Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) - Politics (2) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) (34795 Views)

David Mark Drives Through Loko-Oweto Road To Otukpo As Project Nears Completion / Babatunde Fashola Inspects The Dualization Of Lokoja-Benin Road (Photos) / Fashola Inspects Wharf Road, Apapa, Other Selected Roads In Lagos (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by Nobody: 7:42pm On Jun 18, 2016
GEJ thank you for initiating this project.
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by iyke484real(m): 7:44pm On Jun 18, 2016
adeyemi2015:
Fashola is the best among the Ministers. It baffles me whenever the Cockroaches are abusing or cursing him for the menace caused by the Avengers.
You need Fuel to power Generator, same as the Turbines, you need Gas to power them. Fash can fix electricity, but the Avengers ain't gonna make it work and stable!
FYI..... the Cockroaches, BRF will be the best Minister ever in the History of Nigeria by 2018.
mark my words!
my dear what has he done that makes him better than others for ordinary inspection of a job baa The earlier we stop celebrating mediocracy the better for us all.

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by tbaba1234: 7:46pm On Jun 18, 2016
rotimileke:
GEJ thank you for initiating this project.

The Loko Oweko bridge was started in 2005. It was expected to be completed by 2007.

2016, we are still building the bridge.

It was not 'initiated' by GEJ.

https://structurae.net/structures/benue-bridge

12 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by iamlimo(m): 7:48pm On Jun 18, 2016
tbaba1234:


23 out of the 26 power plants in Nigeria are gas powered.

Power plants take time to build. You can not be blowing gas pipelines and expect power.

It is not Fashola's fault that we are so dependent on gas.
so... isn't it time we started translating from depending solemnly on power plants that rely on gas. I mean I feel fucking irritated well you make ppl think that getting stable electricity or energy is a fucking big deal. I knw of an engineering student that powered my hostel then with a fucking truck battery. We paid N500 per month for maintenance. The Bleep is so difficult in generating power when apple factories in China rely on solar energy to power their factories; Wtf is so difficult about generating power!
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by diegwu01: 7:50pm On Jun 18, 2016
tete7000:


Oga part of apc promises is that Buhari will end vandalism of our pipelines when Jonathan administration gave the same excuse for incessant power interruption. Therefore they can't use vandalism as excuse for current blackouts. Buhari as they claimed will do should kill all vandals and end destruction of our pipelines. Na their mouth they use talk am, blame them
Negotiations in Progress..we will get there
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by diegwu01: 7:53pm On Jun 18, 2016
iamlimo:

so... isn't it time we started translating from depending solemnly on power plants that rely on gas. I mean I feel fucking irritated well you make ppl think that getting stable electricity or energy is a fucking big deal. I knw of an engineering student that powered my hostel then with a fucking truck battery. We paid N500 per month for maintenance. The Bleep is so difficult in generating power when apple factories in China rely on solar energy to power their factories; Wtf is so difficult about generating power!
Should we remain in Darkness while the Alternatives are provided?

3 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by unite4real: 8:04pm On Jun 18, 2016
that oyinbo man with fashola in the first picture. THE NOSE.

1 Like

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by gebest: 8:04pm On Jun 18, 2016
Stingman:


****.Did Fashola start the bridge? What budget did he use to start it and brought it to this level? The same way you would say that the Abuja-Kano speed train is built by Amaechi. Maggots should learn to give credit to the right people that deserve it...
e pain am
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by ibrokola(m): 8:04pm On Jun 18, 2016
bangiskings:
with this road abuja to Enugu will take me only 2:30 min God bless pmb
Bro how true is this?
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by iamlimo(m): 8:06pm On Jun 18, 2016
diegwu01:
Should we remain in Darkness while the Alternatives are provided?
Thanks for the moronic question. But what the Bleep do you have now? stable power supply and not darkness?
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by amtaken(f): 8:06pm On Jun 18, 2016
Is that not Fashola the Minister of darkness?

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by seguno2: 8:06pm On Jun 18, 2016
bangiskings:
with this road abuja to Enugu will take me only 2:30 min God bless pmb

Do you know the meaning of RESUME work on the bridge?
Someone STARTED the work, right?
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by tbaba1234: 8:08pm On Jun 18, 2016
seguno2:


Do you know the meaning of RESUME work on the bridge?
Someone STARTED the work, right?

Obasanjo started work in 2005, so what??

2016, it has not finished..

4 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by cashkid: 8:08pm On Jun 18, 2016
iamlimo:

just keep your mouth shut thr and stop talking like a foolish yoruba man. Ain't there other means of generating energy, i mean clean source of energy; renewable nd efficient. you're thr talking thrash about the avengers and relying on just gas! Ode.


its u that should shut that gutter u called mouth, dindinrin owo e, why u no give this foolish advise of urs to the last adminstration? oponu afofun gbemu..........

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by Nobody: 8:14pm On Jun 18, 2016
PassingShot:

I laugh when some of you sore losers make comments.

Did GEJ start the Abuja-Kd speed train project? Answer is No. It was started by OBJ but the IB couldn't even complete it.

This one, was it started by the Ineffectual Buffoon? The answer is a resounding NO.

The IB was a sleeping duck who knew NOTHING about governance. He left Nigeria worse off than he met it.
It is buhari that is leaving Nigeria worst than he met it. Have you ever bought 5 five for 450 naira before?
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by iamlimo(m): 8:14pm On Jun 18, 2016
cashkid:



its u that should shut that gutter u called mouth, dindinrin owo e, why u no give this foolish advise of urs to the last adminstration? oponu afofun gbemu..........
repping your tribe
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by cashkid: 8:16pm On Jun 18, 2016
iamlimo:

repping your tribe
yeah, as u have bn repping ur own.

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by oshaosha2014(m): 8:17pm On Jun 18, 2016
Guys, what do we all want - Development. If one government didn't finish a project and the next one comes to finish it, it is our money they are using not from their personal purse. So, I see no reason why we should be differentiating on who works or didn't work. Governments will come and go, they are all here to serve us. Leave the past alone. What we have now is buhari government. Any project this govt commissions, all we can do is encourage them so they can do more, and not taking us back to the past. Many project this administration will not finish which the coming administration will commission.

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by iamlimo(m): 8:18pm On Jun 18, 2016
cashkid:
yeah, as u have bn repping ur own.
Douche
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by erico2k2(m): 8:26pm On Jun 18, 2016
adeyemi2015:
Fashola is the best among the Ministers. It baffles me whenever the Cockroaches are abusing or cursing him for the menace caused by the Avengers.
You need Fuel to power Generator, same as the Turbines, you need Gas to power them. Fash can fix electricity, but the Avengers ain't gonna make it work and stable!
FYI..... the Cockroaches, BRF will be the best Minister ever in the History of Nigeria by 2018.
mark my words!
Sometimes its not good to display childishnes in an arina full of elders
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by Nobody: 8:31pm On Jun 18, 2016
see my guy is looking skinny. Only one man occupying several ministerial posts. I wish him well

1 Like

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by erico2k2(m): 8:31pm On Jun 18, 2016
Na so one minister go comision trains wey he call garbage during campaign grin grin grin
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by push23: 8:33pm On Jun 18, 2016
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by muyibaba222(m): 8:34pm On Jun 18, 2016
iamlimo:

just keep your mouth shut thr and stop talking like a foolish yoruba man. Ain't there other means of generating energy, i mean clean source of energy; renewable nd efficient. you're thr talking thrash about the avengers and relying on just gas! Ode.

Lolz....... and you want d other means to start function within six months of his stay in office when there are no infrastructures laid down for them. Think well. its time to get over election loss........ start thinking on how to win next election if u are pained by d lost.

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by olaolaking: 8:37pm On Jun 18, 2016
iamlimo:

just keep your mouth shut thr and stop talking like a foolish yoruba man. Ain't there other means of generating energy, i mean clean source of energy; renewable nd efficient. you're thr talking thrash about the avengers and relying on just gas! Ode.
You are more ode here. So renewable energy that will be enough to cater for the whole country is a 3 bedroom flat that can ready in 3 months

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by olaolaking: 8:41pm On Jun 18, 2016
muyibaba222:


Lolz....... and you want d other means to start function within six months of his stay in office when there are no infrastructures laid down for them. Think well. its time to get over election loss........ start thinking on how to win next election if u are pained by d lost.
Don't mind him. Let him continue to fume. Very unreasonable human being

2 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by ashjay001(m): 8:49pm On Jun 18, 2016
iamlimo:

just keep your mouth shut thr and stop talking like a foolish yoruba man. Ain't there other means of generating energy, i mean clean source of energy; renewable nd efficient. you're thr talking thrash about the avengers and relying on just gas! Ode.

Oga sensible Ipod man, so it takes less than a year to switch from gas powered to a renewable source?

Chill, d same way u thought they couldn't win, is d same way they'll accomplish great tins in this country!

6 Likes

Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by Deen77: 8:49pm On Jun 18, 2016
VictorYattLasT:
No matter your love to them, thank them when they are on the right path, Caution them when they are wrong path, That is only way to build good governance, and to you guys their is no probability that the bridge ll be completed in dis tenure..

If this government can complete this with Lagos Ibadan express road and Oyo Ogbomosho express ( since OBJ). Then Sagamu Ore portion. Work is going on along Ilorin Jebba road.

I pray d next three years, all this deliver.
Re: Fashola Inspects Resumed Work On Loko-oweto Bridge Over River Benue(photos) by kolaaderin: 8:50pm On Jun 18, 2016
iamlimo:

just keep your mouth shut thr and stop talking like a foolish yoruba man. Ain't there other means of generating energy, i mean clean source of energy; renewable nd efficient. you're thr talking thrash about the avengers and relying on just gas! Ode.
And why does ur PDP failed for 16 years to explore the other means and u want this government to have completed same in just a year. Be constructive for once, this government only deserves ur criticism after a minimum of a term in office.

3 Likes

(1) (2) (3) (4) (5) (Reply)

#nigeriadecides2023: Natasha Akpoti Loses Kogi Central Senatorial Seat To APC / How Buhari Made Northern Youths Issue Quit Notice To Igbos – Fayose / Sani Adamu: Buhari's Former Driver Begs Him For Assistance (Video)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)