Re: Solar Energy Logbook. by Obnoxious2001(m): 4:46am On Apr 22
We started doing the internals after we completed it, we supplied grid to see if the inverter will charge, inverter couldn't charge 🥲🥲.

We checked and disconnected the current limiter nothing changed.
We browse through the settings and nothing.

we were frustrated (this was happening around to 10 pm) and we were trying to head back to our destination.

Guess what, just long holding the ESC button was what had kept us on site for over 1hr+.

Damn it was our first time working with this inverter so we needed to get acquainted with the interface and set up.


In summary, we slept over and left the site on Sunday 8 am.
With the contractor heading back to warri while I stayed behind.
Re: Solar Energy Logbook. by Valto(m): 9:27am On Apr 24
Obnoxious2001:
We started doing the internals after we completed it, we supplied grid to see if the inverter will charge, inverter couldn't charge 🥲🥲.

We checked and disconnected the current limiter nothing changed.
We browse through the settings and nothing.

we were frustrated (this was happening around to 10 pm) and we were trying to head back to our destination.

Guess what, just long holding the ESC button was what had kept us on site for over 1hr+.

Damn it was our first time working with this inverter so we needed to get acquainted with the interface and set up.


In summary, we slept over and left the site on Sunday 8 am.
With the contractor heading back to warri while I stayed behind.
welldone bro. mounting solar no easy at all. thank God no harm was done. some roof na no go area sha.

2 Likes

Re: Solar Energy Logbook. by obinna37(m): 9:58am On Apr 24
Obnoxious2001:
We started doing the internals after we completed it, we supplied grid to see if the inverter will charge, inverter couldn't charge 🥲🥲.

We checked and disconnected the current limiter nothing changed.
We browse through the settings and nothing.

we were frustrated (this was happening around to 10 pm) and we were trying to head back to our destination.

Guess what, just long holding the ESC button was what had kept us on site for over 1hr+.

Damn it was our first time working with this inverter so we needed to get acquainted with the interface and set up.


In summary, we slept over and left the site on Sunday 8 am.
With the contractor heading back to warri while I stayed behind.
can we know the name of the inverter,if possible the picture of it,in case
Re: Solar Energy Logbook. by Obnoxious2001(m): 7:02pm On Apr 24
obinna37:
can we know the name of the inverter,if possible the picture of it,in case

I will provide pictures.

It's must hybrid inverter (low PV)
Re: Solar Energy Logbook. by obinna37(m): 2:40pm On Apr 28
Obnoxious2001:


I will provide pictures.

It's must hybrid inverter (low PV)
ok
Re: Solar Energy Logbook. by kernniejay(m): 8:06pm On Apr 28
Obnoxious2001:
It was in this process local man almost fell🙂. You know that proverbs that says them no dey use 2 legs test if water deep.
Na this roof them dey talk about.

I took a testing step and broke the roof.we discovered later that the wood there has decayed.

Now if you are an installer,I will advise you to inspect the roofing before you work on it.

I conquered the installation with no injury even after the accident.
Thank God o. Na wetin u go chop u dey find, u no go meet wetin go chop u oh, amen.

2 Likes

Re: Solar Energy Logbook. by Valto(m): 8:12pm On Apr 28
kernniejay:

Thank God o. Na wetin u go chop u dey find, u no go meet wetin go chop u oh, amen.
amen
Re: Solar Energy Logbook. by Drgreatone: 7:24pm On May 10
Obnoxious2001:


I will provide pictures.

It's must hybrid inverter (low PV)
Had a similar experience with the 5kva model. Connected everything and then inverter didnt supply output. Everything was intact and worse off,no error code. Na like say my village ppl were in my case as i had promised they wid commission it that day. Long story short, sent inverter back and was repaired under warranty.
Enjoying ur diary, keep it up!!
Re: Solar Energy Logbook. by Obnoxious2001(m): 9:02am On May 11
obinna37:
can we know the name of the inverter,if possible the picture of it,in case
This is the picture of the inverter.
It's a low PV hybrid inverter.
One of my bosses too witness something similar.
Lol

Re: Solar Energy Logbook. by Obnoxious2001(m): 9:04am On May 11
kernniejay:

Thank God o. Na wetin u go chop u dey find, u no go meet wetin go chop u oh, amen.
No be lie.
Deep down before I spare head some installation, I lowkey whisper "O lord let this not be my last" fear dey even catch team leader undecidedgrin grin grin

2 Likes

Re: Solar Energy Logbook. by Obnoxious2001(m): 9:05am On May 18
9th of April 2024

I went back to Warri to round up some stuff(they are school related).

Considering that man has to keep body and Soul in uniformity, so I visited my boss who I learnt from (Na nwaboi approach I use to learn this job) he needed assistance on a project he was working on, since he will not be in town that was how we installed 4500wp of PV. + The additional 2700wp we meet there

Re: Solar Energy Logbook. by Obnoxious2001(m): 9:15am On May 18
17th April 2024.
After so many "I dey come I dey come grin"
Meet me by 10am grin
we journeyed to a betshop at ifie Warri Delta State.
On getting to the site, we meet a failed roofing structure (the roofs were leaking and the woods in some parts were broken already).

Fast forward, we got a ladder 🪜 and I had to figure a way out to drop down all the solar panels so the carpenter can do maintenance.

I got on the roof (there was a over head wire in my current position so I couldn't do the job from the ladder, the other 3 where all dropped from a ladder) and dropped the solar panels.

As much as we clamour for bigger wattage solar panels, I feel we should pay more attention to the maneuverability and the environment we install them.
This stuff where just too heavy considering I had to look over my head😩.

1 Like

Re: Solar Energy Logbook. by Trippledots(m): 9:52am On May 18
Well done. Please be more careful especially with fragile roofs.

1 Like

Re: Solar Energy Logbook. by Obnoxious2001(m): 6:00am On Jun 06
18th April 2024
This is the preview after the job has been done.
Shout out to @brightk

Re: Solar Energy Logbook. by Obnoxious2001(m): 6:04am On Jun 06
19th April 2024
Location: ugborikoko Warri Delta State

On this day we went out for maintenance, I got a call from @brightk that there was a need to reconfigure some panels, this was after we had Already swapped the inverter with another one from the previous betshop we visited.

We installed the inverter and inverter no gree on🥹...
Ah

This is something that was working in the previous shop.
We started thinking and thinking why the gennex inverter was not working, we had 0 idea.

However, In the earlier month at the other betshop, we had a discussion/argument with the cashier there on how long the inverter takes to switch off.

This was how we jump and pass 😂.
You know situation where you touch something and it spoils, Na so the client go disturb you not knowing there was an impending doom

Re: Solar Energy Logbook. by Obnoxious2001(m): 9:59am On Jun 06
20th April 2024
Location: ugbomro Delta State

This was installed after a friend of mine ( he studied electrical/electronics, but was more grounded in welding and fabrication) under quoted for a job and we had to start doing damage control.

The system was supposed to provide power for a 1.5hp inverter AC during the day and provide backup for other light appliances.

Considering that there was fire on the mountain, that was how we started trying to cut down cost, we priced and priced to the extent that I had to leave him at the shop there make he come out of the situation first 😂😂😂.

Finally we ended up doing

9pcs of 250w solar panels (though they claim the panel is 320w)
4pcs of gel batteries
5kva hybrid inverter (high pv).

Re: Solar Energy Logbook. by Obnoxious2001(m): 6:03pm On Jun 06
Our saving grace was the features of inverter AC if not them go call us quacks not knowing I just only handled the installation of the job.

Inverter AC actually don't have surges and they reduce their power consumption when it gets to a certain temperature.

Lol.

I have always pray not to be in such situations after I visited the army estate in warri to troubleshoot a battery failure ( the batteries were always over charging).

I was told that it was a 24v system not knowing it was a 48v system and this guy's connected 2 batteries in it because they didn't have a bypass system.

I was carried away with trying to figure out why it doesn't stop while charging (I do fix inverters low-key) so I was just thinking..

Low and behold, Na so another installer came and started troubleshooting then we found out it was 48v

I felt very stupid I was like I need to start paying less attention to what these people say. I wasn't paid a dime even though I told him about my callout fees but I wasn't bothered because I learnt a very big lesson.

Re: Solar Energy Logbook. by brightk(m): 9:31pm On Jun 06
U never chi chomtin
Re: Solar Energy Logbook. by Obnoxious2001(m): 2:57pm On Jun 07
brightk:
U never chi chomtin
grin angry grin.
Na install I go install.

Is funny how Na when problem dey them dey reach me out.

I will not like to skip the dairy to current even, but am on my way to solving one currently at express junction udu.

I will tag it when it's due
Re: Solar Energy Logbook. by Obnoxious2001(m): 5:38pm On Jun 15
24th April 2024.
Location: Alegbo

Small set up for a moderate load.

The client wanted a fridge running on it just in the afternoon( I have included the name plate of the fridge)
The fridge is supposed to run 5hrs daily
We finally ended up going or a 1.5kva inverter 12v, 1pcs tubular battery and 3pcs 300w solar panel.

Re: Solar Energy Logbook. by HeavenlyBang(m): 6:51am On Jun 16
Obnoxious2001:
24th April 2024.
Location: Alegbo

Small set up for a moderate load.

The client wanted a fridge running on it just in the afternoon( I have included the name plate of the fridge)
The fridge is supposed to run 5hrs daily
We finally ended up going or a 1.5kva inverter 12v, 1pcs tubular battery and 3pcs 300w solar panel.


This is for just a fridge?
Re: Solar Energy Logbook. by Obnoxious2001(m): 10:32am On Jun 16
HeavenlyBang:


This is for just a fridge?
Yeah and other appliances
DC fan,a 45" tv and light
Re: Solar Energy Logbook. by HeavenlyBang(m): 10:47am On Jun 16
Obnoxious2001:

Yeah and other appliances
DC fan,a 45" tv and light

Oh, ok. Fair enough.
Re: Solar Energy Logbook. by Obnoxious2001(m): 7:58pm On Jul 04
Cobwebs don dey use style cover this logbook.

Na am back I will clean it up and keep this thread active smiley
Re: Solar Energy Logbook. by Obnoxious2001(m): 8:04pm On Jul 04
Obnoxious2001:
24th April 2024.
Location: Alegbo

Small set up for a moderate load.

The client wanted a fridge running on it just in the afternoon( I have included the name plate of the fridge)
The fridge is supposed to run 5hrs daily
We finally ended up going or a 1.5kva inverter 12v, 1pcs tubular battery and 3pcs 300w solar panel.


25th April 2024
Location: DSC steel town

1080wp of PV (6 unit of 180w though the client claimed they are 250w grin)

As usual we headed out myself and emeritus D great.

Before then I had supplied the almighty 60A powmr mppt solar charge, (I still have a unit available in warri if you need it).

The client procured his solar panels, wire then he reached us out again for the installation.

As usually we delivered.

Before we started, we had doubt that the space available on the roof will be sufficient, after so many back and forth, we delivered it as usual

Re: Solar Energy Logbook. by Obnoxious2001(m): 8:13pm On Jul 04
28th April 2024.

A colleague of mine reached out to me that there was a government project that needed to be executed before on Monday.

Been familiar with government projects timing, I wasn't expecting it to be as soon as possible(i was informed on Thursday).

On Saturday the 27th, 8 able and capable bodied men headed out to Benin to commence the project.

We arrived Benin bypass at around 12pm, then boarded another bus to our apartment (yes there was provision for accommodation, but it was very far from the location that we had just spent a night then ditched it).

We used the opportunity to get all the railing, nails and bolts for the installation

On Sunday, the job commenced .
The weather was not friendly at all as we worked under the harsh weather conditions ( we were trying to meet up with the commissioning date which was Monday 29th 2024)

We worked day and night, because we were to mount 48pcs of solar 420w solar panels(10kwp of PV per location), 2pcs 15kwh felicity lithium battery and 4pcs of 7.5kva inverter at 2 different people location.

I have attached some images of the day and night life of the job.

One good thing this job did was expose me to other ways of mounting bigger wattage of panels, because brainstorming and coming to agreement took a whole lot of time but it was worth every part of it.

1 Like

Re: Solar Energy Logbook. by Obnoxious2001(m): 1:41pm On Jul 06
Obnoxious2001:
I got in with my journeyman and we started preparing the mounting rack ( we used interlock aluminium profile for this job, from experience I think they have better stability when trying to nail them into the roof)

We did some calculations to manage material grin grin grin my oga you dey owe me undecided . So we ended up using 3pcs of aluminium profile to mount 8pcs of the 550w solar panel.

Preparing the railing was not the problem self, pulling the panels up the roof was too stress full (all my body done break forget I said I was made for this 😭😭).

There where some many challenges with the ridge board has broken and some of the wood.

So we had to swap position (who dem dey lead sometimes no know Wetin leader they see) with me myself taking the most risky position on the roof.
We dont have pictures of the process just minor clips here and there.

But am grateful, am able to come back to this thread to document it
grin grin grin grin.
Shout out to all the key people involved in the project.

Hopefully, we I will be sharing update on battery and inverter system.
We are having some down time procuring the batteries

May 1st 2024.

Who remembers this 2 storey we worked on earlier?
We went back to that same location, but this time around we are to remove the solar panels and re-install them.

Initially the scope of the job was to bring it down totally then raise it back up.
I was like that is a lot of risk I will be exposing my team to(as we dey find money we still dey pray to see the next day Hale and hearty).

We discussed with the carpenter and came to a compromise that we will move the items around then roof simultaneously as they worked.

Re: Solar Energy Logbook. by Obnoxious2001(m): 2:09pm On Jul 06
2nd May,2024

Location: Apala

4640wp solar panels installed.
7kwh battery
3.5kva felicity hybrid inverter


Earlier on the 1st of May, I visited this site to survey it before heading to leventies. We completed the job over there and commenced the job on this current location.

On this day we prepared the protection system (the earth pit) @brightk brought in a colleague from PHCN that supervised the whole procedure and Standard.
(Modified: we made use of gem, although the PHCN guy was not in agreement with us, he like money whey I fit use chop undecided, then he shared an alternative they used, cow dung and dongoyaro leaves. Surprise? So I was)

After the whole preparations, it started raining and we called it a day.

We just dash the ladder owner free money undecided.

Re: Solar Energy Logbook. by Obnoxious2001(m): 2:36pm On Jul 06
4th May,2024

After so many I dey road dey come grin grin grin from SNR man.

We ended up mounting the 9pcs of 580w panels on the roof.
Just I and emeritus D great smiley.

Low-key I was looking for who would assist us considering I was on the roof (asbestos) and emeritus on the ground. But it seem emeritus has finally put his weight lifting to good use grin grin.

Re: Solar Energy Logbook. by Obnoxious2001(m): 11:17am On Sep 14
cry cry cry cry
4months down the line...
Let me update the thread
Re: Solar Energy Logbook. by Obnoxious2001(m): 11:37am On Sep 14
May 6th 2024.
On that day, we( emeritus ,I and Solar guy)journeyed from warri to ughelli afesire precisely to install a solar water heater.

We got to the site planned the structure (we used am existing overhead tank, the owner does want anything on the roof) supervised the process.

Structure is set we head back to base to prepare for the installation proper

1 Like

Re: Solar Energy Logbook. by Obnoxious2001(m): 12:09pm On Sep 14
May 8th 2024
We commence the installation of the accessories (the heating element) And fixing the housing etc.

The job requires careful maneuver and mind to work at height grin grin grin grin.
This particular site had a lot of wind and breeze son of Man was very careful grin grin grin grin grin

Feed your eyes and ask questions if you have any

1 Like

(1) (2) (3) (Reply)

Beat. By. Dr Dre ( Monster ) / Brand New Opened, Unlocked Iphone 4s For Sale / Macbook Screen At Very Reduced Price

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 55
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.