Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,201,878 members, 7,980,068 topics. Date: Sunday, 20 October 2024 at 03:02 AM |
Nairaland Forum / Nairaland / General / Properties / The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process (43681 Views)
Construction Process Of 4 Flats Apartments. / Construction Process Of Four Bedroom Bungalow @ Mowe / CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE (2) (3) (4)
(1) (2) (3) ... (20) (21) (22) (23) (24) (25) (26) ... (33) (Reply) (Go Down)
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:52pm On Nov 07, 2022 |
We bought and offloaded more tiles for our use in this building...........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:55pm On Nov 07, 2022 |
Offloading cement, and more wall tiles that will be used in this house.............. To avoid the easy cracking of tiles, we usually soak it in water for some time before applying the tiles on the walls. This will make it soak some more water, leaving it less brittle that it should have been if its fully dry. 2 Likes
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:02pm On Nov 07, 2022 |
Observing the start of wall tiling in this house, this will be the first bathroom to be tiled.
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by michtob(m): 10:52am On Nov 09, 2022 |
Nice one. Will love to see the finishing of this masterpiece 1 Like |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 5:17pm On Nov 09, 2022 |
michtob: We will give thei our best shot, already arranging tonincrease the workers here. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 5:19pm On Nov 09, 2022 |
Bathroom Wall tiles in progress............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 2:09pm On Nov 10, 2022 |
spyder880: Nice tiles. Is that pop on the ceiling or cornice? 1 Like |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:44pm On Nov 10, 2022 |
rukyboy: Cornice. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by Beframia: 12:40am On Nov 11, 2022 |
Why is it that all these tilers don't have a device that can cut a circular shape through a tile to perfectly fit around that pipe protruding from the wall? The tiler is trying sha. spyder880: 1 Like |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by FEGEITOK: 1:05am On Nov 11, 2022 |
Beframia: There is such a device. Egunmogaji used it in his build. BUT he had to buy it himself. The tiler did not have it. It isn't even expensive. Maybe it's a lack of exposure or a lack of demand from the clients that lets them get away with less than perfect jobs 1 Like
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:35am On Nov 11, 2022 |
Now, let's remove the scaffolding which we used to plaster this house..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:41am On Nov 11, 2022 |
And sealing the holes neatly..............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:25am On Nov 13, 2022 |
We are done with hanging every room door in this block of flats. We have also hung all the bathroom doors, we have also dressed all the doors.
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:29am On Nov 13, 2022 |
We have brought in the welded iron doors meant for the main entrance to each flats........... We are currently hanging the doors now.
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:32am On Nov 13, 2022 |
Let's hang all these iron doors and dress them in neatly............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:34am On Nov 13, 2022 |
Meanwhile, wall tiles is still going on. Expecting another team of my workers in this site today. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 2:17pm On Nov 13, 2022 |
spyder880: Money is good! Work is just moving nonstop. 2 Likes |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 2:20pm On Nov 13, 2022 |
spyder880: Engr. How much for these welded doors. The 3ft and 4ft |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 2:20pm On Nov 13, 2022 |
rukyboy: Thank you. I now have an expanded team of good workers and we can take on multiple projects at once. Welcome. 1 Like |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 2:24pm On Nov 13, 2022 |
rukyboy: 4ft with 6" frame N50,000 4ft with 9" frame N55,000 3ft with 6" frame N35,000 3ft with 9" frame N40,000 |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 4:38pm On Nov 13, 2022 |
spyder880: Thank you |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:07pm On Nov 20, 2022 |
More of my tilers will arrive this site by tomorrow. More pictures from this site tomorrow. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:37pm On Nov 23, 2022 |
My new tilers started working on this site today, more pictures of our work here tomorrow. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:18pm On Nov 26, 2022 |
More pictures from our tiles work in this house today.............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:21pm On Nov 26, 2022 |
In one of the kitchens......... 2 Likes
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by redgem(f): 1:37pm On Nov 29, 2022 |
spyder880: The tiling is it contract or you are paying per sqm? |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 1:53pm On Nov 29, 2022 |
redgem: Per sqm |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by redgem(f): 7:58pm On Nov 29, 2022 |
spyder880: Please how much is he charging? |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:55pm On Nov 29, 2022 |
redgem: N450 |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 3:41am On Nov 30, 2022 |
Starting the floor tiling process, floor screeding, then laying floor tiles..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 3:45am On Nov 30, 2022 |
Still ongoing work...........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 3:51am On Nov 30, 2022 |
From some rooms done............
|
(1) (2) (3) ... (20) (21) (22) (23) (24) (25) (26) ... (33) (Reply)
GLO Wants To Plant A MAST On My Land. What Are My Benefits And Its Hazards - / People Killed From The Gas Plant Explosion In Lagos (Graphic Photos) / Landlord Shoots Tenant Over Rent In Lagos
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 22 |