New Construction Of 8 Flats Of 2 Bedrooms - Properties (6) - Nairaland

Nairaland Forum / Nairaland / General / Properties / New Construction Of 8 Flats Of 2 Bedrooms (24685 Views)

NEW Construction - 3 Bedroom Bungalow - Executive Design / New Construction Of A Block Of 6 Flats Of 2 Bedrooms In Enugu East. / New 8 Flats Of 3 Bedrooms Construction In Enugu City (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (Reply) (Go Down)

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 6:22am On Feb 19, 2017
We are starting to form the walls for the two flats, while also hanging the reinforcement columns same time........

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 6:24am On Feb 21, 2017
second day of forming the walls, now ready for the lintels.....

Re: New Construction Of 8 Flats Of 2 Bedrooms by chidexy(m): 7:25pm On Feb 23, 2017
Oga Spyder, great job you are doing. The building is coming out fine. Jisie ike

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 6:16am On Feb 24, 2017
chidexy:
Oga Spyder, great job you are doing. The building is coming out fine. Jisie ike

Nwanne, thank you. More pictures later today.
Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 6:38am On Feb 25, 2017
Carpentry form work for the lintels...........

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 6:39am On Mar 01, 2017
We march on, I want to be on the third decking by weekend.

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 5:39am On Mar 04, 2017
We have started the 3rd decking for this building, my men are all here working now.
Re: New Construction Of 8 Flats Of 2 Bedrooms by adewaleID: 8:47pm On Mar 06, 2017
Good work, excellent speed and praying for you as always.

You have kept the ppties section going lol. Pls ping me an estimate for electrical and plumbing for one of the deckings. I need it as a guide,pls tell your boys (both plumber and electrician to do us a favour ) we love their work.

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 9:21pm On Mar 08, 2017
This was how the decking platform looked like yesterday, we are already reinforcing the deck with iron rods today.

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 9:29pm On Mar 08, 2017
We bought the reinforcement rods today...........

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 9:36pm On Mar 08, 2017
By tomorrow, we are going to get rocking on the decking beams..........

Re: New Construction Of 8 Flats Of 2 Bedrooms by mufutau55(m): 9:46pm On Mar 08, 2017
spyder880:
We bought the reinforcement rods today...........

Ha! "Owo repete" abi nah "Otutu Ego". smiley Make God help us in Naija o.

Hajji M.
Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 10:02pm On Mar 08, 2017
mufutau55:


Ha! "Owo repete" abi nah "Otutu Ego". smiley Make God help us in Naija o.

Hajji M.

You are right Sir, I was happy as iron rods started to drop in prices this week, I saved N90,000 from what I would have paid for this supply if I bought this last week.

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by mufutau55(m): 10:08pm On Mar 08, 2017
spyder880:

You are right Sir, I was happy as iron rods started to drop in prices this week, I saved N90,000 from what I would have paid for this supply if I bought this last week.

Glad to hear the price is dropping. Continue doing your usual good work. Thanks.

Hajji M.

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 7:29am On Mar 29, 2017
We continue with the work here, now we are laying the 3rd floor walls.........

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 4:18am On Mar 31, 2017
Progress...... 3rd floor walls going up.

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 7:01am On Apr 02, 2017
lintel form work in progress here............

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 8:58am On Apr 06, 2017
Ready to cast the lintels and columns.............

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 5:35am On Apr 08, 2017
Operating from the top of this building, cast the lintels and .........

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 5:40am On Apr 08, 2017
Laying the final blocks before the roofing of the house............

Re: New Construction Of 8 Flats Of 2 Bedrooms by Badgers14: 10:50am On Apr 08, 2017
spyder880:
Ready to cast the lintels and columns.............

Oga spyder do you mind sharing approximately how much money got this house to this level?

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 9:38pm On Apr 08, 2017
Badgers14:


Oga spyder do you mind sharing approximately how much money got this house to this level?

About N19.8m so far. All materials, all labor, all supervision and logistics included.

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by mufutau55(m): 2:03am On Apr 09, 2017
spyder880:

About N19.8m so far. All materials, all labor, all supervision and logistics included.

Not bad at all... Only Spyder "The Man".....

Hajji M.

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by mufutau55(m): 2:04am On Apr 09, 2017
spyder880:

About N19.8m so far. All materials, all labor, all supervision and logistics included.

Not bad at all. Only Spyder "The Man".......

Hajji M.

2 Likes

Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 7:13am On Apr 09, 2017
mufutau55:


Not bad at all. Only Spyder "The Man".......

Hajji M.

Thank you Sir.

1 Like

Re: New Construction Of 8 Flats Of 2 Bedrooms by Teddyblk1: 11:52pm On Apr 11, 2017
spyder880:
Getting ready for the setting out.

Hey spyda880 can i send you drawing for a foundation quote? Yusufftunde1973 at gmail.com
Re: New Construction Of 8 Flats Of 2 Bedrooms by Teddyblk1: 11:52pm On Apr 11, 2017
Hey spyda880 can i send you drawing for a foundation quote? Yusufftunde1973 at gmail.com
Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 5:38am On Apr 12, 2017
Teddyblk1:
Hey spyda880 can i send you drawing for a foundation quote? Yusufftunde1973 at gmail.com

That will be tough, I have too many drawings pending for quotes on my table and not enough time to attend to all of them now. Please bear with me.
Re: New Construction Of 8 Flats Of 2 Bedrooms by Teddyblk1: 5:47pm On Apr 12, 2017
spyder880:


That will be tough, I have too many drawings pending for quotes on my table and not enough time to attend to all of them now. Please bear with me.
help me look at this BILL OF QUANTITIES FOR THE CONSTRUCTION OF A RESIDENTIAL BUILDING . STAGE 1(FOUNDATION WORKS TO GERMAN FLOOR)




MATERIALS :

1. 2500blocks @200/vibrated sandcrete block =#500,000

2. 450bags of cement @2600/bag =#1,170,000

3. 120tonnes of sharp sand @#35,000/20tonnes =#210,000

4. 120tonnes of granite @#95,000/30tonnes =#380,000

5. 35lengths of 16mm @#5000 =#175,000

6. 35lengths of 16mm @#2300 =#80,500

7. 18lengths of 8mm @1350 =#24,300

8. 40kg binding wire =#16,000

9. 1bag of 3" nail =#7,500

10. ¼bag of 2" nail =#2,500

11. 240tonnes of laterite @#20,000/20tonnes =#240,000

12. 40lengths of board @#1300 =#52,000

13. 20lengths of 2x2 soft wood @#200 =#4,000

14. Plumbing materials for STAGE 1 =#55,000

15. Profile materials =#30,000

16. Water =??




HANDLING

17. Cement =#50,000

18. Iron rods =#12,000

19. Boards and plumbing materials =#8,500




TOTAL =#3,017,300




LABOUR =#1,065,200




GRAND TOTAL =#4,082,500\
foundation footing is 9"
Re: New Construction Of 8 Flats Of 2 Bedrooms by InvertedHammer: 1:24pm On Apr 13, 2017
Teddyblk1:

help me look at this BILL OF QUANTITIES FOR THE CONSTRUCTION OF A RESIDENTIAL BUILDING . STAGE 1(FOUNDATION WORKS TO GERMAN FLOOR)




MATERIALS :

1. 2500blocks @200/vibrated sandcrete block =#500,000

2. 450bags of cement @2600/bag =#1,170,000

3. 120tonnes of sharp sand @#35,000/20tonnes =#210,000

4. 120tonnes of granite @#95,000/30tonnes =#380,000

5. 35lengths of 16mm @#5000 =#175,000

6. 35lengths of 16mm @#2300 =#80,500

7. 18lengths of 8mm @1350 =#24,300

8. 40kg binding wire =#16,000

9. 1bag of 3" nail =#7,500

10. ¼bag of 2" nail =#2,500

11. 240tonnes of laterite @#20,000/20tonnes =#240,000

12. 40lengths of board @#1300 =#52,000

13. 20lengths of 2x2 soft wood @#200 =#4,000

14. Plumbing materials for STAGE 1 =#55,000

15. Profile materials =#30,000

16. Water =??




HANDLING

17. Cement =#50,000

18. Iron rods =#12,000

19. Boards and plumbing materials =#8,500




TOTAL =#3,017,300




LABOUR =#1,065,200




GRAND TOTAL =#4,082,500\
foundation footing is 9"

Items 5 and 6 ?
Re: New Construction Of 8 Flats Of 2 Bedrooms by Nobody: 5:06pm On Apr 14, 2017
InvertedHammer:


Items 5 and 6 ?

lol...they wan catch am Mugu...for those who dont read grin grin grin
Re: New Construction Of 8 Flats Of 2 Bedrooms by spyder880(m): 9:52pm On Apr 15, 2017
Working to complete all works here before the roofing........

(1) (2) (3) (4) (5) (6) (7) (8) (Reply)

Which Is The Tallest Building In Lagos? / A Dairy Of My 1st Building Project / Prices Of Land In Lekki Increase By 500% In Just Five Years

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 34
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.