets - Not fixed.

I have tolerated his excuses long enough, he no more picks my calls and only sends voice notes, giving excuses and requesting for more time.. We had to move into the house like that, no window nets, no bathroom doors, water collector zero and roof facia not completed..

He is banking on the fact that I do not work in Lagos, nor I do not know his office or home..

My ogas, this is the issue I am currently in, your counsel and advice is welcome..

Thank You.




Na so God saved me. My over 5M for windows for enter voicemail

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dannie007(m): 4:42am On Nov 07, 2022
For the Internal Doors I can give you Quality HDF Doors.

The Kitchen you need to specify the size or dimension of what you want and same as the waldrops.

OX Furniture. 09090040008



kingsman042:
Good morning builders and future builders in the house. Please, I'm about to start finishing of a 6 unit 2 bedroom flat in Enugu so please give me your best quotes if you’re an expert in any of the below mentioned jobs.

1 - Aluminum casement window using white profile, Burglary pipe and Blue glass (5mm)

Dimensions -

900mmx1400 = 42 units
900mm x 900mm = 6 units
600mm x 700mm = 18 units
600mm x 10000mm = 4 units

2. Plastering, door and window installation and dressing of 6 units of 2 bedroom flat.

3. Pop and Cornice (please give me your best price per sqm with and without labour)

4. Turkish doors for outside and internal (also for bathroom, kitchen and bedroom)

5. Kitchen installation

6. Wardrobe


Please drop your quotes and I’ll contact the person with best price


Thanks a lot.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gbadexy(m): 6:27am On Nov 07, 2022
Successbay:
Good morning My Nairaland Chiefs. I made a statement about someone whom I gave job to on this thread since August, based on previous work relationship, but till date none of the jobs contracted to this guy has been completed successfully and to makes matters worse, he doesn't even show up nor is he putting efforts to get my work done. I will try to be brief about how this current contract offer started.

On the 5th of August 2022, Adedward, reached out to me, to find out about the finishing status of my building, that he has two cubicles he wants to dispose at the rate of #100,000 each, because he has some family emergencies to resolve. I thought about it and told him to meet me onsite the following day 6th August 2022. On arrival, I told him I will only be purchasing one cubicle for the master bedroom, but I would like to give him some more jobs based on previous working relationship (he roofed the building and that of my mom in the past). So, I contracted him to change the toilet doors of 5 of my bathrooms, that were previously fixed using panel doors and some other fanciful doors, that Adedward himself convinced me they aren't good for bathroom doors. This was contracted out at #200,000, making a total of #300,000 with the one cubicle he said was in his office for sale. I transferred #150,000 to him same day [b](6th August 2022)
.
The following day, he reached out to me to transfer extra #50,000, that he has removed the #100,000 for the cubicle and the remaining #50,000 won't be able to sort out the frames of the toilet doors, so I gave him extra #50,000 making #200,000 out of the #300,000 for the cubicle and toilet doors. He came to erect the toilet frames on the 10th of August and sent me pictures, I remembered querying him, as the frames didn't look plum to me, but he said he erected himself and they are fine.

While waiting for the tilers to get done, I called him to come fix stone coated sheets as roof facia, Adedward also convinced me to fix water collectors in addition that they are all his job, we settled for #440,000 for this. I paid him in tranches of #80,000 on the 12th of August, #300,000 on the 16th of August [/b]and when he came calling for extra money, gave him the remaining [b]#60,000 balance on the 22nd of August, 2022... COMPLETING payment for the water collectors and roof facia.

He did bring materials to site, but never completed the roof facia from then till date (Cos he kept bringing the materials in piece meal) and ran just about 5% of the length of the water collectors, wrongly till date...

When I kept disturbing him to come complete the jobs he collected money for, he kept reminding me of not being the first time he has worked for me and that once the flooring of the compound is completed, he will come run the water collectors, complete the roof facia, fixed the toilet doors and glasses, fix the cubicle and fix the outstanding window nets (Forgot to mention he was the one who also got contract for the windows in the past).

On completion of tiling, I told Adedward to come fix the cubicle and after following up for weeks, he claimed the cubicle is not in his office but in his house at Mowe, after several attempts, he told me the cubicle has broken on his way to my site and that he will refund my #100,000....

To fix the bathroom doors.. he requested for additional #80,000, which I gave him on the 4th of September, 2022 to enable him get the glass and fix the door...

Money paid to Adedward till Date;

cubicle - #100,000 (Completed)
Toilet Doors - #180,000 (#20,000 balance left)
Water Collectors/Roof Facia - #440,000 (Completed)

Total - #720,000

The last tranch of payment was made 4th September 2022..

Till date, Cubicle, not fixed; Water collectors - 5% completed; Toilet Doors - 50% completed with errors; Window nets - Not fixed.

I have tolerated his excuses long enough, he no more picks my calls and only sends voice notes, giving excuses and requesting for more time.. We had to move into the house like that, no window nets, no bathroom doors, water collector zero and roof facia not completed..

He is banking on the fact that I do not work in Lagos, nor I do not know his office or home..

My ogas, this is the issue I am currently in, your counsel and advice is welcome..

Thank You.




From the word go, the signs has been there that he needed money urgently for his personal use but you showed empathy to give him legitimate jobs to make that money, something someone like me would still do.
His very big mistake was not properly leveraging on his reputation to get such several other jobs to make up whatever he wants to use the money for in a proper way.
Whatever any money is given for any job, any serious minded contractor would make the whole sum in profits from several regular jobs with assurance of regular referrals and repeat customers that would make the initial seemingly big money look very pale in comparison.
There has been similar complaints by a reputable client I supplied here also but he too was reluctant to give too much details here so as not to totally affect his chances.
If he is reading it, know that what you stand to lose is far more than the little you gain. I wish for you that whatever you are going through is resolved but try and salvage this situation.
It won't be difficult to locate him now that the details are out. Best for him to do the needful fast on his own.
N.B I thought he advertised some lands for sale at mowe recently?

5 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 6:58am On Nov 07, 2022
Pop @ affordable prices, contact us for you best pop design

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DFAMEGUY11S(m): 7:49am On Nov 07, 2022

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abbeyb1ack: 9:28am On Nov 07, 2022
Coiner:
Greetings house.

I noticed this belting and tiling is a common practice. People say it's to slow down capillary and also protect that part of the building from water splash. But I personally do not fancy it.

Is it really necessary or just for aesthetics? Someone help pls..

Red arrow.. ⤵️

You already outline reason why some people do it na grin
Same reason I will like to do it also cos I really fancy it

I think it just base on preference sha
Some don't like it too
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abbeyb1ack: 9:33am On Nov 07, 2022
It's more like people that dosnt like divider in dere aluminum window...they love it plain
And this particular person dosnt fancy those belt too
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by FEGEITOK: 9:53am On Nov 07, 2022
Coiner:
Greetings house.

I noticed this belting and tiling is a common practice. People say it's to slow down capillary and also protect that part of the building from water splash. But I personally do not fancy it.

Is it really necessary or just for aesthetics? Someone help pls..

Red arrow.. ⤵️

It doesn't slow it down.

It masks it.

Eventually it will show up, but much later.

If you want to stop capillary action install a capillary break or several layers of capillary breaks.

Here is what I am currently doing

1. I installed a 4-inch-thick gravel bed (next time I plan to make it 6 inches)

2. I installed plastic sheeting aka damp proof membrane (double layer), we don't have standards here, so I hope that the double layer will help. The British Standard for DPM is at least 1200 gauge (or 300 micrometres). But no one in the market understands those terms. I don't have the time to import them.

3. I then installed a 4-inch-thick concrete footing (using a 1-part cement to 2 parts sand (stone dust) to 3 parts coarse aggregate [gravel] mix)

4. I am waiting for a couple of days to pass. Following which I will install another damp proof membrane before laying blocks on the concrete footing.

Still waiting for the water to pass through all those defences to attack my walls.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KIDfurniture(m): 10:42am On Nov 07, 2022
The best! Best option for me is this one . Simple and lovely. Tiles round the house is odd & on the shelf. We have expensive paints that keeps water away from the walls of the building .



Coiner:
I would prefer something like this. Are there any drawbacks long term?


See red arrow ⤵️

@spyder880

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by CDG1(m): 11:19am On Nov 07, 2022
Hi
My name is Caleb from masterpiece trucks and granites .
Thanks for stopping by, without wasting your precious time.
Masterpiece is one the best suppliers with materials coming from Ijebu Ode and Abeokuta.
We have been in quarry mining for sometime now, presently serving about 100 active customers with a 1000 tons supply capacity per day.
Our material quality has been tested and verified by so many advance construction companies and Asphalt companies.
We understand that buying from some suppliers pose you the risk of not getting the exact tonnage paid for so we are offering you a partnership to give you the best supply package.

The benefits includes:
24/7 supply and support services
Haulage services (Howo trucks and Mack trucks)
Weekly/monthly report.

available materials are:
Boulder =6800/ton
Dust =2500/ton
1/2inch =7300/ton
stonebase =6800/ton
Hardcore =6800/ton
3/4 = 7300/ton
5/8(3/4down) =7300/ton


Looking forward to establish partnership with you... 07026691840

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by inze(m): 11:38am On Nov 07, 2022
.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DMTtechnologies: 12:47pm On Nov 07, 2022
Felow Contractors ...how una dey cope.... Material cost is out of this world... kilode..? shocked shocked shocked shocked

Plenty Fluctuation Claims this season

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DMTtechnologies: 12:49pm On Nov 07, 2022
Abbeyb1ack:
It's more like people that dosnt like divider in dere aluminum window...they love it plain
And this particular person dosnt fancy those belt too

bro..., na the stamped concrete u dey show us naa... :-) looks good though :-)
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by hslbroker2(m): 2:52pm On Nov 07, 2022
Buy hardwood (2x2, 2x3, 2x4, 2x6, 3x4, 1x12) buy iron rod (8mm, 10mm, 12mm, 16mm, 20mm local and TMT) payment on delivery,thanks for your patronage, God bless you all 09132123240.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Successbay: 2:58pm On Nov 07, 2022
Thank you for your response Gbadexy, Yes he did advertise lands in Mowe.

gbadexy:

From the word go, the signs has been there that he needed money urgently for his personal use but you showed empathy to give him legitimate jobs to make that money, something someone like me would still do.
His very big mistake was not properly leveraging on his reputation to get such several other jobs to make up whatever he wants to use the money for in a proper way.
Whatever any money is given for any job, any serious minded contractor would make the whole sum in profits from several regular jobs with assurance of regular referrals and repeat customers that would make the initial seemingly big money look very pale in comparison.
There has been similar complaints by a reputable client I supplied here also but he too was reluctant to give too much details here so as not to totally affect his chances.
If he is reading it, know that what you stand to lose is far more than the little you gain. I wish for you that whatever you are going through is resolved but try and salvage this situation.
It won't be difficult to locate him now that the details are out. Best for him to do the needful fast on his own.
N.B I thought he advertised some lands for sale at mowe recently?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 3:09pm On Nov 07, 2022
Coleman has increase their cable price by 45% . The price is to take immediate effect .

Nigerchin will review their prices any moment .. so if you have the opportunity pls order now. Nigerchin and kabelmetal is still remain the same
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by hslbroker2(m): 3:38pm On Nov 07, 2022
DMTtechnologies:
Contractors ...how una dey cope.... Material cost is out of this world... kilode..? shocked shocked shocked shocked

Plenty Fluctuation Claims this season

We dey cope small small

Na buhari dey cause this nonsense

He will soon leave us alone.

But I can give u TMT for N520k all mm

Payment on delivery
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by hslbroker2(m): 3:42pm On Nov 07, 2022
topsy23:
Coleman has increase their cable price by 45% . The price is to take immediate effect .

Nigerchin will review their prices any moment .. so if you have the opportunity pls order now. Nigerchin and kabelmetal is still remain the same

Just imagine 45% increment

hummmm
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:55pm On Nov 07, 2022
Top bond or vinko bond supplier I need you guys urgently for a deal

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by money121(m): 3:59pm On Nov 07, 2022
Loading of Longspan Aluminium (Mentral Design) Roofing Sheet to Ikoyi Lagos State

Kindly Call/WhatsApp 08085310359

Kindly promote us by RT

Colour: Grey Biegi

0.70mm

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 4:20pm On Nov 07, 2022
hslbroker2:


Just imagine 45% increment

hummmm

Seriously this is not the best time for this increment.. Alot of people are struggling to complete their project but price of building materials keep on increasing every week ..
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by segcymoor(m): 5:27pm On Nov 07, 2022
Aventures:
Nice one bro, let's go there.

Thanks Baba..
Good to have you...
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by hslbroker2(m): 5:28pm On Nov 07, 2022
topsy23:


Seriously this is not the best time for this increment.. Alot of people are struggling to complete their project but price of building materials keep on increasing every week ..
no matter how difficult it's, God we continue to make ways for us.

(1) (2) (3) ... (3199) (3200) (3201) (3202) (3203) (3204) (3205) ... (3729) (Reply)

Viewing this topic: RockOfAgesAlumi(m), uchechukwuochei(m), mythy70(m) and 3 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 79
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.