Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,201,124 members, 7,977,239 topics. Date: Wednesday, 16 October 2024 at 11:20 PM |
Nairaland Forum / Nairaland / General / Properties / Minimum Days Required To Build 5 Bedroom Duplex (17509 Views)
Interested In The Cost To Build 5 Bedroom Duplex (250 Sqm) In Orlu, Imo State / ROOF CALCULATOR METRIC. Know The Amount REQUIRED To Roof Your House. Take A Look / Cost To Build 5 Bedroom Bungalow With Penthouse Ibadan (2) (3) (4)
Re: Minimum Days Required To Build 5 Bedroom Duplex by ASAMPETE1: 7:06am On Jul 13, 2016 |
2 days is enough. Nonsense 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Pascal679: 7:06am On Jul 13, 2016 |
Tony2016:about 7 months it depends mostly on your financial status bro I deal on ALUMINUM windows u can contact me with 0703 183 8634 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by agarawu23(m): 7:11am On Jul 13, 2016 |
emmachukwu99:no matter how rich he is, 5bedroom duplex can't be finished within 1 month. 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by spyder880(m): 7:17am On Jul 13, 2016 |
Tony2016: 120 days if the site is accessible and the money is ready. There are some sites where the major problems will be materials delivery. You also need to have a committed team of workers who will be ready to push the work with speed and quality processes. https://www.nairaland.com/2712462/making-low-budget-5-bedroom I built this duplex in 60 days till the stage in the last picture, total cost was N7.4m or something like that. 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by DerrickzB: 7:29am On Jul 13, 2016 |
bughead: Lmaooo.. As in make e glue d roof to d buildijg abi.. lol.. i yaff die oh |
Re: Minimum Days Required To Build 5 Bedroom Duplex by bisdam9086(m): 7:44am On Jul 13, 2016 |
To start with, what is a Duplex? a duplex house is a dwelling having apartments with separate entrances for two households. This includes two-story houses having a complete apartment on each floor and also side-by-side apartments on a single lot that share a common wall. By contrast, a building comprising two attached units on two distinct properties is typically considered semi-detached or twin homes but may also be referred to as a duplex. From this you need to construct your request by removing Duplex because I do not think you plan to build a duplex. 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Stanbeto: 8:15am On Jul 13, 2016 |
Oluwa answer my Call o |
Re: Minimum Days Required To Build 5 Bedroom Duplex by asaju10(m): 8:30am On Jul 13, 2016 |
NinaMiliano:Boss u must be kidding |
Re: Minimum Days Required To Build 5 Bedroom Duplex by airsaylongcon: 9:04am On Jul 13, 2016 |
emmachukwu99: A duplex ready in one month? You need at least 21 days for the decking to cure! 3 Likes |
Re: Minimum Days Required To Build 5 Bedroom Duplex by airsaylongcon: 9:05am On Jul 13, 2016 |
NinaMiliano: Absolutely NO WAY a duplex can stand in 30 days. 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by airsaylongcon: 9:08am On Jul 13, 2016 |
n3xt: By slab I presume you are talking of the decking between ground floor and upper floor. 8 days? Please how long does concrete take to reach maximal strength? 1 Like 1 Share |
Re: Minimum Days Required To Build 5 Bedroom Duplex by airsaylongcon: 9:10am On Jul 13, 2016 |
agarawu23: We may differ on politics o, but right here we are aligned. Now I know why buildings collapse left right and centre in the country |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Cornerstone001: 9:22am On Jul 13, 2016 |
Call me +234- 813- 834- 26- 42, I can help you with the roofing aspect. These are some of our previous works. www.nairaland.com/attachments/3081041_puig1_jpege71e6d794219466a439f483235bd7f7b www.nairaland.com/attachments/3179070_hed19_jpegc4237df29220c6cbcfc0fc8eb01fee6e www.nairaland.com/attachments/3205278_nihfh14_jpeg7bdc9b5c42975ffa6400c7b9bf26fb64 |
Re: Minimum Days Required To Build 5 Bedroom Duplex by adebaxton(m): 9:22am On Jul 13, 2016 |
Tony2016:Well Finished in 4 months depending on availability of fund. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Re: Minimum Days Required To Build 5 Bedroom Duplex by PrinzeTokz: 9:29am On Jul 13, 2016 |
With the latest technology in town, 3 days is OK... Everything is precasted and assembled, before you know it, your building is Ready... |
Re: Minimum Days Required To Build 5 Bedroom Duplex by blackprowler: 9:41am On Jul 13, 2016 |
nijanigga: Lef dem alone. Make una keep borning multiple children and the population keep rising exponentially while everyone wants to build 5-bedroom duplex. One day una go eat the buildings or kill fellow human being chop. Na small small and mumus can't see beyond their noses. One day in the distant future, our 20th, 30th generation offspring will curse us for being so foolish. KEEP BORNING CROWD, UNA HEAR! |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Trunaijian: 9:48am On Jul 13, 2016 |
Op your wuestion is vague. To get proper estimated times you jave to be a lil more specific. eg. Design of building, plot size, size of structure, finishing materials (tiles-wall pr otherwise, screeding, pop or pvc, botehole drilling or water reticulation, roofing type- decking or stone coat, fenced or unfenced, etc. When an engineer gets this info he or she would be able to give you a more realistic time frame. Ps. In.most cases what delays constructuon work is availability of funds. |
Re: Minimum Days Required To Build 5 Bedroom Duplex by 400billionman: 10:23am On Jul 13, 2016 |
herzern: Wait, you will need cement as well as sand. Okay. For the poster @tony2016, assuming you have all the money sitting in your account, things that slow down work at site is finished materials awaiting supply. Assuming your sand or stone or tank water finishes today and your suppliers says it will arrive tomorrow evening, it means tomorrow's work is cancelled. 4 months is very enough to complete a duplex with all accessories. I have seen a bungalow completed in 10 weeks with fencing and borehole . It takes good planning. |
Re: Minimum Days Required To Build 5 Bedroom Duplex by 400billionman: 10:24am On Jul 13, 2016 |
emmachukwu99: I tell you.. 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by goodgate: 10:53am On Jul 13, 2016 |
Barselonia:Goodmorning,how long will it then take to complete(from foundation to finishing)of a bungalow-like church hall on 350sqm? |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Lanre4uonly(m): 11:18am On Jul 13, 2016 |
Availability of cash would definitely dictate that. Kindly contact me when your project get to the roofing stage for the latest quality stone coated roofing tiles. You can as well check my signature below to view some of our completed roofing projects spread all across Nigeria. All the best ahead OP. |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Reference(m): 11:36am On Jul 13, 2016 |
The 'Time of Completion/Duration of the Project' is determined by the 'Programme of Works' which is in turn heavily influenced by the various schedules and specifications. In a 'nutshell' a project's duration is determined by how 'detailed' it is. In a groundnut seed, if you can view your project with a binoculars it shouldn't take long, but if you need a microscope it can take almost forever. There are five bedroom duplexes that can be built in 4 months while others may require 4 years of uninterrupted construction. Naturally both are incomparable and unrecognisable. And by the way if you want certain original handcrafted Chinese sculpture, ornaments and tapestry you may have to wait 40 years while they study the lost art and another 40 years to recreate them. |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Reference(m): 11:44am On Jul 13, 2016 |
400billionman: Yeah, I call them portakabins, not houses. |
Re: Minimum Days Required To Build 5 Bedroom Duplex by gbaskiboy: 12:00pm On Jul 13, 2016 |
herzern:you'll not use cements, what you'll use is mud |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Barselonia(m): 12:45pm On Jul 13, 2016 |
goodgate: just say 60 to 70 days... because d finishes is d main work... 1 Like |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Tony2016: 1:40pm On Jul 13, 2016 |
NinaMiliano: Thanks to everyone that responded to this post. Complete fund is ready for the project. The location will be at Ilesa, Osun State. I will prefer maximum of 45 days. Analysis on how this project could be achieved in 45 days will be appreciated. Thanks. |
Re: Minimum Days Required To Build 5 Bedroom Duplex by Tony2016: 1:52pm On Jul 13, 2016 |
Thanks to everyone that responded to this post. Complete fund is ready for the project. The location will be at Ilesa, Osun State. I will prefer maximum of 45 days. Analysis on how this project could be achieved in 45 days will be appreciated. Thanks. |
Re: Minimum Days Required To Build 5 Bedroom Duplex by jossy26: 2:20pm On Jul 13, 2016 |
n3xt: Is there no provision for concrete to cure for 28days after slab work? 1 Like 1 Share |
Re: Minimum Days Required To Build 5 Bedroom Duplex by dododawa1: 2:27pm On Jul 13, 2016 |
Oga HIRE civil engineer or builder,don't lookvfor sharp corner |
Re: Minimum Days Required To Build 5 Bedroom Duplex by tevanso(m): 2:30pm On Jul 13, 2016 |
if ur fund is ready ,i bet u in 90 days ,ur building will be delivered |
Re: Minimum Days Required To Build 5 Bedroom Duplex by waldigit: 3:57pm On Jul 13, 2016 |
Tony2016:1st I will say location, finance, social environment, weather, etc but technically with other factors remaining the same I can say bw,, 4 to 6 months. for example we are 3 days today in picture attached from doc level. it is 3brm.
|
Update On Enugu Centenary, Lifestyle And Golf Course City / HOW TO PATTERN YOUR FLOOR AND WALL TILES @epic_ceramics / Cost Of Rent Around Delta| Co-tenant
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38 |