Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 2:15am On Nov 12, 2014 |
mufutau55: They are Iron benders, carpenter, electrician apprentices, hawkers and BIG BOYS who came to share part of the national cake. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by mufutau55(m): 2:20am On Nov 12, 2014 |
NairaBaba: Aha! Ajelojuoniles? Hajji M. 1 Like |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by agarawu23(m): 11:26am On Nov 12, 2014 |
mufutau55:I av been following and its a nice job. can I get the estimte of building 2 bedroom 8 flat, 4 down and 4 up. two toilet in each. I will b glad if I can get reply from Nairababa, hajji and all the builders in the house. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by spyder880(m): 12:58pm On Nov 12, 2014 |
@ NairaBaba, this is a very good one, keep up the good work, I will be following and enjoying this. Any reasons why they didn't put a decking beam before the slab? I also noticed that there were no reinforcement rods on top of some block walls, Maybe engineers recommendation? |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by kopell: 3:16pm On Nov 12, 2014 |
Man I'm late in this class, I will take time to study your pattern. I most contend you in the way you manage the budget of this project. Well done good job. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 9:57pm On Nov 12, 2014 |
spyder880: As I said in one of the earlier posts, at the start of the project I left many decisions making to the supervising building contractor ( some say engineer). With no previous experience in house building, many decisions were taken by the supervising building contractor. With your years of contact with ''building contractor'' by trade and practice, they keep telling you number of houses they built in Victoria Island, Maryland , Yaba, Gbagada etc 30 years ago and still standing. The building contractor said it is of no need since it one story building. But my subsequent project already on the way will have decking beam to cap all the block walls and connect column to column. Let me say hear most of what I know of house building is from Nairaland Property section and this very project. In the picture ( another project coming ) below, I told the same building contractor to cast all the foundation block walls at DPC level. I got this idea from one of the building Gurus on this forum. Initially the builder said no need, I insisted and he agreed with me ( I pay the bill ---Joking ). For this reason I employ us all to encourage positive critique of building projects on the forum especially when it is being done by practicing building professionals, many of them on this forum. I will not mention names. 3 Likes
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 10:07pm On Nov 12, 2014 |
FastShipping: FastShipping: Building One------21.75M By 8.425M Building Two------15.775M By 4.975M Note. The dimensions were given in millimeter on the plan, I converted them to meter. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by mufutau55(m): 10:24pm On Nov 12, 2014 |
Ride on NairaBaba, I like the way you look at things... We are all learning, and that process never stops or end. Your explanation is very genuine. Thank you. Hajji M. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by Judest007: 10:48pm On Nov 12, 2014 |
Nairababa, Congrats, ekwu ise! Well documented, just like Spyder880. I enjoyed the thread and all it has to offer. @ Hajji, keeping doing the good work |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by KolaShangOne(m): 11:33pm On Nov 12, 2014 |
Good evening, just for learning o.. I was about asking why there are no beams connecting columns to columns. It helps to transmit load. Secret beams are just meant to support the main beams when there's a big panel with no beams. Besides, the secret beams don't look like they connect with each other. Very good cost management doing both slabs same day. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by Nobody: 3:35am On Nov 13, 2014 |
NairaBaba: NairaBaba@ What is the cost of this decking ( Building One Only ) You are doing a nice job I love this, very neat, accurate and professional |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 6:50am On Nov 13, 2014 |
allen0000: We decked the two buildings together the same day. The total cost of decking is 2.8M, building One is twice the size ( surface area ) of building Two. Thus you estimate the cost of decking building One as 2/3 of the total cost. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by spyder880(m): 6:58am On Nov 13, 2014 |
NairaBaba: You sound like a very honest man. You are doing good, keep it up brother. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 7:38am On Nov 13, 2014 |
agarawu23: As I said earlier, I am a mechanical engineer practicing in another industry, building professionals on this forum can help. If you can follow and study more building projects on this forum you definitely get some ideas. You can e-mail me for all the detailed costs of this project, I will send you the notepad where I recorded all the expenditures. 1 Like |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by Nobody: 8:42am On Nov 13, 2014 |
NairaBaba: Please, how many tonnes are these heaps of granite? 30 tonnes?
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 12:14pm On Nov 13, 2014 |
fem30:The total granite bought was 8 trips of 15 tonnes tipper. I.e 8 X 15 tonnes = 120 tones. The estimated granite needed for the decking was 6 X 15 tonnes = 90 tones. We decided to buy 30 tonnes excess to be used later because price was less when buying more. After the decking we had more than 30 tonnes left. Note------- The so called 15 tones ford tippers are actually less than 15 tonnes . A supplier once confided in me that they are 14 tonnes if loaded fully at Quarry and delivered the way it was loaded. Many suppliers are cheat, they secretly off load part of what was loaded from Quarry and show you waybill of 15 tonnes. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 10:32pm On Nov 13, 2014 |
Stage Three-------------------Setting out
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 11:03pm On Nov 13, 2014 |
Block walls
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 11:17pm On Nov 13, 2014 |
Lintel
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 11:52pm On Nov 13, 2014 |
More
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 12:01am On Nov 14, 2014 |
Suspended Slab for Kitchens and water tanks.
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 12:15am On Nov 14, 2014 |
More
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by Nobody: 12:17am On Nov 14, 2014 |
NairaBaba: Thanks man. You are the bomb! |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 12:34am On Nov 14, 2014 |
More Pictures
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 12:43am On Nov 14, 2014 |
Roofing of the buildings would be done next year, God willing. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by mufutau55(m): 12:48am On Nov 14, 2014 |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by Nobody: 1:01am On Nov 14, 2014 |
NairaBaba: Good job and what is the cost of this upper floor ( 4 flats) |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by Nobody: 8:23am On Nov 14, 2014 |
mufutau55:lol...u understand what I meant baba. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 8:28am On Nov 14, 2014 |
Building One plan 2 Likes
|
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by mufutau55(m): 11:56am On Nov 14, 2014 |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by agarawu23(m): 6:31am On Nov 15, 2014 |
nairababa is the space left for water tank not too big or there is other uses? yu can drop your email for the building stuff I asked u about. |
Re: Construction Of Six Flats Of 2-bedroom With Three Shops. by NairaBaba: 3:39pm On Nov 15, 2014 |
agarawu23: The suspended slab or decking for the water tank ( top of left staircase only ) is sized for maximum of three tanks for building One and two for building Two, we intend to install two tanks for each building. There will be no tank on the kitchen decking , we decked the kitchen solely for fire outbreak protection. Kitchens being the most likely place building fire often occur. The kitchen suspended slabs would be roofed as if no decking were there. On the email, I have sent you PM through Nairaland . I will send you the detail and email address when we are connected. Please check your inbox. 1 Like 1 Share |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)
Photos From The Building Collapse In Lekki, Lagos This Morning / How Many Wheelbarrow Of Sand, Granite And Bag Of Cement Are In A Cubic Meter? / CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 50 |