Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,211,023 members, 8,010,668 topics. Date: Saturday, 23 November 2024 at 03:53 AM |
Nairaland Forum / Nairaland / General / Politics / Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government (10250 Views)
Tribute To Tolulope Arotile, By Goodluck Jonathan / Emmanuel Oscar And Yohanah Kilus Executed By Boko Haram In Borno / ‘My Transition Hours’ A Book By Goodluck Jonathan (2) (3) (4)
(1) (2) (3) (4) (Reply) (Go Down)
Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 9:37am On Oct 20, 2017 |
List of Federal Government's completed proJects across 36 States of Nigeria executed by President Goodluck Jonathan till date. Image KEBBI STATE: * Establishment of new Federal University at Kalgo * SURE P Project on Primary Health Care * Construction of Almajiri school * Provision of Improved Cotton seedlings free of charge for farmers * Establishment of CBN cash office * Building of Silos * Establishment of a federal FM Radio * Railway line * Rehabilitation of federal roads * Construction of new Library in Federal Unity Schools * Construction of expert Crop Preservation & Conditioning Centre * Construction of Silos (100,000 metric tones capacity) JIGAWA STATE: * Establishment of new Federal University in Dutse * Construction of Almajiri schools * Establishment of a Federal Polytechnic * Construction of a Laboratory blocks in Jigawa State Polytechnic Dutse * Flood Victims Palliative Scheme * Dry Farming Project * SURE – P Projects on Primary Health Care * Construction of new Library in Federal Unity Schools * Desertification Control Project: Establishment of 15 Row Green Belt(80Km) and Presidential Initiative on Afforestation Program KADUNA STATE: * Rail line Zaria/Kaura Namoda rail route * Abuja – Kaduna rail line * Kaduna Airport remodelled * Kaduna Refinery rehabilitation after 15 years * SURE – P Projects in the State Almajiri Schools * Free improved Cotton Seedlings for farmers * Dry Season farming Project * Construction of new Library in Federal Unity school * Revival of the Nigerian Textiles PLC Kaduna and its employees re-engaged. * Construction of Expert Preservation & Conditioning Centre * Ongoing work in Gurara Waterfalls and irrigation projects * Ongoing Kafanchan 2 x 60 MVA 32/33KV substation, Kaduna – Jos 330kv Double – Circuit Line, 2 x 330KV Line Bays Extension at Kaduna * Kaduna Power plant – Mando Road 330kv Double – Circuit Transmission Line and Substation Extension at Mando Road substation 2nd Kaduna – Kano 330KV Double – Circuit Transmission Line * Ongoing 2 x 60 MVA, 132/33KV Substations at kwoi and Kachia * Establishment of a division of the National Industrial Court in Kaduna * Construction of a Storey cell block in Kaduna Prison * Rehabilitation of Agric Skills Training Centre * Federal Government College Rabah Road. Kaduna laboratory refurbished. * Galma Dam Water supply Kaduna State. KANO STATE: * Construction of new Airport Terminal/upgrading * Provision of Railway Train Services (Lagoa – Kano) * Upgrading Nigerian Police Academy in Wudil to a University Status * Rehabilitation of Kano – Kastina Federal Road * Rehabilitation of 510Km Kano – Maiduguri Road * Construction of Almajiri schools * Desertification Control Projects * Construction of new Library in Federal Unity school * SURE – P project on Primary Health Care * Dry Season Farming Projects * Ongoing 1 x 30MVA, 132/33kv substation at Wudil Kano State. Kano – Katsina 330KV Double – Circuit Transmission Line and 2 x 60MVA, 132/33KV Substation at Dambatta, Kano state * Rehabilitation and Re -commissioning of the NNPC depot in Kano. * Construction of a storey block for 212 inmate at Kano Central Prison * Establishment of 80 Km of 15– row Green Belt and the Presidential Initiative on Afforestation in Kano and other 10 Northern States. ZAMFARA STATE: * Rehabilitation of Funtua – Gusau – Sokoto Road * Establishment of a new Federal University Gusau in January 2013 Almajiri |Schools construction * SURE- Projects on Primary Health Care (PHC) * Dry season farming Project * e-wallet System for farmers * Construction of new Library in Federal Unity school * Rehabilitation of Namoda Jiba Road Section iv in Zamfara State * Rehabilitation of Dangulbi Road in Zamfara, Mainchi – Anka Daki Takwa Road * Construction of Silos (100,000 metric tons capacity) * Rehabilitation of the NNPC Depot in Gusau * Construction of Agricultural Skills Training Centre * Establishment of Cancers treatment Centre at the Federal Medical Centre Gusau SOKOTO STATE: * Lagos – Sokoto Railway Project approved March 2014 * Rehabilitation of Funtua – Gusau – Sokoto Road * Dry Season farming Project * Construction of Almajiri schools * Provision of Improved Cotton Seedlings free of Charge for farmers * Desertification Control Project: Presidential Initiative on Afforestation * Relief ( Palliative Scheme) for flood victims * SURE P Projects on Primary Health Care * Construction of new Library in Federal Unity schools * e- wallet System in the distribution of farming inputs supply * Rehabilitation of the Shagari irrigation Project * Rehabilitation of Sokoto Airport * Construction of Silos (100,000 metric tones capacity) * Goronyo Dam Emergency Spill Repairs (Water Supply) Sokoto KATSINA STATE: * Establishment of a new Federal University in Dutsin-ma Katsina State * Construction of Almajiri Schools ( Modern Tsangaya School System) * e- wallet System for farmers * Free improved Cotton Seedlings for farmers * Rehabilitation/ consruction of Kano – Kastina Road * Rehabilitation of Kastina – Daura Road * Dry Season Farming Project * SURE P Project on Primary Health Care and others * Desertification Control Project * Rehabilitation of the Umaru Yar’Adua International Airport Katsina * Construction of Silos (100,000 metric tones capacity) * Construction of Kankara Gurbi road. * Ongoing Daura 2 x 30/40MVA substation and 2 x 132KV Line bay extension at Katsina. * Grid Rehabilitation and Reinforcement in Katsina Substation, Kano – Katsina 330KV Double – Circuit Transmission Line, 2 x 150MVA, 330/132KV + 2 x 60MVA, 132/33KV Substation at Katsina, Katsina – Kurfi – Dutsinma – Kankara – Malumfashi 132KV Double Circuit Line, Sub Power Stations in Kurfi (2 x 60MVA, 132/33KV), Dutsinma, Kankara and Malumfashi substation, Kumbotso (Daura) – Dambatta 132KV Line and Katsina – Daura 132KV Double Circuit Line. * Construction of a Storey building Administrative Block and 36 Units of One Bedroom at Katsina by the Nigerian Security & Civil Defence Corps (NSCDC) * Presidential Initiative on Aforestation * 80% Completion of the rehabilitation of existing infrastructure at Jibia Irrigation Projects * Construction of 10MW Wind Energy Generation Companies in Katsina NORTH CENTRAL GEO POLITICAL ZONE KOGI STATE: * Establishment of a new Federal University in Felele – Lokoja * Dualization of the 212 Km Lokoja – Abuja Road, Lokoja Okene – Benin Road * SURE – P Projects on Primary Health Care * e-wallet System for farmers in the distribution of Agricultural Inputs and Dry season Farming Projects * 434 mw Geregu Power Generating Plant ii completed and commissioned in October 2013 * Aladja – Ajaukuta Rail fixed and tested * Kogi state is one of the states proposed for the three Green Field Refineries of the NNPC in alliance with CSECC (Kogi Green Field Refinery Itobe village Kogi State) Jamata River Port at over 50% completion * Establishment/ Construction of a federal High court * Palliative Scheme for flood victims in Kogi State * Food Processing Centre with a capacity of 25,000 metric tones silos * Ongoing 2 x 60MVA, 132/33KV substation at Egbe, 2 x 60 MVA and 2 x 132KV line bays extension at Obajana, Lokoja – Obajana 330kv double – circuit line and 330/132kv substation at Obajana. * Ongoing 132/33kv substation at Ayangba, Kogi State * Construction of Lokoja River Port and Jetties at Idah NASARAWA STATE: * Establishment of a new Federal University in Lafia * Road Rehabilitation; Lafia – Makurdi Road * SURE – P Projects on Primary Health Care (PHC) * Construction of new library in the Federal Unity School * Rehabilitation /construction of Lafia – Doma road, Lafia – Obi – Awe Road , Nasarawa – Karsh – Ara Road * Construction of the Loko – Oweto Bridge linking Nasarawa and Benue States * Establishment of Central Bank Lafia * Karshi Power Transmission Station * Lafia Power Sub – Station * Doma Dam 375million cubic meters of water for irrigation * Four storey Federal Secretariat, Lafia with 402 offices constructed * Federal High Court complex constructed * Distribution of computers and internet broadband to schools * Construction of Faculty of Arts Lecture theatre in Nasarawa State University Keffi by the federal Government through the Tertiary Education Trust Fund, and the construction of the faculty of Administration lecture theatre, Faculty of Social Science lecture theatre and construction of Academic staff office complex. * The CBN intervention project in Nasarawa State University; Construction of the school of Post Graduate Studies Complex. * Construction of Export Crop preservation Conditioning Centre * Provision of Portable drinking water at Nasarawa state University Keffi * Establishment of Cancers Treatment Centre at the Federal Medical Centre Keffi * Construction of 3 MDG/NDE Skill Acquisition Centrein each of the three Senatorial Districts of Nasarawa State NIGER STATE: * Dualisation of Suleja – Minna Road * Construction of Almajiri Schools * Dry Season Farming Project * Baro Ports on Niger State which was conceived in 1954 came to live under President Jonathan * Construction of Yar’Adua Hospital for highway emergency response at Sabon Wuse Railway Line system * Rehabilitation of Federal Roads * e –wallet System in the distribution of Agricultural Inputs to the farmers * Construction of Bida – Sacci – Nupeko Road * Construction of River Ebba at Cheche, Katcha L.G. A. Area in Niger State. * Ongoing Grid Rehabilitation and Reinforcement in Kontagora Substation * Rehabilitation and re-commissioning of NNPC Depot in Suleja and Minna * Equipped Mathematics and Chemistry Laboratories at the Federal Government Academy, Suleja * Establishment of Maritime Institute at Ibrahim Badamasi Babangida University Lapai BENUE STATE: * Rehabilitation of Rail way lines * Rehabilitation of Lafia – Makurdi Road, Aliade to Uturkpo Road * SURE – P Projects in the state * Construction of new library at the Federal Government College Otobi, Benue state * Supply of new improved seedlings to boast groundnut and sorghum production * Palliative reliefs for the Flood victims * Construction of Perishable Cargo Terminal in Makurdi * Ongoing construction of Oweto Bridge to link Benue and Nasarawa State (70% Completed) * Ongoing reconstruction of Makurdi – Gboko, Wannune – Yandev Section Road * Completion of the Greater Makurdi Water Supply Scheme * Construction of Oju – Obussa – Ainu Road PLATEAU STATE: * Rehabilitation of Federal Roads: Manchok Vom road * Construction of the Faculty of Social Science, Faculty of Post Graduate Studies, International * Conference Centre and hostels in University of Jos Funded by CBN through TET Fund. * 120Mw Power sub- station in Makeri- Jos Completed. * Panshin Sub power Station * SURE – P (Subsidy Re –investment Programme) Projects in the state * Rehabilitation of Railway line from Kuru Station in Plateau state to Bauchi station * Construction of Barkin Ladi Dam in Plateau state * Rehabilitation of buildings at Police Staff College Jos * e- Wallet for Farmers and Dry Season Farming Projects. * Construction of Jarmai – Bashar road and rehabilitation of Bashir – Dengi road * Ongoing Kaduna – Jos 330kv double – circuit line, 2 x 330kv line bays extension at Jos substation * Construction of Perishable Cargo Terminal in Jos. * Rehabilitation and re – commission of the NNPC depot in Jos * Completion of the Mangu Water supply KWARA STATE: * Ilorin – Ibadan Road Fixed * Almajiri schools * e-wallet system in distribution of Agricultural inputs to farmers. * SURE – P Projects (Primary Health Care) * Rehabilitation of the Lagos – Jebba – Kano Rail Line, and Ilorin – Offa rail line. * Rehabilitation of Ilorin International Airport * CBN Project at Offa Grammar school * The Federal Government under ETF granted Uni-Ilorin ₦4.2 Billion in 2012 for the Unilorin Geological Research and Resort Centre at Aran – Orin, new faculty of Arts and Faculty of Education, Multi – Purpose hall, a central Research Laboratory and the automation of the University Library. * Dry Season farming in Kwara State at Tada – Shonga irrigation farm project * Irrigation Dam Project in Eyekonrin – Araromi * Ongoing 2 x 132kv line bays extension at Omu Aron * Construction of Perishable Cargo Terminal in Ilorin * Shonga Power sub – station * Supply of Instructional Materials to Federal Government College Ilorin SOUTH EAST GEO – POLITICAL ZONE ENUGU STATE: * Rehabilitation of the Enugu Airport (New airport Terminal) * Ongoing Nsukka – Ayangba 132kv Double – Circuit * Sure – P Projects on Primary Health Care (PHC) * Enugu – PH – Maiduguri Rail Fixed. * University of Nigeria Teaching Hospital Enugu upgraded with new facilities to commence open – heart surgeries * Rehabilitation of Enugu – Port Harcourt Road * Ogrute – Umuida Road and Unadu to Odoru in Kogi State * Rehabilitation of Umuna – Ndiagu and Ebenebe Ezeagu Road, Agubuogu through Ebenebe to Iwolo road. * ₦ 2.57 Billion Dam Project in Adada River Dam to provide Portable Water, Electricity and Irrigation for agriculture activities * Ada Rice Irrigation Project at Uzo – Uwani * Erosion control project * Export Crop preservation and Conditioning Centre in Enugu State (One of the 10 constructed nationwide ) * e – wallet System in the distribution of agricultural inputs to the farmers and Dry Season Farming Project * Construction of Irrigation Facilities in Amagunze Rice Product farm Enugu * Establishment of Enugu State office of the National Productivity Centre. * In 2012, FG Commissioned a Cultural Industry Centre in Inyi Enugu State. * Reinstatement of washout at Km 6 + 750, Km 30 + 400 and Km 35 + 325 along Onitsha- Enugu Dual – Carriage way in Anambra and Enugu State. * Establishment of Maritime Institute at University of Nigeria Nsukka EBONYI STATE: *Establishment of a Federal University in Ndufe – Alike in Ebonyi State *Rehabilitation of 43 KM Obiozara – Uburu – Ishiagu Road 37Km Oji – Achi Obeagu – Maku – Awgu – Ndeabor – Mpu – Okpanku – Akaeze Road rehabilitation. *Construction of a Storey Hostel, Class room building and Procurement at the Federal Government Girls College Ezembo, Ebonyi State *Sure – P Projects on Primary Health Centres and others *Rehabilitation of Abakaliki – Mbok Road *Establishment of a New Teaching Hospital *e – wallet system for the Distribution of Agricultural Inputs to the farmers and Dry Season Farming Project *Ongoing 2x 60MVA, 132/33KV Substation at Amasiri and 2 x 13KV Substation at Abakaliki and Abakaliki – Amasiri 132KV Double – Circuit Line *Rehabilitation of Agricultural – Skills Training Centre. *Establishment of National Obstetric Fistula Centre Abakiliki ANAMBRA STATE: *Building of Aircraft Maintenance School at Akili – Ozuzo, Ogbaru Local Government Area. *Construction of Federal Government Secretariat in Awka *Exploring Public Private Partnership to Reconstruct Second Niger Bridge (Anambra – Delta States) *FGN Funded Ecological Projects in Anambra State : Nanka/Oko Landslide Project, the Nkisi Water Works *Erosion Control/Dredging Projects in Onitsha, the Okpolo/Ire Ojoto Erosion Control Project, Alor Town *Flood Control and Road Improvement Projects in Idemili Local Government Area *Rehabilitation of Onitsha – Owerri Road to Okija – Ihembosi – Afor – Ukpor – Ebenator – Ezenifite *Onitsha River Port – Fixed and ready *National Transmission Grid installed between Benin and Onitsha to prevent usual Nationwide Grid collapse *Sure – P Projects on Primary Health Care & Transformation *e – Wallet System in the distribution of agricultural inputs to the farmers and Dry Season Farming *Ongoing Nnewi 2 x 60MVA, 132/33KV Substation 2 x 60MVA, 132/33KV Substation at Oba and 2 x 132KV *Line Bays Extension at Nnewi, 2 x 60MVA, 132/33KV *Substation at Mpu with 2 x 60KV Line Bays Extension at Nnenwe *Onitsha – Oba – Nnewi – Ideato – Okigwe 132KV *Double – Circuit Line, Ugwuaji Nnenwe 132KV Double – Circuit Line 2 x 60MVA,132/33KV Substation at Nnenwe *Nnenwe – Mpu 132KV Double – Circuit Transmission Line, Onitsha – Ifitedunu and 2 x 132KV Double – Circuit Transmission Line, 2 x 60MVA, 132/33KV Substation at Ifitedunu and 2 x 132KV Line Bays Extension at Onitsha. *Modernisation of Nnamdi Azikwe University Teaching Hospital Nnewi 1 Like |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 9:37am On Oct 20, 2017 |
IMO STATE: *NDDC Projects: St Marks Estate and Federal Housing Estate Internal Road, New Owerri Ejizie – Izuogu Road in Akeme community of Arondizogu, and the Solar Powered Water Project at Mbaoma in Owerri North & Owerri Urban Water Scheme Project, Rehabilitation of Opkpuala – Iguruta Road(Imo and Rivers States), Reconstruction of Elele – Owerri Road Sea – Port and Naval Base Project in Osse – Motor *Community (World Bank /FGN/Imo state) sponsored project. *Construction of Administrative Complex and Entrepreneurial Studies Complex in Federal University of Technology Owerri (FUTO) *Construction of the new Federal High Court Owerri division complex *Establishment and Construction of a Court of Appeal Division in Owerri *14Km Mbaise – Ngwa Road with a bridge at Imo/ Abia State (Cost ₦2.94Billoin) *SURE – P Project on Primary Health Centres and other projects *Rehabilitation of Owerri – Port Harcourt Road *Ecological Control Projects at Nekede, Saint Kzito Secondary School in Muchina and the Umuoza – Ugri Erosion Control *Rehabilitation of the Sam Mbakwe International Airport Owerri *Egbema Power Plant (338MW) *e-wallet System in distribution of the agricultural inputs to the Farmers and Dry Season Farming Project *Ongoing Mbalano 2 x 30/40MVA, 132/33KV Substation and Okigwe 2 x 30/40MVA , 132/133KV Substation *Dualisation of Ada Owerri – Ikot – Ekpene Border Section Phase one in Imo, Abia and Akwa –Ibom States *Construction of Oguta River Port in Imo State ABIA STATE: Completion of Alaoji Power Plant (1074MW) SURE – Projects on Primary Health Care (PHC) and others MDG Projects ( in partnership with the state Government) 250 Health Centres and 10 Solar Powered *Water Boreholes completed and commissioned *Rehabilitation of the Federal Roads: Mbaise – Ngwa Road with a bridge and Owerri – Aba Road *504MW Power Plant at Aba and 133KVA Substation in Umuahia (Under the Federal Government/Abia state Partnership Projects) *e – wallet system in the distribution of Agricultural Inputs to the farmers and Dry Season farming projects *Umuahia – Mbalano 132KV Line *Mbalano 2 x 30/40MVA, 132/33KV Substation *Ohafia 2 x 30/40MVA, 132/33KV Substation and Ohafia – Arochukwu 132KVA Line *Okigwe 2 x 30/40 MVA, 132/33KV Substation *Ongoing Ohafia 2 x 30 /40 MVA, 132/33KV Substation *Umuahia – Ohafia 132KV Single – Circuit Line, Umuahia – Mbalano 132KV Line, Ohafia – Arochukwu 132KV Line *Rehabilitation and Re – opening of the NNPC depot at Aba after 6years of closure. *Rehabilitation and Construction of Goodluck Jonathan Barrack in Ohafia *Establishment of Abia State Office of the National Productivity Centre. *Rehabilitation of Agricultural Skills Training Centre *NDDC – Obehia – Azumini – Ukanafun Road (Abia – Akwa Ibom) Roads Projects *Construction of a storey building for 136 Inmates at Aba Prison. SOUTH WEST GEO – POLITICAL ZONE ONDO STATE: *Omotosho I Power Plant Completed and commissioned *Omotosho II Power generating plant built from the scratch and commissioned. *Akure Airport One of the nine Airports remodelled *Benin – Ore – Shagamu duel carriage way rehabilitated after years of neglect *Akure – Ilesa express way rehabilitation *Sure – P Projects on Primary Health Care and Transportation *Erusu/ Arigidi Dam in Akoko North West Area of Ondo State under Benin – Owena River Basin Development Authority (BORBDA) *e – wallet System in Agricultural Inputs supply to the farmers *Dry Season Farming Projects *NNDC has a total of 589 Projects in Ondo State out of which 317 are already completed while 15 Mega Projects are ongoing such as Township road in Ugbo – nla, boreholes, interlocking road project, solar powered street light Projects etc. *Rehabilitation of Ipele – Idoani Road. *Construction of Federal Highway Emergency Clinics (Oka, Isua Akoko) *Periodic Maintenance of Akure – Owo Road. *2 x 60MVA, 132/33KV Substation at Okeagbe Akoko *2 x 60MVA, 132/33KV Substation at Ose Local *Government Area Headquarters Ondo State. *New Akure 2 x 150MVA, 330/132kv + 2 x 60MVA, 132/33KV Substation. *NDDC Water Project at Ukparam, ondo state *Establishment of a new Fed. Polytechnic at Ile – Oluji *In 2012, FG Commissioned at Cultural Industry Centre in Owo *Construction of MDG/NDE Skill Acquisition Centres in each of the 3 Senatorial districts of Ondo State. *Construction of Jetties at Igbokoda. LAGOS STATE: Lagos – Kano Rail Revival Commissioning of New Air Conditioned Train Coaches and other rail way Services in Lagos *SURE – P Projects on Primary Health Centre. *e – Wallet System in the distribution of the agricultural inputs to the Farmers and the Dry Season Farming Projects. *Construction of Adiuyan water works phase II near Lagos *Third Mainland Bridge phase 2 *Apapa – Orile – Mile 2 – Cele, Oshodi road rehabilitated *The Federal Government under writes a ₦40B loan for infrastructural and educational development in Lagos (2014) *Rehabilitation of the Muritala Muhammed International Airport Lagos *Lagos – Sagamu road rehabilitated *Installation of 1000 Close Circuit Television (CCTV) cameras to boost security of lives and property *Ikorodu – odogunyan – Shagamu 132KV double circuit transmission line *2 x 60 MVA, 132/33KV Substation at Odogunyan and Ayobo with 132KV double – circuit transmission line Ikeja west – Ayobo. *Omotosho – Epe – Aja 330KV double – circuit transmission Line, Omotosho – Erukan – Ogijo 330KV double Circuit transmission line *Provision of additional 2 x 150MVA, 330 / 132KV Transformer capacity at Olorunsogo transmission station. *Federal Government College Laboratory refurbished in Ijanikin – Lagos. *Rehabilitation of the National Theatre Iganmu – lagos. *Establishment of Nigerian Army dog Centre at Ipaja lagos. *Establishment of Cancer Treatment Centre at the Federal Medical Centre, Ebutte Metta. *Establishment of Maritime Institute at the University of Lagos EKITI STATE: *Establishment of a new Federal University in Oye – Ekiti *SURE – P Projects *e – wallet System in the distribution of the agricultural inputs to the farmers and the Dry Season farming projects *Rehabilitation of Ekon – Alaaye – Erinmo – Iwaraja road in Ekiti and Osun States *Omuo – Ifaki road of Ado – Ilumoba – Agbado Ikare Akoko Road sections A & B *Construction of Model Skill Acquisition Centre OSUN STATE: *Ilesha Water Project (Ilesha Dam) *Ogun – Osun River Basin Projects and Ife Dam *e – wallet System in the distribution of the agricultural inputs to the farmers and the Dry Season farming Projects *Construction of Silos *Rehabilitation of Efon – Alaaye – Erinmo Ijesha – Iwarga Road ( Ekiti – Osun States) *Oshogbo – Ede 13KV double – circuit transmission line, 2 x 60MVA, 132/ 33KV Substation at Ede *Modernisation of Obafemi Awolowo University (OAU) Teaching Hospital Ile – Ife to meet International standard. OYO STATE: *Rehabilitation of the Ibadan – Ilorin Road (Dualization of road) *Rehabilitation of the Ibadan – Lagos Road *Lagos – Ibadan new gauge Rail Line Service *University college Hospital Ibadan upgrade with facilities to commence open heart surgeries *SURE – P Projects in Primary Health Care *e – Wallet system in the distribution of the Agricultural Inputs to the farmers and the Dry season Farming Projects. *Rehabilitation of the Ibadan Air port. *Ibadan – Oyo road dualisation *Construction/ Rehabilitation of Gbogan – Iwo Road *Rehabilitation of Odo oba – Takie – Gambari otte in Oyo/Kwara States *Rehabilitation of the Old Oyo – Ogbomosho Road *2 x 60MVA, 132/33KV substation at Igangan and 132KV switching station at Igboora *New Abeokuta – Igboora – Lanlate 132KV double Circuit Transmission Line and 132KV Tee – off at Igboora – Igangan *Ganmo – Ogbomosho 132 KV Double – Circuit transmission line and 2 x 60MVA,132KV Substation at Ogbomosho *2 x 30/40MVA, 132/ 33KV Substation at Lanlate *Renovation of the Obafemi Awolowo Stadium Ibadan OGUN STATE: *Olorunsogo Power Plant (750MW) successfully completed and privatised *The Procter & Gamble Plant in Agbara Ogun States has been commission(March 17,2014) *e – wallet System in the Distribution of the agricultural inputs to the farmers *Dry Season Farming Projects *Lagos – Sagamu – Ore road rehabilitation *Rehabilitation/ Construction of Ijebu Igbo Ajegunle – Araromi – Ife – Sekona Road (Section II) in Ogun State *Rehabilitation of Otta – Owode Road in Ogun State NORTH – EAST GEO – POLITICAL ZONE TARABA STATE: *SURE – P Project on primary Health Care ( PHC) *Construction of Takum and the Kashimbila Multi – Purpose Dam Project in Yangtu. *Establishment of a new Federal University in Wakari, Taraba *e – wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming projects *Construction of Silos in Taraba State *Construction of Jalingo – Kuna Lau Road (Section II) *Reinstatement of collapsed section of Wakari – Mutum Biyu Road in Taraba State. *Rehabilitation of Wukari – Takum Road, Wukari /Akwana Road. *Ongoing reconstructionof Zing – Yakoko – Monkin Road *Construction of Perishable Cargo Terminal in Jalingo *Ongoing recinstruction of Zing – Yakoko – Monkin road. GOMBE STATE: *Reinstatement of Collapsed section of Gombe – Potiskum road *Construction of Gombe – By Pass Road *Rehabilitation of Gombe – Numan – Yola Road (Section II) *Establishment of a new Federal University in Kashere, Gombe State *SURE – P projects on Primary Health Care (PHC) *e – Wallet System in the distribution of Agricultural Inputs to the farmers and the Dry Season Farming Projects *Construction of Export Crop Preservation and Conditioning *Establishment and Construction of Special AlmajiriSchool Provision of improved Cotton Seedlings Free of Charge for farmers Rehabilitation of Tumu – Pindaiga – Kashere Road Establishment of a new Teaching Hospital BAUCHI STATE: *Federal Government spent ₦11Billion on MDG’s Project in Bauchi State as 2013. *SURE – P Projects on Primary Health Centres *e – wallet system in the distribution of the agricultural inputs to farmers and the Dry Season farming Projects – under which incentives were provided for nothing less than 10,000 Dry Season rice farmers in Bauchi State. *Construction/ Rehabilitation of Yashi – Basher – Dengi section in Bauchi and Plateau States and Rehabilitation of Futuk – Yalo Road. *Rehabilitation of Futuk – Yalo Bauchi State *Establishment of Cancers Treatment Centre in Abubakar Tafawa Balewa Teaching Hospital Bauchi ADAMAWA STATE: *Establishment and Construction of Almajiri school *Provision of improved Cotton Seedlings free of charge for farmers *e – wallet System for the distribution of agricultural inputs to the farmers and Dry Season farming Projects *Rehabilitation and remodelling the Yola Airport *SURE – P Projects on Primary Health Centres *2 x 60 MVA, 132/33KV substation at Mubi, 2 x 60 MVA, 132 / 33 KV Substations at Gulak 132 KV double circuit transmission line, 30 MVA, 132/33 KV mobitra at Mayo Belwa, Adamawa state. *A new NAF Comprehensive Secondary School Yola commissioned. *Partial State of emergency to enhance democratic stability in Adamawa, Yobe and Borno States *Completion of Yola – Numan road in Adamawa *Ongoing 30MVA, 132/33KV Mobitra at Mayo Belwa, Adamawa State. Yola – song – Litle at Gombi – Mubi – Gulak 132kv Double Circuit Transmission Line. 2 x 60 MVA, 132/33kv *Substations at song, Little Gombi, Mubi and Gulak YOBE STATE: *Gashua – Hadejia 132KV double – circuit trasnsmission line, 2 x 60MVA, 132/33KV substation at Gashua and 2 x 132KV Line Bays Extension at Damaturu and Hadejia Substations. Damaturu – Gashua 132KV double – circuit *Transmission Line and Damaturu 2 x 150 MVA, 330/132KV Substation. *SURE – P Projects on Primary Health Care (PHC) *e – Wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming. *Establishment and construction of Special Almajiri School *Provision of improved cotton Seedlings free of Charge for farmers *Gashua Power Station Desertification Control Projects: Establishment of 15 Row Green Belt (80Km) and Presidential Initiative on Afforestation BORNO STATE: *Rehabilitation of Uba – Mbala Road *Dualization of Maiduguri – Kano Road *SURE – P Projects on Primary Health Care. (PHC) *Rehabilitation of the Maiduguri Airport *Enugu – PH – Maiduguri Railway Fixed. *e – Wallet system for the distribution of agricultural inputs to the farmers at subsidized rate and *Dry Season Farming projects. *Desertification Control Projects: Establishment of 15 *Row Green Belt (80 Km) and Presidential Initiative on Afforestation *Maiduguri 1 x 150 MVA, 330/ 132KV + 1 X 6 MVA 132 /33 KV substations. *Ongoing Maiduguri 1 x 150MVA, 330/132KV + 1x 60MVA, 132/33KV Substation *33KVA Transmission substation at Damboa / Biu Road. *Completion of Uba – Mbalala Road in Borno State SOUTH – SOUTH GEO – POLITICAL ZONE EDO STATE: Ihovbor power Station (451 MW) Rehabilitation of Benin – Ore – Sagamu dual carriage way. Asphalt overlay of 2km access road to the federal Science & Technical College on Uromi Emergency reinstatement of washout/gully erosion at KM 127 + 000 at Auchi along Okene – Benin road and 14 + 000 Km along Auchi Agenebode Road Benin – Auchi road rehabilitation and dualised SURE – P Projects on Primary Health Care (PHC) Ukpoke irrigation Projects Water supply projects in Northern Ishan of Edo State (9 million litres per day plant capacity) for Uromi, Ubiaja, Ugengu, Ugboha and Igueben 1 x 60 MVA , 132/ 33kv Substation reinforcement at Ukpilla substation and 2nd Benin – Onitha 330kv single – Circuit line Land reclamation and Erosion Control works project at Igonton – Igbanke and Iyom/Okhelen – Awo road Uromi Modernisation of University of Benin Teaching Hospital, Benin. NDDC Reconstruction of Benin – Abraka phase I in 2012, FG Commissioned a cultural Industry Centre in Auchi, Edo state. Construction of Jetties at Agenebode DELTA STATE: * Ongoing construction of Itakpe – Ajaokuta – warri modern railway * Inauguration of Illah irrigation project. * Second Niger Bridge – on going with SURE – P funds * SURE – P Projects on Primary Health Care (PHC) * Rehabilitation of Warri Refinery and the access roads to the Refinery * The NNDC Sponsored Projects: Nurse quarters, electricity projects ultra modern Health Centre and Solar Powered Water project * Supply and installation of Laboratory equipment at federal University of Petroleum Resources Effurun * e – wallet system in the distribution of agricultural inputs to the farmers and the Dry Season farming projects * New Library Projects at the Federal at the federal Government College (FGC) Warri and at the federal Government Girls College Ibusa * The Proposed $16 B Gas City Project at Ogidigben in Warri South West Area of Delta State to host: A gas processing plant, a fertilizer plant and a petro chemical plant Sea Port * 1 x 60 MVA Substation at Ughelli Power Plant and 1 x 30/40 MVA Substation reinforcement at Amukpe * NDDC Construction of Orhorbo – Odurubuo, Kpakama – Bomadi road phase I, Gberegolor – Ogriagbene Road * Land reclamation and erosion control works projects in Kurutie, Gbaramatu Clan Warri South, and Idumuje – Unor Erosion Control Project. * Canalization of Odobou – Ogbobagbene creek in Burutu LGA * Construction of Model Skill Acquisition Centre and the Rehabilitation of Agric – skills Training Centre. * Completion of the Capital dredging of the Lower River Niger from Warri (Delta state) to Baro (Niger State) 532km. * Supply of instruction materials to the Federal Government College Warri * Establishment of the Nigerian Maritime University and the NIMASA Shipyard & Dockyard at Okerekoko Warri CROSS RIVER STATE: * Qua Falls Dam and Irrigation Project, Dry season Farming and e – wallet system in the distribution of agricultural inputs to the farmers * Construction of an Export Crop Preservation and conditioning centre * Ongoing Obudu – Ogoja 132kv Double – Circuit Transmission line, 2 x 30/40 MVA 132 /33kv Substation at Ogoja * Sure – P Projects on Primary Health Care and others. * Periodic maintenance of Rumukurshi – Chokocho road; Reconstruction & Pavement strengthening of Ikom – Mfum Road * Revitalised Calabar Substation (561mw) * Rehabilitation of Ikom – Mfum (Cross River) – Abakiliki – Mbok (Ebonyi) * Construction of Calabar – Ikom – Katsina – Ala Road in Benue state * Rehabilitation of Margaret Ekpo International Airport Calabar * NDDC Ubana Utanga Water Project * NDDC Electrification Project * Modernisation of the University of Calabar Teaching Hospital * Land Reclamation and Erosion control works project in Essien town – Ekorin in community. * Construction of Agric Skills Training Centre in Cross River state. AKWA IBOM STATE: * Complete of Nkari Earth dam * Construction of 100,000 metric tonnes capacity silos * e – wallet system in the distribution of agricultural inputs to the farmers and the Dry season farming projects * SURE – P Projects on Primary Health Care (PHC) * Establishment of a new Federal Polytechnic in Ukana * Approved building of Ibaka Deep Seaport * Ibedu/Ibiako Rural Electrification Projects (Under NREP) with JICA’S grant aid Intervention * Land reclamation and erosion control works project in Ibakang Nsit – Ikot Ekpo – Unyene Road, * Nsit Attai in Akwa Ibom State. * Remediation, Rehabilitation and Restoration of the Oil impacted site at stubbs Creek, Eket –Akwa Ibom. * NDDC –Idoro – Eaten – Itam Water Project * Akwa Ibom State office of National Productivity Centre was established * Construction of 3 MDG/NDE skill Acquisition centres in each of the three Senatorial Districts in Akwa Ibom RIVERS STATE: * Revived Omoku sub power station (225mw) * Port Harcourt – Enugu – Maiduguri Rail Fixed * Owerri – Port Harcourt Road ( Ongoing) * SURE – P Projects on Primary Health Care (PHC) * e – wallet in the distribution of subsided agricultural inputs to the farmers and Dry Season farming Projects * Rehabilitation of the Port Harcourt International Airport. * NDDC Electrification projects in Khana LGA and Eleme * 10 rooms hostel at Immigration Training School at Ahoada * Construction of Jetties at Degena. * Establishment of Cancer Treatment Centre in UNIPORT Teaching Hospital. * Ongoing Rehabilitation of the Port Harcourt Refinery * Transformation of the Onne Oil and Gas Free Zone with 6 billion USD invested leading to the attraction of 150 companies into the zone with 30,000 jobs created to date * Establishment of a new Federal Oil and Gas Polytechnic at Bonny BAYELSA STATE: * Periodic maintenance of East – West – Odi Road * Gbarain sub power station (225mw) revitalized * Establishment of a new federal University in Otuoke * SURE – P Project on Primary Health Care (PHC) * e –wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season Farming Projects * Construction of the federal Government Secretariat in Yanagoa. * Central Ogbia Regional Water Supply Project in Otuoke * Construction of Jetties at Yenogoa * NDDC Electrification Projects in Peremabiri – Ogbokiri in Akassa Bayelsa State. * Establishment of Maritime Institute at the Niger Delta University Amasoma. 3 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by obailala(m): 9:40am On Oct 20, 2017 |
Who is still campaigning for 2015 election in 2017? 3 Likes 2 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by erunz(m): 9:43am On Oct 20, 2017 |
Nice one, GEJ really tried his best even if he had some flaws. Buharideen over to you, show us project executed by this government in the North. 6 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by erunz(m): 9:44am On Oct 20, 2017 |
obailala:No one is campaigning we keep hearing Goodluck Jonathan did not achieve anything as president, hence this thread, nice research op 14 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by chiozor: 9:44am On Oct 20, 2017 |
thunder fire op 2 Likes 2 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by engineerboat(m): 9:46am On Oct 20, 2017 |
At OP theg will soon come for your head. This is hate speech. CC. sarrki, madridguy, myd44 7 Likes 2 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by sarrki(m): 9:46am On Oct 20, 2017 |
Blantant lie How many of this project was completed ? How many was funded ? What is the price of oil then ? Most of this projects were fraudulent 6 Likes 2 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by SalamRushdie: 9:47am On Oct 20, 2017 |
Number of Capital projects initiated or completed by Buharis since 1984 = ZERO 17 Likes 2 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 9:47am On Oct 20, 2017 |
chiozor:concentrate on the message and stop disgracing yourself in public 11 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by sarrki(m): 9:48am On Oct 20, 2017 |
father01: Don't post fake news on the forum You broke rule 8 7 Likes 4 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 9:49am On Oct 20, 2017 |
SalamRushdie:Gbam. they should tell us Buhari's achievement 11 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by SalamRushdie: 9:50am On Oct 20, 2017 |
chiozor: Concentrate on the message and wake up 7 Likes
|
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 9:52am On Oct 20, 2017 |
sarrki:Whats fake here Lagosians can testify to this *Apapa – Orile – Mile 2 – Cele, Oshodi road rehabilitated *The Federal Government under writes a ₦40B loan for infrastructural and educational development in Lagos (2014) 9 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by engineerboat(m): 9:54am On Oct 20, 2017 |
obailala: Buhari is the one still campaigning. Since theh will not allow us rest without mentioning Jonathan. So OP let us wait for their usual lies to debunk this. BMC crew over to you 10 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by engineerboat(m): 9:54am On Oct 20, 2017 |
7 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 9:55am On Oct 20, 2017 |
engineerboat:Thank you boss. 11 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by hakimi1974(m): 10:00am On Oct 20, 2017 |
@ o.p, i am from kaduna. please remove all those tissues of lies here. |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 10:01am On Oct 20, 2017 |
obailala: they are just trying to launder and repair GEJ's bad image by all means. Even a toddler knows that GEJ was a failure. It's all damage control. PMB is failing as well but for anyone to still be trying to convince us that GEJ did well and meant well is only mocking GEJ which is not fair to the Gentleman at all 6 Likes 2 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 10:03am On Oct 20, 2017 |
father01: have you passed that road of recent, I work in that axis, so don't lie here 4 Likes 3 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 10:05am On Oct 20, 2017 |
erunz: but you guys told the world that he had no flaws nah, anyway, those flaws are the reason he was kicked out, simple. Deal with it 1 Like |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 10:12am On Oct 20, 2017 |
Goke7:No one is perfect, |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 10:18am On Oct 20, 2017 |
Goke7:GEj built the road, but today he's not longer the president. It is the work of the current Administration to manage the road and its maintenance 9 Likes |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by ArewaWatch: 10:20am On Oct 20, 2017 |
hmmm |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by dirifred(m): 10:21am On Oct 20, 2017 |
How hateful can you be? ops said project completed. so start from the state where you reside, investigate the authenticity of this claim instead of asking baseless questions. you could get answers to your questions that will shock you. ops listed completed projects, that means they were funded to completion. as for the price of oil which is the cry of this present administration, please search (google or any type of search you desire) for the price of crude oil for every month from 1999 till present, you will see this is not the first time oil price was low, the difference is just that this present govt has seen that as a good excuse for doing nothing. the price of crude oil has been made popular by this govt. sarrki: 12 Likes |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by phantom24: 10:24am On Oct 20, 2017 |
sarrki:Is oil the only thing in Nigeria? How Mich oil does south Africa has? 7 Likes |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by dodelight(m): 10:25am On Oct 20, 2017 |
erunz: |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by erunz(m): 10:25am On Oct 20, 2017 |
dirifred:that's what i told them, these projects are visible but because of the hate they have for Jonathan, they will never admit its true. 3 Likes |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Basic123: 10:26am On Oct 20, 2017 |
90% OF ABOVE LISTED ACHIEVEMENTS ARE LIES! THIS PEOPLE ARE EVEN WOSE THE THE GREAT LIAR MOHAMMED# 2 Likes 2 Shares |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 10:27am On Oct 20, 2017 |
father01: from where to where? truth is GEJ failed with that project. I tell folks that If GEJ had rehabilitated that entire road stretch through the entire tin- can island port, he would have been re-elected. He only patched the road from cele to trinity and you call that rehabilitation of the entire apapa oshodi express road ba? How long has PMB been in power for that road to be as bad as it is now? You guys should stop mocking GEJ abeg, How can you do a road and within 1 year it's even worse than before it was repaired and to think we suffered terrible things during the patch patch work sef. 3 Likes 1 Share |
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 10:27am On Oct 20, 2017 |
Basic123:which state are you from, if you cannot research, we will help you 4 Likes |
Show Us Your Constituency Projects, Uko Nkole Challenges Sen. Ohuabunwa / Edo: Labour Party Adopts Indirect Primary, Pegs Guber Form At ₦25 Million / Those Obstructing Our Operations Risk A 5-Year Jail Term - EFCC
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 146 |